Page 31 - TransportationPlanUsetsGuide
P. 31

Goal 2: Economic Vitality
                Provide a reliable transportation system that enhances the economic health of Washington
                County.

                Objective 2.1  Designate a roadway freight system that facilitates the efficient movement of goods, ser-
                vices, and agricultural equipment�
                   •  Strategy 2.1.1  Coordinate planning, development, maintenance, and operation of an efficient
                     and safe roadway freight system with the private sector, ODOT, TriMet, Metro, the Port of Port-
                     land, and the cities of Washington County.
                   •  Strategy 2.1.2  Improve monitoring, analysis and management of freight needs by maintaining a
                     truck classification count database.
                   •  Strategy 2.1.3  Develop freight reliability criteria, including percentage reduction in delay per
                     truck trip, for purposes of project prioritization.
                   •  Strategy 2.1.4  Proactively identify and correct roadway design, safety, and operational deficien-
                     cies on truck routes to meet freight reliability targets.
                   •  Strategy 2.1.5  Coordinate with federal and state agencies as necessary for compliance with
                     federal and state regulations pertaining to the safe transport of hazardous materials within and
                     through Washington County.
                   •  Strategy 2.1.6  Designate and map over-dimensional freight routes, and identify where roadway
                     improvement projects should not further restrict or limit over dimensional vehicle operations, as
                     appropriate.                                                                             ADOPTED TEXT

                Objective 2.2  Encourage the safe, efficient operation of railroad, airport and pipeline facilities.

                   •  Strategy 2.2.1  Maintain or establish safe and effective rail crossing treatments through federal
                     and state rail regulations.

                   •  Strategy 2.2.2  Protect active freight railroads from unregulated crossings and encroachment.
                   •  Strategy 2.2.3  Consider the needs of freight rail operators, including the practice of storing and
                     staging longer freight trains between road crossings.
                   •  Strategy 2.2.4  Work with public and private sector partners to preserve existing railroads and
                     railroad rights-of-way for transportation purposes or alternative public purposes, to the extent
                     practicable.
                   •  Strategy 2.2.5  Coordinate with service providers to continue the safe operation and adequate
                     maintenance of existing air, rail, and pipeline facilities; and protect such facilities from en-
                     croachment by incompatible land uses.

                   •  Strategy 2.2.6  Coordinate planning and development of new or expanded air, rail, and pipeline
                     facilities and services consistent with federal, state and regional plans and regulations, includ-
                     ing analysis of environmental and noise compatibility with surrounding land uses.


                Objective 2�3  Invest in transportation to encourage economic development�
                   •  Strategy 2.3.1  Prioritize economic development-focused transportation investments within and
                     connecting to regional centers, industrial areas, freight and passenger intermodal facilities.





                             PART 2: GENERAL TRANSPORTATION POLICIES FOR WASHINGTON COUNTY                         21
                                     Effective November 27, 2015 • Updated December, 15 2016
   26   27   28   29   30   31   32   33   34   35   36