This report from HS2 Ltd reviews the development of the Phase 2a scheme grid supply point connection to the National Electricity Transmission System.

Documents

Details

The report describes the proposals contained in the hybrid Bill scheme (connecting at Rugeley substation), a summary of design development following deposit of the hybrid Bill, along with a description of the Additional Provision 2 (AP2) revised scheme connecting at the proposed Parkgate substation.

May be used by petitioners during the Select Committee when hearing evidence on the grid supply point at Parkgate.

Published 8 February 2019