Page 206 - TransportationPlanUsetsGuide
P. 206

The ITS plan provides a framework of policies, procedures, and strategies for integration of Washington
                County’s existing resources to effectively meet future regional transportation needs and expectations. Key
               ADOPTED TEXT  •  The region cannot build itself out of congestion
                concepts include the following:


                   •  The region endeavors to maximize the efficiencies and improve the safety of the existing infra-
                     structure
                   •  The County strives to deliver better information about traffic conditions

                   •  The plan fosters multi-agency coordination system operations.
                   •  The Federal Highway Administration requires that all ITS projects funded through the Highway
                     Trust Fund shall be in conformance with the National ITS Architecture and applicable standards


            Traffic Control and Traveler
            Information
            The ITS plan focus on two major cat-
            egories of systems: 1) Communication
            Backbone & Centers, and 2) Arterial
            Management System and Traveler Infor-
            mation Systems. Figure 3-30 depicts the
            high-level network architecture to connect
            the operations centers operated by Wash-
            ington County, with regional operations
            centers operated by other agencies.

                                                 ODOT traveler information signs on Highway 26

            Figure 3-30: ITS Communications Backbone



































      186                                 PART 3: TRANSPORTATION MODAL ELEMENTS
                                     Effective November 27, 2015 • Updated December, 15 2016
   201   202   203   204   205   206   207   208   209   210   211