Ideally, project design documents explicitly describe the expected module-to-module wire management practices crews should use in the array field.
For example, lead lengths on landscape-oriented modules are often too short to allow for proper wire management. But what if it were possible to pick up the slack in the PV array wiring and put it to good use? Standard practice for module-to-module wiring is to connect adjacent modules in a daisy chain, as shown in Figure 1a. Given adequate module lead length, leapfrog wiring can be used to connect portrait-oriented PV modules in series, as shown in Figure 1b. While the leapfrog method of stringing modules in series is not a new concept, it appears that installers are by and large unfamiliar with this option.
Traditional daisy chain wiring results in excess module lead length that installers must manage using module wire clips or wire ties, as well as one long homerun wire that they need to manage. Using leapfrog wiring with 72-cell modules, you can expect to save $10–$15 per string in sub–600 V PV systems and $17–$23 per string in 1,000 V PV systems. Depending on the reliability of the electricity supply in your location, you may want a backup generator. The convenience of backup generators is priceless, because when there is a power outage, you will normally be bitten up by mosquitoes, sweat like a pig, and wait in silence (except for that high-pitched mosquito buzzing) without television or internet access until the power is restored. This is because the fuel deteriorates, the starter battery dies, and mechanical parts can stiffen as well, preventing them from starting. So, how about a grid-tie solar power system that doubles as a backup generator, minus the smoke, vibration, and noise caused by a conventional generator?
This is possible using a combination of a switch, solar panels, and batteries, and the EnergyBridge solar generator is an example of just this.
Yes, but because of the way this system is setup, the solar panels in an EnergyBridge setup keep the batteries charged, so they can avoid this issue.
Our system is less expensive to buy than traditional battery backup and is more powerful than similar sized generators. The EnergyBridge is a hybrid inverter for photovoltaic PV installations where AC is present (Grid-tie) or can be used to provide backup power wherever AC is needed (Off-grid). Keep up to date with all the hottest cleantech news by subscribing to our (free) cleantech newsletter, or keep an eye on sector-specific news by getting our (also free) solar energy newsletter, electric vehicle newsletter, or wind energy newsletter. If you have a solar electric system, now you can use an SMA inverter to draw power directly from you solar system during the day.
So I could have a 48-panel 12 KW system on my roof, sitting up there in full sun, generating maximum rated output, and if the utility power is down for whatever reason, I get NO power from the solar panels. I do have a question, though, in that the description only talks about using it with fairly small PV systems (e.g.
It should be possible to use two inverters and split your system if you’re going to install more than 8k (or perhaps someone builds something larger).
Since most people are going to install a system larger than 0.9kW they are still going to need an inverter to handle the other 2kW+ output to the grid. Like Ron says below, there are inverters which will handle the entire array and allow battery storage on a large scale if that’s what people want. We’ve got someone from WV on our team who has had to go without power for many days a few times in the past year or so.
While this system may not be for everyone, it certainly has some benefits that crush those of a conventional backup generator.


The reason why this system is unique is that it is grid-tied when the grid is available, selling power back to the grid and reducing your energy bill.
The grid won’t pay much for the solar you store during the day and sell back during off-peak hours. You can’t generate solar for less than 12 cents or so and it is going to cost something (probably a significant amount) to store it. The price is $2150 for the 2.4kWh package via Kickstarter Feel free to click on the links above for more information. Bob, without some sort of buffering, panels are useless, even if you could disable the grid cutoff function in their inverters, because the intermittent power could cream your devices, however few you have connected. Well, you know what, it ought to be competitive, mandatorily, because the other stuff is storing up a world of pain for us. When this is not the case, field technicians are left to develop and implement their own wire management solutions. When performing due diligence on PV systems with landscape-oriented modules prior to system commissioning, I have come across module leads that did not comply with the conductor bending radius requirements found in NEC Section 300.34. Here, I present a simple source-circuit wiring technique for portrait-oriented PV arrays that can turn the liability associated with excess module lead length into a cost-savings opportunity. Excess module lead length is often coiled up and organized using some type of PV cable clip.
