 ZONEBUDGET version 3.01                 
 Program to compute a flow budget for subregions of a model using
 budget data from MODFLOW, the USGS Modular Ground-Water Flow Model.
 
  The cell-by-cell budget file is:
 avgrid.ccf                                                                      
  Double precision budget file
          3 layers        43 rows        60 columns
 
                                                                                 
 
 Zone block: LAYERS   1-  3    ROWS    1-  43    COLUMNS    1-  60    VALUE:   1
 1  zones.
    1
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   1
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    0.0000    
                  DELAY IB STORAGE =    0.0000    
 
                          Total IN =   0.36175E+07
 
             OUT:
             ----
                     CONSTANT HEAD =    66777.    
                             WELLS =    0.0000    
                                ET =   0.35511E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    0.0000    
                  DELAY IB STORAGE =    0.0000    
 
                         Total OUT =   0.36179E+07
 
                          IN - OUT =   -386.18    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   2
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.20316E+06
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    17866.    
                  DELAY IB STORAGE =    135.16    
 
                          Total IN =   0.38386E+07
 
             OUT:
             ----
                           STORAGE =    1338.2    
                     CONSTANT HEAD =    66777.    
                             WELLS =   0.22125E+06
                                ET =   0.35511E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    77.150    
                  DELAY IB STORAGE =   0.58152    
 
                         Total OUT =   0.38405E+07
 
                          IN - OUT =   -1882.6    
 
               Percent Discrepancy =               -0.05
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period   2
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.21235E+06
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    8212.8    
                  DELAY IB STORAGE =    311.59    
 
                          Total IN =   0.38383E+07
 
             OUT:
             ----
                           STORAGE =    1311.6    
                     CONSTANT HEAD =    66777.    
                             WELLS =   0.22125E+06
                                ET =   0.35510E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    44.187    
                  DELAY IB STORAGE =    1.5142    
 
                         Total OUT =   0.38404E+07
 
                          IN - OUT =   -2041.6    
 
               Percent Discrepancy =               -0.05
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period   2
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.21741E+06
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    2624.3    
                  DELAY IB STORAGE =    381.53    
 
                          Total IN =   0.38379E+07
 
             OUT:
             ----
                           STORAGE =    1282.4    
                     CONSTANT HEAD =    66777.    
                             WELLS =   0.22125E+06
                                ET =   0.35508E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    19.174    
                  DELAY IB STORAGE =    2.2182    
 
                         Total OUT =   0.38401E+07
 
                          IN - OUT =   -2195.0    
 
               Percent Discrepancy =               -0.06
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period   2
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.21801E+06
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    883.01    
                  DELAY IB STORAGE =    281.53    
 
                          Total IN =   0.38366E+07
 
             OUT:
             ----
                           STORAGE =    1175.4    
                     CONSTANT HEAD =    66777.    
                             WELLS =   0.22125E+06
                                ET =   0.35498E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    6.8755    
                  DELAY IB STORAGE =    1.8550    
 
                         Total OUT =   0.38391E+07
 
                          IN - OUT =   -2413.6    
 
               Percent Discrepancy =               -0.06
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period   2
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.21440E+06
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    519.84    
                  DELAY IB STORAGE =    149.68    
 
                          Total IN =   0.38325E+07
 
             OUT:
             ----
                           STORAGE =    983.30    
                     CONSTANT HEAD =    66777.    
                             WELLS =   0.22125E+06
                                ET =   0.35467E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    2.5893    
                  DELAY IB STORAGE =   0.85369    
 
                         Total OUT =   0.38357E+07
 
                          IN - OUT =   -3187.4    
 
               Percent Discrepancy =               -0.08
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period   2
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.20623E+06
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    411.85    
                  DELAY IB STORAGE =    92.243    
 
                          Total IN =   0.38242E+07
 
             OUT:
             ----
                           STORAGE =    756.91    
                     CONSTANT HEAD =    66777.    
                             WELLS =   0.22125E+06
                                ET =   0.35372E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.5755    
                  DELAY IB STORAGE =   0.36259    
 
                         Total OUT =   0.38260E+07
 
                          IN - OUT =   -1812.3    
 
               Percent Discrepancy =               -0.05
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   3
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.63678E+06
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    38581.    
                  DELAY IB STORAGE =    423.65    
 
                          Total IN =   0.42933E+07
 
             OUT:
             ----
                           STORAGE =    791.45    
                     CONSTANT HEAD =    66777.    
                             WELLS =   0.69421E+06
                                ET =   0.35372E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    15.268    
                  DELAY IB STORAGE =    1.4755    
 
                         Total OUT =   0.42990E+07
 
                          IN - OUT =   -5716.0    
 
               Percent Discrepancy =               -0.13
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period   3
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.65687E+06
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    17592.    
                  DELAY IB STORAGE =    784.76    
 
                          Total IN =   0.42927E+07
 
             OUT:
             ----
                           STORAGE =    782.51    
                     CONSTANT HEAD =    66777.    
                             WELLS =   0.69421E+06
                                ET =   0.35370E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    8.1668    
                  DELAY IB STORAGE =    1.4498    
 
                         Total OUT =   0.42988E+07
 
                          IN - OUT =   -6050.7    
 
               Percent Discrepancy =               -0.14
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period   3
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.67187E+06
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    5875.7    
                  DELAY IB STORAGE =    920.53    
 
