Page 249 - TransportationPlanUsetsGuide
P. 249
RTP
Time
Project/
Project
Project Program Name Project Start Project End Purpose Description Estimated Cost Period
(2014 dollars)
Location
Location
ID
Connect streets and
construct bike lanes
102nd/103rd 2
10641 lane multimodal Western Ave. Walker Rd. Complete and sidewalks. $16,500,000 Long
a gap.
Realign intersec-
connection
tion at BH Hwy. and
Western.
110th Ave. side- Beaverton Complete
10644 Canyon Rd. Construct sidewalks. $1,400,000 Near
walk gaps Hillsdale Hwy. a gap.
Safety Reconstruct and
improve- realign three-leg
ments. intersection with a
Conges- roundabout (partial
tion relief.
Oregon-Tonquin Economic two-lane) approx.
10674 Oregon Street at Tonquin 400 feet northeast $2,300,000 Near
Roundabout develop- of existing round-
ment for about at SW Oregon
unde- St. & Murdock Rd.
veloped ROW, PE, and con-
industrial struction.
area.
Relocate Kruger Rd.
intersection 600’
northeast along
Elwert Rd. Construct
Safety
Elwert-99W-Sun- improve- roundabout at
10680 set Blvd. Improve- 99W Kruger-Cedar ments. Elwert-Kruger-Cedar $4,000,000 Near
Brook. Widen Sun-
Brook Way
ments Conges- set Blvd. approach.
tion relief.
Reconstruct 99W
intersection and
replace signal. PE,
construction.
Economic
develop-
Roy Rogers Rd. Construct road to
10708 / Tualatin-Sher- Langer Farms Borchers Dr. ment and five lane collector $1,900,000 Near
Parkway
address
wood Road standard.
safety is-
sues.
Reconstruct/widen
Economic to three lanes from
develop- 99W to Tualatin-
Tualatin-Sher- ment and Sherwood Road and
10717 Cipole ORE 99W $20,030,000 Medium
wood Rd. freight include multi-use
move- path, includes signal
ment. at Cipole and Her-
man
New road to facili-
tate development of
Economic
124th Ave. Exten- Tualatin-Sher- Grahams industrial lands,
10736 Develop- $31,000,000 Near
sion wood Rd. Ferry Rd. grade separated rail
ment.
crossing South of
Tonquin.
APPENDICES 229
Effective November 27, 2015 • Updated December, 15 2016