Requirements for Accurate Kanban Calculations
Previous Topic  Next Topic 

Kanban loop calculations available on the Point of Use Section require:

  1. Quantity per Base Container defined for transporting the material to the production line
  2. ERP Internal Order method defined as Kanban if a comparison between the ERP imported value and a system calculated value is desired.
  3. ERP Active Kanbans defined to calculate Absolute Deviation between imported ERP value and system calculated value.
  4. Material Flow plan defined.

       

 

       


See also:

Defining Internal Packaging and QPC

Material Flow Plan

Defining Material Flow Plans