INSTALLATION




1. Clean and inspect gasket sealing surfaces.
2. Install new gasket on cylinder head.



3. Lubricate lifter ball end of lifter(s), valve(s), and rocker arm roller(s) with Mopar Engine Oil Supplement or equivlalent.
4. Connect rocker arm(s) to lifter and reposition on valve(s).
5. Install cylinder head cover/intake manifold
(Refer to 9 - ENGINE/CYLINDER HEAD/CYLINDER HEAD COVER(S) - INSTALLATION).


6. Install inner timing belt cover
(Refer to 9 - ENGINE/VALVE TIMING/TIMING BELT / CHAIN COVER(S) - INSTALLATION).
7. Install timing belt (Refer to 9 - ENGINE/VALVE TIMING/TIMING BELT/CHAIN AND SPROCKETS - INSTALLATION).
8. Install outer timing belt cover (Refer to 9 - ENGINE/VALVE TIMING/TIMING BELT / CHAIN COVER(S) - INSTALLATION).


9. Install vibration damper.
10. Install cooling fan support
(Refer to 7 - COOLING/ENGINE/RADIATOR FAN - INSTALLATION) .
11. Install accessory drive belt (Refer to 7 - COOLING/ACCESSORY DRIVE/DRIVE BELTS - INSTALLATION).
12. Install cooling fan and fan drive viscous clutch assembly (Refer to 7 - COOLING/ENGINE/FAN DRIVE VISCOUS CLUTCH - INSTALLATION).
13. Refill cooling system. (Refer to 7 - COOLING - STANDARD PROCEDURE)
14. Connect negative battery cable.