                          Total IN =   0.42961E+07
 
             OUT:
             ----
                           STORAGE =    772.56    
                     CONSTANT HEAD =    66777.    
                             WELLS =   0.69421E+06
                                ET =   0.35363E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    3.7090    
                  DELAY IB STORAGE =    1.1871    
 
                         Total OUT =   0.42980E+07
 
                          IN - OUT =   -1901.3    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period   3
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.67294E+06
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    2253.7    
                  DELAY IB STORAGE =    691.76    
 
                          Total IN =   0.42934E+07
 
             OUT:
             ----
                           STORAGE =    746.49    
                     CONSTANT HEAD =    66777.    
                             WELLS =   0.69421E+06
                                ET =   0.35337E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.8716    
                  DELAY IB STORAGE =   0.66027    
 
                         Total OUT =   0.42954E+07
 
                          IN - OUT =   -2080.9    
 
               Percent Discrepancy =               -0.05
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period   3
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.66584E+06
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    1507.6    
                  DELAY IB STORAGE =    407.09    
 
                          Total IN =   0.42852E+07
 
             OUT:
             ----
                           STORAGE =    703.15    
                     CONSTANT HEAD =    66778.    
                             WELLS =   0.69421E+06
                                ET =   0.35249E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.4638    
                  DELAY IB STORAGE =   0.32118    
 
                         Total OUT =   0.42866E+07
 
                          IN - OUT =   -1334.0    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period   3
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.63667E+06
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    1239.9    
                  DELAY IB STORAGE =    271.16    
 
                          Total IN =   0.42557E+07
 
             OUT:
             ----
                           STORAGE =    610.64    
                     CONSTANT HEAD =    66779.    
                             WELLS =   0.69421E+06
                                ET =   0.34975E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.2792    
                  DELAY IB STORAGE =   0.25638    
 
                         Total OUT =   0.42591E+07
 
                          IN - OUT =   -3446.4    
 
               Percent Discrepancy =               -0.08
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   4
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.11612E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    48043.    
                  DELAY IB STORAGE =    748.71    
 
                          Total IN =   0.48275E+07
 
             OUT:
             ----
                           STORAGE =    653.68    
                     CONSTANT HEAD =    66779.    
                             WELLS =   0.12727E+07
                                ET =   0.34974E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    18.554    
                  DELAY IB STORAGE =    3.4128    
 
                         Total OUT =   0.48376E+07
 
                          IN - OUT =   -10121.    
 
               Percent Discrepancy =               -0.21
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period   4
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.11928E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    22621.    
                  DELAY IB STORAGE =    1196.4    
 
                          Total IN =   0.48341E+07
 
             OUT:
             ----
                           STORAGE =    648.99    
                     CONSTANT HEAD =    66779.    
                             WELLS =   0.12727E+07
                                ET =   0.34970E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    10.480    
                  DELAY IB STORAGE =    3.1542    
 
                         Total OUT =   0.48372E+07
 
                          IN - OUT =   -3156.8    
 
               Percent Discrepancy =               -0.07
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period   4
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12058E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    7985.7    
                  DELAY IB STORAGE =    1334.0    
 
                          Total IN =   0.48326E+07
 
             OUT:
             ----
                           STORAGE =    634.88    
                     CONSTANT HEAD =    66779.    
                             WELLS =   0.12727E+07
                                ET =   0.34958E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    4.2342    
                  DELAY IB STORAGE =    2.2974    
 
                         Total OUT =   0.48359E+07
 
                          IN - OUT =   -3286.9    
 
               Percent Discrepancy =               -0.07
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period   4
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12080E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    3519.9    
                  DELAY IB STORAGE =    1026.4    
 
                          Total IN =   0.48300E+07
 
             OUT:
             ----
                           STORAGE =    616.52    
                     CONSTANT HEAD =    66779.    
                             WELLS =   0.12727E+07
                                ET =   0.34912E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.8056    
                  DELAY IB STORAGE =    1.0322    
 
                         Total OUT =   0.48313E+07
 
                          IN - OUT =   -1354.4    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period   4
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.11930E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    2559.7    
                  DELAY IB STORAGE =    655.54    
 
                          Total IN =   0.48137E+07
 
             OUT:
             ----
                           STORAGE =    592.07    
                     CONSTANT HEAD =    66779.    
                             WELLS =   0.12727E+07
                                ET =   0.34758E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.2708    
                  DELAY IB STORAGE =   0.27432    
 
                         Total OUT =   0.48159E+07
 
                          IN - OUT =   -2236.5    
 
               Percent Discrepancy =               -0.05
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period   4
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.11454E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    2196.8    
                  DELAY IB STORAGE =    475.06    
 
                          Total IN =   0.47655E+07
 
             OUT:
             ----
                           STORAGE =    541.17    
                     CONSTANT HEAD =    66780.    
                             WELLS =   0.12727E+07
                                ET =   0.34283E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.1790    
                  DELAY IB STORAGE =   0.23355    
 
                         Total OUT =   0.47684E+07
 
                          IN - OUT =   -2832.6    
 
               Percent Discrepancy =               -0.06
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   5
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16651E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    48931.    
                  DELAY IB STORAGE =    1021.5    
 
                          Total IN =   0.53325E+07
 
             OUT:
             ----
                           STORAGE =    577.95    
                     CONSTANT HEAD =    66780.    
                             WELLS =   0.18512E+07
                                ET =   0.34282E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    15.921    
                  DELAY IB STORAGE =    5.9736    
 
                         Total OUT =   0.53468E+07
 
                          IN - OUT =   -14246.    
 
