IN THE HIGH COURT OF GUJARAT AT AHMEDABAD CIVIL APPLICATION No 1187 of 1997 in CIVIL APPLICATIONNo 4532 of 1996 -------------------------------------------------------------- CHEMSTAR ORGANICS (I) LTD Versus SUO MOTU -------------------------------------------------------------- Appearance: MR DARSHAN M PARIKH for Petitioners GOVERNMENT PLEADER for Respondent No. 2 MR YF MEHTA for Respondent No. 5 -------------------------------------------------------------- CORAM : MR.JUSTICE B.C.PATEL and MR.JUSTICE M.S.SHAH Date of Order: 29/01/97 ORAL ORDER
In view of the report of NEERI, the unit has filed this application. Nandesari Industries Association has also placed the analysis report of the effluent, which is ordered to be taken on record.
After hearing learned Advocates, we grant permission to the unit for trial production of (1). Parachloro Benzyl Cyanide, (2). Alpha Nephthyl Acetic Acid, (3). Benzyl Cyanide, and, (4). Fenvalerate Technical, till 26.2.1997, subject to the usual terms and conditions annexed herewith.
The permission for trial production of Meta Phenoxy Benzyl Dehyde and Benzyle Benzote granted earlier is ordered to be continued till 26.2.1997, on the same terms and conditions.
Modi Committee is requested to take the samples and to submit the analysis report. Before taking the samples, learned Advocate Mr. Sahani and Nandesar..... to enable them to remain present at the time of collecting the sample. The unit is directed to deposit a sum of Rs.15,000/- with this Court within a period of one week, for the visit of the Modi Committee.
We also request NEERI to visit the unit and to submit their report to this Court. The unit is also directed to deposit the usual charges of Rs.One Lakh with this Court for this purpose, within a period of two weeks from today.
Matter stands adjourned to 19.2.1997.
(B.C. PATEL, J.) csm./(M.S. SHAH, J.) IN THE HIGH COURT OF GUJARAT AT AHMEDABAD SPECIAL CIVIL APPLN NO.
ANNEXURE TO ORDER DATED: 27.1.1997 GENERAL TERMS & CONDITIONS FOR CHEMICAL INDUSTRIES PRODUCTS:
1. The manufacturing/processing activities of the Unit shall be confined to the product/s mentioned in its application to the GPCB for consent under the Water (Prevention and Control of Pollution) Act,1974; Air(Prevention and Control of Polution ) Act, 1981 and in its application for authorisation under the Hazardous Wastes (Management and Handling ) Rules, 1989. The Unit shall not manufacture or process any other product. If the product/process falls in Schedule I or II to the Scheme of Environmental Audit the Unit shall also abide by the said Scheme. The application for consent/authorization shall mean the last application before this order.
PROHIBITION AGAINST REMOVAL/SALE OF GOODS:
2. The unit shall undertake production/ processing activities only for the limited purpose of satisfying the GPCB and other monitoring agencies that the unit meets with all the norms prescribed by the GPCB for the treatment of the effluent.Hence the Unit shall not remove the goods from the factory premises nor shall the unit issue any Excise Gate-pass without prior permission of the Court.
EFFLUENT TREATMENT:
3(a). The unit shall operate fully and efficiently all its effluent treatment plant/s and shall close down all its manufacturing/processing activities whenever the effluent treatment plant/s or any part thereof are fully or partly non-operational for any reason whatsoever (whether for maintenance/repairs/electricity failure or otherwise) and shall not restart such activities unless and until all the effluent treatment plants of the unit are fully operational.
(b) The Unit shall have and operate all the requisite equipments/facilities for prevention and control of air pollution and shall operate the same. The unit shall also have stackmonitoring facilities.Whenever the equipments/facilities for prevention and control of air pollution are fully or partly nonfunctional, the unit shall close down all its manufacturing /processing activities and shall not restart its manufacturing/processing activities unless and until all its air pollution protection and control equipments and facilities including stock monitoring facilities are fully operational.
(c). The Unit shall make all the requisite arrangements for the safe storage and handling of solid waste including impervious flooring and leachate collection and the unit shall store and handle solid waste in accordance with the provisions of the relevant rules in this behalf.
EFFLUENT DISPOSAL:
4. The unit shall have and use only one outlet for the discharge of its effluent and no effluent shall be discharged without requisite treatment and without meeting with the GPCB norms. Such outlet shall be near the front gate /entrance of the unit. The unit shall not keep any bypass line or system, or loose or flexible pipe for discharging effluent outside or even for transporting treated or untreated effluent within the factory premises, within effluent treatment plants or in the compound of the unit.