In this scenario, the excess module lead is used to leap over adjacent modules, so that every other module in the row is connected in series until the end of the row is reached.
Only one of the integrators I spoke with in Massachusetts was aware of this wiring strategy.
With the leapfrog wiring method, there is no excess lead length apart from one module-to-module connection in the middle of the string (at the end of the row); further, the total length of the homerun wiring is reduced by roughly the width of the row of modules. Since each 72-cell PV module is roughly 3 feet wide, leapfrog wiring will reduce the length of your homerun conductor by roughly 33–36 feet per string in 600 V designs and 51–60 feet per string in 1,000 V designs. They are usually diesel or gasoline fueled, but they can very well be fueled using sunshine.
The EnergyBridge is currently on Kickstarter, trying to raise money for Underwriters Laboratory (UL) safety testing to hopefully receive a UL 1741 certification. Batteries gradually lose their charge over a period ranging from one month to one year, depending on the type of battery, and they will deteriorate to the point where they are unrecoverable if left sitting long enough. When power finally comes back on the EnergyBridge continues to work, charging its batteries and even selling the excess power back to the power company. He has a keen interest in physics-intensive topics such as electricity generation, refrigeration and air conditioning technology, energy storage, and geography. As you mentioned in your article, before solar inverters always shut down after a power blackout in order to protect the people working on the gird. When the power goes out, the unit will automatically go into off-grid mode and supply the critical loads plugged into it.
We wanted to make a similar comparison when referring to EnergyBridge because it is a grid-tie unit as well as a backup power source.
These ad hoc solutions are not always Code compliant and may compromise project reliability. I have even discovered module leads pulled so taut that the conductor insulation split at the cable gland, effectively voiding the product warranty. Where this excess wire is not managed properly, it increases the likelihood of conductor or J-box damage, which could result in a ground fault or an arcing fault.


Where modules in the same string are mechanically mounted in the same row, the positive and negative homerun connections invariably wind up on opposite ends of the mechanical assembly. In my experience, nearly every 60- or 72-cell module with a lead length of 1,100 mm or longer can accommodate leapfrog wiring.
Our simple installation allows any user to connect solar and solar backup to their home or business. A solar inverter that does this is already developed and grid compliant in most European countries including the UK. One problem with the current set up is that if the grid goes down, my panels become useless as my inverters are powered by the grid. And they had to spend a fortune driving very long distances to get fuel for their generator. While off-grid your panels will be keeping your batteries charged to run all of your critical loads plugged into the EnergyBridge.
While the price of your generator is going up over time, the EnergyBridge cost goes down over time, eventually making you money in the long run. The traditional approach to wiring a portrait-oriented PV array is to use some combination of labor and hardware to manage excess wire.
Both the positive and negative home-run connections wind up on one end of the row of modules. In addition, you can expect to save one or two cable clips per module at perhaps $0.20 each. That way, you will have your backup system available and achieve maximum potential from your panel investment. If the addition of this could help me keep my inverters running, it would be a tremendous value added.
When the power goes out (and it will), you will have 2400 watt-hours of energy at your disposal. For example, the installers might coil up the excess lead length and use module wire clips to hold everything in place. Also, note that lead length is not the only determining factor, since the mounting system is often used to facilitate wire management. You can easily modify these assumptions to account for your company’s preferred hardware solutions and the associated costs, which will vary based on purchase volume.
Typically, one needs the most power on the hottest and sunniest days – just when the panels are also producing the most. I would suggest partitioning your PV array and using 900 Watts of it to use with the EnergyBridge as a backup power system.
With the 900W solar array, you will fully charge your batteries and keep your loads running during the day (based on 5 hours of sunlight and a 120W constant load).
Before specifying this wiring method, the system designer must verify that the lead length is adequate after accounting for conductor routing as it relates to the racking system. With the batteries to get you through the night and solar to charge your batteries during the day, your fridge can run for a very long time when the power is down.