               Percent Discrepancy =               -0.27
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period   5
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16994E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    23542.    
                  DELAY IB STORAGE =    1457.2    
 
                          Total IN =   0.53419E+07
 
             OUT:
             ----
                           STORAGE =    574.09    
                     CONSTANT HEAD =    66780.    
                             WELLS =   0.18512E+07
                                ET =   0.34277E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    9.0839    
                  DELAY IB STORAGE =    5.2815    
 
                         Total OUT =   0.53463E+07
 
                          IN - OUT =   -4397.9    
 
               Percent Discrepancy =               -0.08
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period   5
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.17121E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    8867.2    
                  DELAY IB STORAGE =    1569.8    
 
                          Total IN =   0.53400E+07
 
             OUT:
             ----
                           STORAGE =    561.88    
                     CONSTANT HEAD =    66780.    
                             WELLS =   0.18512E+07
                                ET =   0.34259E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    3.7864    
                  DELAY IB STORAGE =    3.6099    
 
                         Total OUT =   0.53445E+07
 
                          IN - OUT =   -4463.6    
 
               Percent Discrepancy =               -0.08
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period   5
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.17133E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    4440.9    
                  DELAY IB STORAGE =    1237.2    
 
                          Total IN =   0.53364E+07
 
             OUT:
             ----
                           STORAGE =    546.03    
                     CONSTANT HEAD =    66780.    
                             WELLS =   0.18512E+07
                                ET =   0.34197E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.5987    
                  DELAY IB STORAGE =    1.4829    
 
                         Total OUT =   0.53382E+07
 
                          IN - OUT =   -1809.7    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period   5
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16925E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    3473.9    
                  DELAY IB STORAGE =    850.59    
 
                          Total IN =   0.53142E+07
 
             OUT:
             ----
                           STORAGE =    532.83    
                     CONSTANT HEAD =    66781.    
                             WELLS =   0.18512E+07
                                ET =   0.33987E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.1724    
                  DELAY IB STORAGE =   0.25641    
 
                         Total OUT =   0.53173E+07
 
                          IN - OUT =   -3020.7    
 
               Percent Discrepancy =               -0.06
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period   5
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16271E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    3074.0    
                  DELAY IB STORAGE =    660.47    
 
                          Total IN =   0.52483E+07
 
             OUT:
             ----
                           STORAGE =    510.67    
                     CONSTANT HEAD =    66782.    
                             WELLS =   0.18512E+07
                                ET =   0.33338E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.1278    
                  DELAY IB STORAGE =   0.22399    
 
                         Total OUT =   0.52523E+07
 
                          IN - OUT =   -3960.5    
 
               Percent Discrepancy =               -0.08
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   6
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.23692E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    67920.    
                  DELAY IB STORAGE =    1371.8    
 
                          Total IN =   0.60559E+07
 
             OUT:
             ----
                           STORAGE =    557.54    
                     CONSTANT HEAD =    66782.    
                             WELLS =   0.26610E+07
                                ET =   0.33336E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    18.754    
                  DELAY IB STORAGE =    7.0785    
 
                         Total OUT =   0.60620E+07
 
                          IN - OUT =   -6036.5    
 
               Percent Discrepancy =               -0.10
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period   6
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.24033E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    32284.    
                  DELAY IB STORAGE =    1969.0    
 
                          Total IN =   0.60551E+07
 
             OUT:
             ----
                           STORAGE =    548.82    
                     CONSTANT HEAD =    66782.    
                             WELLS =   0.26610E+07
                                ET =   0.33329E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    10.412    
                  DELAY IB STORAGE =    6.2300    
 
                         Total OUT =   0.60613E+07
 
                          IN - OUT =   -6208.4    
 
               Percent Discrepancy =               -0.10
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period   6
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.24247E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    12326.    
                  DELAY IB STORAGE =    2142.5    
 
                          Total IN =   0.60567E+07
 
             OUT:
             ----
                           STORAGE =    535.67    
                     CONSTANT HEAD =    66782.    
                             WELLS =   0.26610E+07
                                ET =   0.33304E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    4.1361    
                  DELAY IB STORAGE =    4.2139    
 
                         Total OUT =   0.60588E+07
 
                          IN - OUT =   -2121.5    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period   6
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.24223E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    6209.3    
                  DELAY IB STORAGE =    1709.1    
 
                          Total IN =   0.60477E+07
 
             OUT:
             ----
                           STORAGE =    517.61    
                     CONSTANT HEAD =    66782.    
                             WELLS =   0.26610E+07
                                ET =   0.33219E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.5378    
                  DELAY IB STORAGE =    1.6835    
 
                         Total OUT =   0.60502E+07
 
                          IN - OUT =   -2546.9    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period   6
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.23933E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    4885.7    
                  DELAY IB STORAGE =    1189.3    
 
                          Total IN =   0.60169E+07
 
             OUT:
             ----
                           STORAGE =    509.71    
                     CONSTANT HEAD =    66783.    
                             WELLS =   0.26610E+07
                                ET =   0.32928E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.1321    
                  DELAY IB STORAGE =   0.24671    
 
                         Total OUT =   0.60211E+07
 
                          IN - OUT =   -4251.5    
 
               Percent Discrepancy =               -0.07
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period   6
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.23074E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    4341.2    
                  DELAY IB STORAGE =    932.74    
 
