Installation overall procedure

The following steps list the sequence to be followed during installation.

Install the product following this sequence and check the operational status.

For more information on each step, refer to the sections below.

  1. Product identification.

    Check that the product part number is understood and the features match the application.

  2. Unbox your Clean Power VFD.

    Stock, carry and unpack the Clean Power VFD with caution.

  3. Select the installation location.

    Check that the environment conditions are within specifications.

  4. Mount the Clean Power Clean Power VFD

    Follow the instruction to mount your Clean Power Clean Power VFD onto its support.

  5. Wire the power lines in and out

    Follow the instructions to wire properly and safely the power cables on both input and output sides.

  6. Wire the ground

    Follow the recommendation for an efficient grounding

  7. Wire the control signals

    Follow the instructions to wire properly and safely the control signals

  8. Check the installation

    Before powering-up, follow the verification checklist.

  9. Power-up the Clean Power VFD

    How to switch-on power to the Clean Power VFD.

  10. Configure the Clean Power VFD

    Follow these instructions to set-up the Clean Power VFD.

  11. Test the Clean Power VFD

    Before operation, perform a test sequence.