Navigation:  Job Editor Menu > Add >

Ellipse

Previous pageReturn to chapter overviewNext page

Adds an Ellipse to the active design.

bar_dot

 

documentNote: At least one aperture must have been previously defined.

 

 

Command Sequence

 

1. Select menu: Add  | Ellipse.

 

2. Assign the active dcode.  The active Dcode combo box, is located in the Toolbar.

 

3. Assign the active layer.  The active Layer combo box, is located in the Toolbar.

 

documentNote: New objects will be placed on the active layer.  If the active layer is turned off, you will not be able to add the new object (until that layer is turned on).

 

4. Select the First corner for the ellipse.

 

5. Select the Opposite corner for the ellipse.

 

6. Repeat Steps 2-5

 

7. To exit Add Ellipse:  Right Click or press 'Esc' .

 

8. If the command is incorrect, you may Undo.

 

documentNote: To add ellipse to a net, see Learn Guide: Add/Remove Objects from a Net

documentNote: To add ellipse to a composite, see Learn Guide: Composites 101