                          Total IN =   0.59301E+07
 
             OUT:
             ----
                           STORAGE =    501.04    
                     CONSTANT HEAD =    66784.    
                             WELLS =   0.26610E+07
                                ET =   0.32040E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.1164    
                  DELAY IB STORAGE =   0.21980    
 
                         Total OUT =   0.59323E+07
 
                          IN - OUT =   -2162.7    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   7
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.30462E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    69026.    
                  DELAY IB STORAGE =    1696.8    
 
                          Total IN =   0.67344E+07
 
             OUT:
             ----
                           STORAGE =    526.31    
                     CONSTANT HEAD =    66784.    
                             WELLS =   0.34710E+07
                                ET =   0.32037E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    12.239    
                  DELAY IB STORAGE =    10.790    
 
                         Total OUT =   0.67421E+07
 
                          IN - OUT =   -7690.6    
 
               Percent Discrepancy =               -0.11
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period   7
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.30802E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    33425.    
                  DELAY IB STORAGE =    2281.3    
 
                          Total IN =   0.67334E+07
 
             OUT:
             ----
                           STORAGE =    519.22    
                     CONSTANT HEAD =    66784.    
                             WELLS =   0.34710E+07
                                ET =   0.32029E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    6.3211    
                  DELAY IB STORAGE =    9.2850    
 
                         Total OUT =   0.67413E+07
 
                          IN - OUT =   -7870.1    
 
               Percent Discrepancy =               -0.12
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period   7
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.31024E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    13538.    
                  DELAY IB STORAGE =    2436.4    
 
                          Total IN =   0.67358E+07
 
             OUT:
             ----
                           STORAGE =    511.61    
                     CONSTANT HEAD =    66784.    
                             WELLS =   0.34710E+07
                                ET =   0.32001E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    2.4544    
                  DELAY IB STORAGE =    6.0818    
 
                         Total OUT =   0.67384E+07
 
                          IN - OUT =   -2640.9    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period   7
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.30986E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    7447.6    
                  DELAY IB STORAGE =    1984.0    
 
                          Total IN =   0.67255E+07
 
             OUT:
             ----
                           STORAGE =    502.57    
                     CONSTANT HEAD =    66784.    
                             WELLS =   0.34710E+07
                                ET =   0.31903E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.1796    
                  DELAY IB STORAGE =    2.3123    
 
                         Total OUT =   0.67287E+07
 
                          IN - OUT =   -3153.1    
 
               Percent Discrepancy =               -0.05
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period   7
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.30652E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    6112.0    
                  DELAY IB STORAGE =    1449.5    
 
                          Total IN =   0.66902E+07
 
             OUT:
             ----
                           STORAGE =    498.45    
                     CONSTANT HEAD =    66784.    
                             WELLS =   0.34710E+07
                                ET =   0.31572E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.1067    
                  DELAY IB STORAGE =   0.24213    
 
                         Total OUT =   0.66955E+07
 
                          IN - OUT =   -5288.6    
 
               Percent Discrepancy =               -0.08
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period   7
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.29650E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    5544.4    
                  DELAY IB STORAGE =    1185.6    
 
                          Total IN =   0.65892E+07
 
             OUT:
             ----
                           STORAGE =    492.89    
                     CONSTANT HEAD =    66786.    
                             WELLS =   0.34710E+07
                                ET =   0.30517E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.1031    
                  DELAY IB STORAGE =   0.21642    
 
                         Total OUT =   0.65900E+07
 
                          IN - OUT =   -855.13    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   8
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.37008E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    70056.    
                  DELAY IB STORAGE =    1993.0    
 
                          Total IN =   0.73903E+07
 
             OUT:
             ----
                           STORAGE =    503.92    
                     CONSTANT HEAD =    66786.    
                             WELLS =   0.42809E+07
                                ET =   0.30515E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    6.6803    
                  DELAY IB STORAGE =    13.448    
 
                         Total OUT =   0.73996E+07
 
                          IN - OUT =   -9288.2    
 
               Percent Discrepancy =               -0.13
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period   8
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.37346E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    34550.    
                  DELAY IB STORAGE =    2569.2    
 
                          Total IN =   0.73892E+07
 
             OUT:
             ----
                           STORAGE =    498.88    
                     CONSTANT HEAD =    66786.    
                             WELLS =   0.42809E+07
                                ET =   0.30506E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    3.2483    
                  DELAY IB STORAGE =    11.390    
 
                         Total OUT =   0.73987E+07
 
                          IN - OUT =   -9471.9    
 
               Percent Discrepancy =               -0.13
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period   8
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.37575E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    14717.    
                  DELAY IB STORAGE =    2710.7    
 
                          Total IN =   0.73924E+07
 
             OUT:
             ----
                           STORAGE =    495.88    
                     CONSTANT HEAD =    66786.    
                             WELLS =   0.42809E+07
                                ET =   0.30474E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.4975    
                  DELAY IB STORAGE =    7.3077    
 
                         Total OUT =   0.73955E+07
 
                          IN - OUT =   -3141.2    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period   8
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.37523E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    8636.8    
                  DELAY IB STORAGE =    2243.3    
 
                          Total IN =   0.73806E+07
 
             OUT:
             ----
                           STORAGE =    492.78    
                     CONSTANT HEAD =    66786.    
                             WELLS =   0.42809E+07
                                ET =   0.30362E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.1173    
                  DELAY IB STORAGE =    2.6747    
 
