Page 253 - TransportationPlanUsetsGuide
P. 253
RTP
Project/
Time
Project
Project Program Name Project Start Project End Purpose Description Estimated Cost Period
(2014 dollars)
Location
Location
ID
Construct a six-foot
wide bike lane on
west side of Murray
Improve and replace exist-
Murray Blvd. Bike Farmington bicycle ing asphalt path
11240 TV Hwy. $2,900,000 Near
lane & sidewalk Rd. connectiv- with six-foot wide
ity. concrete sidewalk
and five-foot wide
planting strip. Move
railroad equipment.
Construct six-foot
Improve
Evergreen Rd. NW 215th Cornelius bicycle wide bike lanes
11241 east and westbound $2,000,000 Near
Bike Lanes Ave. Pass Rd. connectiv- and correct vertical
ity.
alignment.
Improve
US-26 at 185th/ capacity Refinement plan-
Stucki Inter- at US-26 ning and construc-
11279 N/A N/A $25,000,000 Long
change Capacity and 185th tion of interchange
Improvements inter- improvements.
change.
Improve
capac-
ity and Widen to five lanes
11284 Farmington Rd. 185th Ave. 198th Ave. safety, with bike lanes and $24,000,000 Long
bike/ped sidewalks.
and tran-
sit access
Improve
capac-
ity and Widen to five lanes
11285 Farmington Rd. 198th Ave. 209th Ave. safety, with bike lanes and $18,000,000 Long
bike/ped sidewalks.
and tran-
sit access
Construct two/
I-5/99W Con- Provide
11339 nector Southern Hwy. 99W 124th Ave. conges- three lane arterial $130,000,000 Long
Extension
with bike lanes and
Arterial tion relief.
sidewalks.
I-5/99W Con- Provide
11340 nector Southern Hwy. 99W 124th Ave. conges- Widen road to five $80,000,000 Long
Extension
lanes.
Arterial tion relief.
Improve Construct three lane
Cornelius
11341 West Union Rd. Helvetia Rd. capacity roadway with bike $25,000,000 Long
Pass
and safety lanes and sidewalks
198th Ave. Provide Widen to five lanes
11386 Improvements - TV Hwy. Alexander St. conges- with bike lanes and $3,000,000 Medium
South tion relief sidewalks
APPENDICES 233
Effective November 27, 2015 • Updated December, 15 2016