DISPLAY BOARDS AND LIGHTING:
(5). The Unit shall, within one week from the date of the order:
(a). put up at the entrance and prominent places boards prominently displaying the name of the unit, particulars of the products/process and the names of the Proprietor/Partners/Directors of the Unit, the electricity consumer number and the name of the electricity consumer as on the record of the AEC/GEB.
(b). put up a board displaying the details mentioned in para 6(a) hereinafter.
(c) make adequate lighting arrangements all around the Effluent Treatment Plants and also above the boards mentioned in both the above clauses;
INFORMATION TO BE SUPPLIED TO THE GPCB & OTHERS:
6(a). The Unit shall submit, within one week from the date of the order, to the GPCB and the Chairman of the Coordinating Committee appointed by the Court, the site plan of the unit indicating the location of manufacturing/processing plants as also the effluent treatment plants, and also a separate plan indicating the channel through which water/ effluent passes from different stages of manufacturing/processing and the effluent treatment process right upto the stage of its final outlet. Such plans shall also be displayed by the Unit on a Board of adequate size within its compound and near its effluent treatment plant/s.
(b). The Unit shall, within one week from the date of the order, furnish to the GPCB and the Chairman of the Coordinating Committee details about the raw materials and the nature of manufacturing process/ reactions.
(c). The unit shall supply to the GPCB the figures of production and consumption of electricity and water for each day during the period of trial production, though such figures shall be supplied on weekly basis. The unit shall supply separate figures for consumption of electricity for running the effluent treatment plant/s by having a separate meter/sub-meter for such effluent treatment plant/s. The number of Units consumed by operating the diesel generating sets,if any, shall also be supplied to the GPCB on weekly basis.
(d) The Unit shall also supply to the GPCB, within one week from the date of the order, the documents regarding monthly production and consumption of electricity in the six months prior to the date on which the unit was closed.
ENTRY & INSPECTION :
7(a). The unit shall permit the officers/employees of the GPCB/AMC/Govt., Member/s of the Coordinating Committee appointed by this Court, Member/s of the monitoring Committee of the Association/s of the Industries to enter the factory premises and to inspect and take samples from the unit at any time without any prior intimation. Any delay in giving any of the above persons entry into the factory premises or any part thereof or effluent treatment plants shall entail closure of the unit. All the watchmen /security personnel of the unit shall be immediately appraised of the above.
(b). It shall be open to the GPCB through general instructions or circulars and to the GPCB Officer/s inspecting the Unit to give on the spot instructions regarding location of the outlet and/or any other appropriate directions regarding effluent treatment plants, their operations and processes and disposal channel and disposal system. The Unit shall comply with all such instructions, whether general or special.
FUTURE PAYMENTS :
8(a). The unit shall deposit an amount of Rs.4000/on each occasion when sampleS are taken by the GPCB. The unit shall initially deposit with the GPCB Rs.4000/- for the first sample, within one week from the date of the order.
(b). The unit shall pay all the instalments of the contribution/s for laying,maintaining and repairing effluent drainage pipeline/s as and when demanded by a public authority or by the Association of Industries in the area or as and when ordered by this Court.
(c). The unit shall pay the Association of Industries in the area and the body running the CETP in the area all charges and contributions demanded by them for setting up the CETP and for operating maintaining and repairing it and for laying, maintaining and repairing the internal drainage line upto CETP and connected activities.
(d). The Unit shall pay the Association of Industries in the area and the body managing the Solid Waste Dumping site for the industries in the area all the charges and contributions as and when demanded by them for preparing the dumping site, removing solid wazste to such site and for connected activities.
(e). The unit shall pay such amount as may be determined by the Court/Govt./GPCB/Association for compensation and remedial measures for the affected areas and people and for monitoring, for the period after commencement of trial production.
IN THE EVENT OF CLOSURE:
9. When electricity supply or water supply is disconnected in future on account of noncompliance with the GPCB norms or on account of the closure order which may be passed by this Court or by the Government/GPCB under any statutory provisions relating to environmental protection and prevention and control of pollution;
(a) the unit shall not use any diesel generating set or any other alternative source of energy;
(b) the Unit shall pay wages to its workers regularly every month or at such shorter intervals as per the central/practice followed so far.
...