                         Total OUT =   0.73843E+07
 
                          IN - OUT =   -3737.3    
 
               Percent Discrepancy =               -0.05
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period   8
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.37141E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    7291.8    
                  DELAY IB STORAGE =    1698.6    
 
                          Total IN =   0.73406E+07
 
             OUT:
             ----
                           STORAGE =    490.23    
                     CONSTANT HEAD =    66786.    
                             WELLS =   0.42809E+07
                                ET =   0.29988E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.0876    
                  DELAY IB STORAGE =   0.23794    
 
                         Total OUT =   0.73469E+07
 
                          IN - OUT =   -6282.9    
 
               Percent Discrepancy =               -0.09
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period   8
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.36020E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    6686.5    
                  DELAY IB STORAGE =    1426.3    
 
                          Total IN =   0.72276E+07
 
             OUT:
             ----
                           STORAGE =    484.09    
                     CONSTANT HEAD =    66788.    
                             WELLS =   0.42809E+07
                                ET =   0.28805E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.0840    
                  DELAY IB STORAGE =   0.21282    
 
                         Total OUT =   0.72286E+07
 
                          IN - OUT =   -999.89    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period   9
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.41006E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    52281.    
                  DELAY IB STORAGE =    2099.5    
 
                          Total IN =   0.77724E+07
 
             OUT:
             ----
                           STORAGE =    492.98    
                     CONSTANT HEAD =    66788.    
                             WELLS =   0.48591E+07
                                ET =   0.28802E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7.0175    
                  DELAY IB STORAGE =    14.909    
 
                         Total OUT =   0.78066E+07
 
                          IN - OUT =   -34172.    
 
               Percent Discrepancy =               -0.44
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period   9
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.41479E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    27398.    
                  DELAY IB STORAGE =    2501.0    
 
                          Total IN =   0.77953E+07
 
             OUT:
             ----
                           STORAGE =    490.07    
                     CONSTANT HEAD =    66788.    
                             WELLS =   0.48591E+07
                                ET =   0.28793E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    3.3087    
                  DELAY IB STORAGE =    12.603    
 
                         Total OUT =   0.78057E+07
 
                          IN - OUT =   -10393.    
 
               Percent Discrepancy =               -0.13
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period   9
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.41585E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    13185.    
                  DELAY IB STORAGE =    2569.8    
 
                          Total IN =   0.77918E+07
 
             OUT:
             ----
                           STORAGE =    485.94    
                     CONSTANT HEAD =    66788.    
                             WELLS =   0.48591E+07
                                ET =   0.28760E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.4241    
                  DELAY IB STORAGE =    8.0857    
 
                         Total OUT =   0.78024E+07
 
                          IN - OUT =   -10632.    
 
               Percent Discrepancy =               -0.14
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period   9
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.41586E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    8866.2    
                  DELAY IB STORAGE =    2194.4    
 
                          Total IN =   0.77871E+07
 
             OUT:
             ----
                           STORAGE =    483.83    
                     CONSTANT HEAD =    66788.    
                             WELLS =   0.48591E+07
                                ET =   0.28648E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.0983    
                  DELAY IB STORAGE =    2.9620    
 
                         Total OUT =   0.77911E+07
 
                          IN - OUT =   -3992.9    
 
               Percent Discrepancy =               -0.05
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period   9
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.41192E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    7864.1    
                  DELAY IB STORAGE =    1774.3    
 
                          Total IN =   0.77463E+07
 
             OUT:
             ----
                           STORAGE =    480.95    
                     CONSTANT HEAD =    66788.    
                             WELLS =   0.48591E+07
                                ET =   0.28266E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.0680    
                  DELAY IB STORAGE =   0.23657    
 
                         Total OUT =   0.77530E+07
 
                          IN - OUT =   -6716.8    
 
               Percent Discrepancy =               -0.09
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period   9
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.40088E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    7356.1    
                  DELAY IB STORAGE =    1559.4    
 
                          Total IN =   0.76352E+07
 
             OUT:
             ----
                           STORAGE =    473.49    
                     CONSTANT HEAD =    66790.    
                             WELLS =   0.48591E+07
                                ET =   0.27099E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.0616    
                  DELAY IB STORAGE =   0.20861    
 
                         Total OUT =   0.76363E+07
 
                          IN - OUT =   -1118.8    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  10
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.50618E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    98696.    
                  DELAY IB STORAGE =    2606.6    
 
                          Total IN =   0.87806E+07
 
             OUT:
             ----
                           STORAGE =    484.23    
                     CONSTANT HEAD =    66790.    
                             WELLS =   0.60164E+07
                                ET =   0.27096E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    6.6113    
                  DELAY IB STORAGE =    14.472    
 
                         Total OUT =   0.87933E+07
 
                          IN - OUT =   -12720.    
 
