RTP
Project
Project/
Time
Project Program Name Project Start Project End Purpose Description Estimated Cost Period
Location
Location
(2014 dollars)
ID
To further
develop Project Develop-
and ad- ment through
vance the ROW acquisition/
Near Term
High Capacity corridor early construction
for High Capacity
Transit: South- identified Transit project be-
west Corridor in the HCT
10907 (Portland to Tu- N/A N/A System tween Portland and $75,000,000 Near
Tualatin via Tigard.
alatin via Tigard) Plan The project or a
- Project Develop- through portion of the proj-
ment ROW ect is outside the
acquisi- designated urban
tion to growth boundary as
include in of March 2014.
conformity
modeling.
Provide
conges-
Baseline @ 185th tion
11045 Ave. Improve- 185th Ave. Baseline relief. And Grade separate in- $24,700,000 Long
tersection and MAX.
ment improve
transit op-
erations.
Complete Complete 3800 feet
Garden Home gap in of sidewalk improve-
11089 92nd Ave. Ped. Allen Blvd. $3,922,000 Long
Blvd. pedestrian ments to transit
system. corridor
Complete Complete 2100
gap in
11090 Cornell Rd. Arrington 25th Ave. feet of bike lanes in $4,740,000 Long
bike sys- transit corridor
tem.
Complete
a regional To design and con-
Bronson
Westside Trail Creek Trail Rock Creek trail seg- struct a regional trail
11134 Trail (Kaiser ment in multi-use segment $2,675,000 Near
(Regional) (Kaiser Ridge Woods Park) THPRD’s in a utility corridor,
Park)
Trail Mas- 10’-12’ wide paved.
ter Plan.
Improve
Brookwood capac- Widen to five lanes
11140 Ihly Way Cornell Rd. with off-street side- $9,000,000 Medium
Parkway ity and walk and bikeway
safety.
Construct three-lane
Improve
West Union capac- roadway with bike
11149 Helvetia Rd. Schaaf Rd. lanes on both sides $4,000,000 Long
Rd. ity and and sidewalk on
safety.