Page 252 - TransportationPlanUsetsGuide
P. 252
RTP
Project/
Time
Project
Project Program Name Project Start Project End Purpose Description Estimated Cost Period
Location
(2014 dollars)
Location
ID
Improve
safety, Widen to provide
bike/ped,
11158 206th Ave. Baseline Rock Rd. bike lanes and $3,000,000 Medium
school, sidewalks.
transit
access
Allows for Would avoid out-
Bridge crossing
11211 of Hwy. 26 by the a more di- of-direction bike/ $9,000,000 Medium
rect travel ped trips on a major
Westside Trail
route regional trail
Widen from two to
Provide
Walker Rd. Im- five lanes with bike
11233 185th Ave. 173rd Ave. conges- $13,570,000 Medium
provements lanes and side-
tion relief.
walks.
Widen from two to
Provide
Walker Rd. Im- five lanes with bike
11234 173rd Ave. Murray Blvd. conges- $16,600,000 Near
provements lanes and side-
tion relief.
walks.
Provide Widen from two to
conges- four lanes with turn
Walker Rd. Im- tion lanes, intersection
11235 Murray Blvd. Hwy. 217 $33,000,000 Near
provements relief and treatments, bike
enhance lanes, sidewalks
safety. and street lighting.
Widen to five lanes
Provide thru Barnes, turn
conges- lane improvements
tion relief,
Cedar Hills Blvd. at US26, signalize
11236 Butner Rd. Celeste Ln. complete $4,000,000 Medium
Improvements US26 EB, continu-
gap in ous bike lanes and
bike sys- sidewalks through
tem.
interchange area.
Reduce
arterial Connect local
conges-
Cedar Mill Local tion streets to reduce
Cedar Mill
11238 Street Connec- Town Center through out of direction $10,000,000 Medium
travel and use of
tivity Improved arterial roads for
local local trips.
street con-
nectivity.
30 miles of neigh-
borhood bikeways
(bike boulevards) on
Improve low-traffic streets
Washington
11239 County Neighbor- N/A N/A bicycle throughout unin- $16,000,000 Medium
connectiv-
corporated urban
hood Bikeways
ity. Washington County,
including enhanced
at-grade crossings
of arterials.
232 APPENDICES
Effective November 27, 2015 • Updated December, 15 2016