               Percent Discrepancy =               -0.14
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  10
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.51188E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    48525.    
                  DELAY IB STORAGE =    3440.4    
 
                          Total IN =   0.87883E+07
 
             OUT:
             ----
                           STORAGE =    479.13    
                     CONSTANT HEAD =    66790.    
                             WELLS =   0.60164E+07
                                ET =   0.27086E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    2.8931    
                  DELAY IB STORAGE =    12.183    
 
                         Total OUT =   0.87923E+07
 
                          IN - OUT =   -4044.8    
 
               Percent Discrepancy =               -0.05
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  10
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.51430E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    20337.    
                  DELAY IB STORAGE =    3674.0    
 
                          Total IN =   0.87845E+07
 
             OUT:
             ----
                           STORAGE =    475.28    
                     CONSTANT HEAD =    66790.    
                             WELLS =   0.60164E+07
                                ET =   0.27052E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.2892    
                  DELAY IB STORAGE =    7.7634    
 
                         Total OUT =   0.87888E+07
 
                          IN - OUT =   -4306.6    
 
               Percent Discrepancy =               -0.05
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  10
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.51392E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    11774.    
                  DELAY IB STORAGE =    3050.0    
 
                          Total IN =   0.87715E+07
 
             OUT:
             ----
                           STORAGE =    473.03    
                     CONSTANT HEAD =    66790.    
                             WELLS =   0.60164E+07
                                ET =   0.26930E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.0742    
                  DELAY IB STORAGE =    2.7102    
 
                         Total OUT =   0.87766E+07
 
                          IN - OUT =   -5110.1    
 
               Percent Discrepancy =               -0.06
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  10
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.50984E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    9914.1    
                  DELAY IB STORAGE =    2312.4    
 
                          Total IN =   0.87281E+07
 
             OUT:
             ----
                           STORAGE =    469.75    
                     CONSTANT HEAD =    66791.    
                             WELLS =   0.60164E+07
                                ET =   0.26530E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.0447    
                  DELAY IB STORAGE =   0.22854    
 
                         Total OUT =   0.87366E+07
 
                          IN - OUT =   -8541.1    
 
               Percent Discrepancy =               -0.10
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  10
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.49838E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    9178.2    
                  DELAY IB STORAGE =    1957.5    
 
                          Total IN =   0.86124E+07
 
             OUT:
             ----
                           STORAGE =    460.72    
                     CONSTANT HEAD =    66792.    
                             WELLS =   0.60164E+07
                                ET =   0.25302E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.0350    
                  DELAY IB STORAGE =   0.20350    
 
                         Total OUT =   0.86138E+07
 
                          IN - OUT =   -1403.6    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  11
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.64596E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13715E+06
                  DELAY IB STORAGE =    3312.1    
 
                          Total IN =   0.10218E+08
 
             OUT:
             ----
                           STORAGE =    475.72    
                     CONSTANT HEAD =    66792.    
                             WELLS =   0.76366E+07
                                ET =   0.25299E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    8.6285    
                  DELAY IB STORAGE =    19.176    
 
                         Total OUT =   0.10234E+08
 
                          IN - OUT =   -16277.    
 
               Percent Discrepancy =               -0.16
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  11
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.65387E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    66917.    
                  DELAY IB STORAGE =    4495.3    
 
                          Total IN =   0.10228E+08
 
             OUT:
             ----
                           STORAGE =    468.54    
                     CONSTANT HEAD =    66792.    
                             WELLS =   0.76366E+07
                                ET =   0.25289E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    3.6113    
                  DELAY IB STORAGE =    16.215    
 
                         Total OUT =   0.10233E+08
 
                          IN - OUT =   -5198.9    
 
               Percent Discrepancy =               -0.05
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  11
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.65740E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    27400.    
                  DELAY IB STORAGE =    4856.1    
 
                          Total IN =   0.10224E+08
 
             OUT:
             ----
                           STORAGE =    463.21    
                     CONSTANT HEAD =    66792.    
                             WELLS =   0.76366E+07
                                ET =   0.25254E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.3418    
                  DELAY IB STORAGE =    10.423    
 
                         Total OUT =   0.10229E+08
 
                          IN - OUT =   -5547.7    
 
               Percent Discrepancy =               -0.05
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  11
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.65732E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    15383.    
                  DELAY IB STORAGE =    4019.0    
 
                          Total IN =   0.10210E+08
 
             OUT:
             ----
                           STORAGE =    460.15    
                     CONSTANT HEAD =    66792.    
                             WELLS =   0.76366E+07
                                ET =   0.25128E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.0471    
                  DELAY IB STORAGE =    3.5738    
 
                         Total OUT =   0.10217E+08
 
                          IN - OUT =   -6589.8    
 
               Percent Discrepancy =               -0.06
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  11
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.65338E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    12817.    
                  DELAY IB STORAGE =    3008.7    
 
                          Total IN =   0.10167E+08
 
             OUT:
             ----
                           STORAGE =    457.48    
                     CONSTANT HEAD =    66793.    
                             WELLS =   0.76366E+07
                                ET =   0.24672E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.0254    
                  DELAY IB STORAGE =   0.22288    
 
                         Total OUT =   0.10171E+08
 
                          IN - OUT =   -3926.5    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  11
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.64009E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    0.0000    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    11813.    
                  DELAY IB STORAGE =    2528.5    
 
                          Total IN =   0.10033E+08
 
             OUT:
             ----
                           STORAGE =    448.30    
                     CONSTANT HEAD =    66794.    
                             WELLS =   0.76366E+07
                                ET =   0.23307E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.0060    
                  DELAY IB STORAGE =   0.19848    
 
                         Total OUT =   0.10035E+08
 
                          IN - OUT =   -1795.4    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  12
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.82320E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    66388.    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.17602E+06
                  DELAY IB STORAGE =    4188.1    
 
                          Total IN =   0.12096E+08
 
             OUT:
             ----
                           STORAGE =    469.17    
                     CONSTANT HEAD =    66794.    
                             WELLS =   0.97191E+07
                                ET =   0.23304E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    11.525    
                  DELAY IB STORAGE =    19.739    
 
                         Total OUT =   0.12117E+08
 
                          IN - OUT =   -20749.    
 
