INSTALLATION




1. Install the door glass into the door through the window opening and position into the bottom of the door.
2. Install the stationary glass and weatherstrip and seat fully.
3. Install the division bar bolt and tighten to 12 Nm (9 ft. lbs.).
4. Install the outer belt molding.
5. Position the glass into the full up position and secure in place using tape or other suitable device.
6. Install the glass run channel (1) and install the nut (2).
7. Tighten the nut to 10 Nm (90 in. lbs.).





8. Install the carrier plate (6),
(Refer to 23 - BODY/DOORS - REAR/CARRIER PLATE - INSTALLATION).