Installation overall procedure
The following steps list the sequence to be followed during installation.
Install the product following this sequence and check the operational status.
For more information on each step, refer to the sections below.
Product identification.
Check that the product part number is understood and the features match the application.
Unbox your Clean Power VFD.
Stock, carry and unpack the Clean Power VFD with caution.
Select the installation location.
Check that the environment conditions are within specifications.
Mount the Clean Power Clean Power VFD
Follow the instruction to mount your Clean Power Clean Power VFD onto its support.
Wire the power lines in and out
Follow the instructions to wire properly and safely the power cables on both input and output sides.
Wire the ground
Follow the recommendation for an efficient grounding
Wire the control signals
Follow the instructions to wire properly and safely the control signals
Check the installation
Before powering-up, follow the verification checklist.
Power-up the Clean Power VFD
How to switch-on power to the Clean Power VFD.
Configure the Clean Power VFD
Follow these instructions to set-up the Clean Power VFD.
Test the Clean Power VFD
Before operation, perform a test sequence.