               Percent Discrepancy =               -0.17
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  12
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.83337E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    66388.    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    85817.    
                  DELAY IB STORAGE =    5715.7    
 
                          Total IN =   0.12109E+08
 
             OUT:
             ----
                           STORAGE =    458.88    
                     CONSTANT HEAD =    66794.    
                             WELLS =   0.97191E+07
                                ET =   0.23293E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    4.6280    
                  DELAY IB STORAGE =    16.603    
 
                         Total OUT =   0.12116E+08
 
                          IN - OUT =   -6630.1    
 
               Percent Discrepancy =               -0.05
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  12
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.83796E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    66388.    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    35076.    
                  DELAY IB STORAGE =    6193.8    
 
                          Total IN =   0.12105E+08
 
             OUT:
             ----
                           STORAGE =    451.56    
                     CONSTANT HEAD =    66794.    
                             WELLS =   0.97191E+07
                                ET =   0.23255E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.4104    
                  DELAY IB STORAGE =    10.463    
 
                         Total OUT =   0.12112E+08
 
                          IN - OUT =   -7076.9    
 
               Percent Discrepancy =               -0.06
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  12
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.83870E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    66388.    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    19694.    
                  DELAY IB STORAGE =    5133.4    
 
                          Total IN =   0.12096E+08
 
             OUT:
             ----
                           STORAGE =    448.06    
                     CONSTANT HEAD =    66794.    
                             WELLS =   0.97191E+07
                                ET =   0.23120E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.0239    
                  DELAY IB STORAGE =    3.3842    
 
                         Total OUT =   0.12098E+08
 
                          IN - OUT =   -2682.4    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  12
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.83417E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    66388.    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    16374.    
                  DELAY IB STORAGE =    3850.4    
 
                          Total IN =   0.12046E+08
 
             OUT:
             ----
                           STORAGE =    444.98    
                     CONSTANT HEAD =    66795.    
                             WELLS =   0.97191E+07
                                ET =   0.22645E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.99637    
                  DELAY IB STORAGE =   0.21680    
 
                         Total OUT =   0.12051E+08
 
                          IN - OUT =   -5015.1    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  12
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.81858E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =    66388.    
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    15124.    
                  DELAY IB STORAGE =    3241.2    
 
                          Total IN =   0.11888E+08
 
             OUT:
             ----
                           STORAGE =    434.90    
                     CONSTANT HEAD =    66796.    
                             WELLS =   0.97191E+07
                                ET =   0.21026E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.97799    
                  DELAY IB STORAGE =   0.19231    
 
                         Total OUT =   0.11889E+08
 
                          IN - OUT =   -879.71    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  13
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.99372E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.20829E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.17866E+06
                  DELAY IB STORAGE =    4926.8    
 
                          Total IN =   0.13947E+08
 
             OUT:
             ----
                           STORAGE =    447.30    
                     CONSTANT HEAD =    66796.    
                             WELLS =   0.11802E+08
                                ET =   0.21022E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7.7582    
                  DELAY IB STORAGE =    21.227    
 
                         Total OUT =   0.13971E+08
 
                          IN - OUT =   -24909.    
 
               Percent Discrepancy =               -0.18
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  13
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.10042E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.20829E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    88486.    
                  DELAY IB STORAGE =    6433.7    
 
                          Total IN =   0.13962E+08
 
             OUT:
             ----
                           STORAGE =    437.88    
                     CONSTANT HEAD =    66796.    
                             WELLS =   0.11802E+08
                                ET =   0.21010E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    2.1713    
                  DELAY IB STORAGE =    17.657    
 
                         Total OUT =   0.13970E+08
 
                          IN - OUT =   -7888.9    
 
               Percent Discrepancy =               -0.06
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  13
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.10087E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.20829E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    38022.    
                  DELAY IB STORAGE =    6883.7    
 
                          Total IN =   0.13957E+08
 
             OUT:
             ----
                           STORAGE =    434.68    
                     CONSTANT HEAD =    66796.    
                             WELLS =   0.11802E+08
                                ET =   0.20967E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.0106    
                  DELAY IB STORAGE =    10.910    
 
                         Total OUT =   0.13966E+08
 
                          IN - OUT =   -8383.2    
 
               Percent Discrepancy =               -0.06
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  13
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.10093E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.20829E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    22776.    
                  DELAY IB STORAGE =    5800.3    
 
                          Total IN =   0.13948E+08
 
             OUT:
             ----
                           STORAGE =    434.03    
                     CONSTANT HEAD =    66797.    
                             WELLS =   0.11802E+08
                                ET =   0.20815E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.98509    
                  DELAY IB STORAGE =    3.3633    
 
                         Total OUT =   0.13951E+08
 
                          IN - OUT =   -3157.4    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  13
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.10045E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.20829E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    19454.    
                  DELAY IB STORAGE =    4503.0    
 
                          Total IN =   0.13895E+08
 
             OUT:
             ----
                           STORAGE =    430.49    
                     CONSTANT HEAD =    66797.    
                             WELLS =   0.11802E+08
                                ET =   0.20313E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.96273    
                  DELAY IB STORAGE =   0.20982    
 
                         Total OUT =   0.13900E+08
 
                          IN - OUT =   -5929.2    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  13
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.98963E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.20829E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    18204.    
                  DELAY IB STORAGE =    3891.9    
 
