Demand for the part at the point of use (linefeed or work center) can be equal to plant demand if the part is used at only one linefeed or work center location within the plant.
However, if the PFEP document is describing a part being used at multiple locations within a MRP area, the point of use section will identify where the part will be consumed (which linefeed or work station) and the demand for that part at the point of use.
See also:
Loading the Master Production Schedule in FMRP