           This partnership is transforming Cornelius Pass
           Road from five lanes (two lanes in each direction                                          SUNSET
           with a center turn lane) to three lanes in each                                                           ROCK CREEK
           direction with a center median and dedicated turn         NW
           lanes at several intersections, including the U.S. 26                   NW  IMBRIE  DRIVE                            BOULEVARD
           eastbound on-ramp, which was also widened to                                        ROAD
           three lanes. The project also highlights the partners’                                                                    NW MALHUER AVENUE
           commitment to active transportation through the                         Hillsboro   PASS                                  HIGHWAY
           construction of sidewalks on both sides of the                                                               PLACE
           roadway, a buffered bicycle lane on the west side       229TH                       CORNELIUS
                                                                                   NW EVERGREEN
           and a separated, two-way bicycle path on                                                                    NW ALOCLEK
           the east side.                                                                      NW             PARKWAY
                                                                                                        PROJECT         DRIVE
           “The size of this project created many design                                               LOCATION
           challenges for the project team,” Turki said.
           “Stormwater management, for example, was                                       DRIVE
           a huge challenge on this project. Water detention           AVENUE         RONLER
           was required in addition to treatment of the runoff.                                                  NW ALOCLEK
           This led to the construction of two large
           underground detention facilities.”                                                                                      OLSEN AVENUE
                                                                                          ROAD
           Cornelius Pass Road in the project area carries              NE        CORNELL                         NW             JOHN
           about 40,000 vehicles daily. Managing the timing                BUTLER NE                                     CORNELL  NW
           of the various construction phases with the needs   EBAY  DRIVE        S TREET        NW AMBERWOOD
                                                    NE ROS
           of travelers was a balancing act, said Zach Morris,                                                      DRIVE    NW 206TH AVENUE  ROAD
           project manager, Engineering and Construction          NE WALBRIDGE STREET
           Services division.                      NE BRIGHTON STREET
                                                                                    NW CORNELIUS PASS ROAD
           “While primarily a daytime construction project,                         CORNELL ROAD TO HIGHWAY 26                Project Location
                                                                                                                              Highways
                                                     Engineering and Construction Services
           many aspects of the work were performed at night to                                                                Major Roads
           reduce impacts to the traveling public on such a busy                                                              Minor Roads
                                                                                                                              Private Roads
           corridor,” he said. “There was a lot of effort on the part        For more information, contact:  ±                Railroads
                                                                             Capital Project Management
           of all County staff to make sure we communicated all              Main: 503-846-7800                               County Boundary
           traffic impacts to travelers and businesses to help               FAX: 503-846-7810       Map Date: November 10, 2016  Urban Growth Bdy.
                                                                             lutproj@co.washington.or.us
                                                                                                                              Cities
           reduce the impact.”                                               www.wc-roads.com              Prepared by: EDF   Rivers / Lakes
                                                                                                              Not to Scale
                                                                                                                              Streams
           The project will be completed by late December 2016,              DISCLAIMER: This product is for informational purposes and may not have been prepared for, or be suitable for legal,
                                                                             engineering or surveying purposes. Users of this information should review or consult the primary data and information
                                                    MAP LOCATION
           weather permitting. Permanent striping may not occur              sources to ascertain the usability of the information.
           until spring or summer 2017.
           “It’s been a very busy 18 months,” said Morris.
           “We appreciate how cooperative travelers and
           businesses have been. We know road construction
           is inconvenient, but we hope everyone enjoys
           the results.”

           Learn more about the Cornelius Pass Road project at
           www.co.washington.or.us/LUT/TransportationProjects/
           cornelius-pass-cornell-to-hwy-26.cfm                                                    SCAN TO READ MORE
                                                                                                   about the Cornelius
                                                                                                   Pass Road project

       25 | Celebrating People & Partnerships — LUT Annual Report FY 2015–16
   23   24   25   26   27   28   29   30   31   32   33