                          Total IN =   0.13744E+08
 
             OUT:
             ----
                           STORAGE =    419.39    
                     CONSTANT HEAD =    66798.    
                             WELLS =   0.11802E+08
                                ET =   0.18761E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.94217    
                  DELAY IB STORAGE =   0.18519    
 
                         Total OUT =   0.13745E+08
 
                          IN - OUT =   -1072.1    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  14
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12589E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.38185E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.26353E+06
                  DELAY IB STORAGE =    6207.3    
 
                          Total IN =   0.16859E+08
 
             OUT:
             ----
                           STORAGE =    435.32    
                     CONSTANT HEAD =    66798.    
                             WELLS =   0.14925E+08
                                ET =   0.18757E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    9.1759    
                  DELAY IB STORAGE =    21.594    
 
                         Total OUT =   0.16868E+08
 
                          IN - OUT =   -9666.9    
 
               Percent Discrepancy =               -0.06
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  14
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12728E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.38185E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12772E+06
                  DELAY IB STORAGE =    8496.5    
 
                          Total IN =   0.16864E+08
 
             OUT:
             ----
                           STORAGE =    423.11    
                     CONSTANT HEAD =    66798.    
                             WELLS =   0.14925E+08
                                ET =   0.18746E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    2.3119    
                  DELAY IB STORAGE =    17.903    
 
                         Total OUT =   0.16867E+08
 
                          IN - OUT =   -3051.8    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  14
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12798E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.38185E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    52458.    
                  DELAY IB STORAGE =    9237.5    
 
                          Total IN =   0.16860E+08
 
             OUT:
             ----
                           STORAGE =    419.36    
                     CONSTANT HEAD =    66799.    
                             WELLS =   0.14925E+08
                                ET =   0.18704E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.97613    
                  DELAY IB STORAGE =    10.886    
 
                         Total OUT =   0.16863E+08
 
                          IN - OUT =   -3294.5    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  14
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12807E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.38185E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    29767.    
                  DELAY IB STORAGE =    7779.4    
 
                          Total IN =   0.16844E+08
 
             OUT:
             ----
                           STORAGE =    418.38    
                     CONSTANT HEAD =    66799.    
                             WELLS =   0.14925E+08
                                ET =   0.18557E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.94817    
                  DELAY IB STORAGE =    2.9586    
 
                         Total OUT =   0.16848E+08
 
                          IN - OUT =   -4096.6    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  14
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12762E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.38185E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    24944.    
                  DELAY IB STORAGE =    6029.3    
 
                          Total IN =   0.16793E+08
 
             OUT:
             ----
                           STORAGE =    414.83    
                     CONSTANT HEAD =    66799.    
                             WELLS =   0.14925E+08
                                ET =   0.18031E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.93041    
                  DELAY IB STORAGE =   0.20178    
 
                         Total OUT =   0.16795E+08
 
                          IN - OUT =   -2832.4    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  14
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12594E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.38185E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    23195.    
                  DELAY IB STORAGE =    5238.4    
 
                          Total IN =   0.16622E+08
 
             OUT:
             ----
                           STORAGE =    401.38    
                     CONSTANT HEAD =    66801.    
                             WELLS =   0.14925E+08
                                ET =   0.16308E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.89991    
                  DELAY IB STORAGE =   0.17677    
 
                         Total OUT =   0.16623E+08
 
                          IN - OUT =   -968.80    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  15
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.15937E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55542E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.32062E+06
                  DELAY IB STORAGE =    7976.2    
 
                          Total IN =   0.20439E+08
 
             OUT:
             ----
                           STORAGE =    408.64    
                     CONSTANT HEAD =    66801.    
                             WELLS =   0.18745E+08
                                ET =   0.16305E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    5.0272    
                  DELAY IB STORAGE =    26.590    
 
                         Total OUT =   0.20442E+08
 
                          IN - OUT =   -3690.8    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  15
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16103E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55542E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15340E+06
                  DELAY IB STORAGE =    10756.    
 
                          Total IN =   0.20440E+08
 
             OUT:
             ----
                           STORAGE =    401.86    
                     CONSTANT HEAD =    66801.    
                             WELLS =   0.18745E+08
                                ET =   0.16292E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.1355    
                  DELAY IB STORAGE =    21.977    
 
                         Total OUT =   0.20441E+08
 
                          IN - OUT =   -949.47    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  15
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16187E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55542E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    63461.    
                  DELAY IB STORAGE =    11798.    
 
                          Total IN =   0.20435E+08
 
             OUT:
             ----
                           STORAGE =    401.23    
                     CONSTANT HEAD =    66801.    
                             WELLS =   0.18745E+08
                                ET =   0.16248E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.92387    
                  DELAY IB STORAGE =    13.335    
 
                         Total OUT =   0.20437E+08
 
                          IN - OUT =   -1399.1    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  15
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16199E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55542E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    36974.    
                  DELAY IB STORAGE =    10325.    
 
                          Total IN =   0.20419E+08
 
             OUT:
             ----
                           STORAGE =    400.10    
                     CONSTANT HEAD =    66801.    
                             WELLS =   0.18745E+08
                                ET =   0.16096E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.90500    
                  DELAY IB STORAGE =    3.4778    
 
                         Total OUT =   0.20421E+08
 
                          IN - OUT =   -1890.8    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  15
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16152E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55542E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    31433.    
                  DELAY IB STORAGE =    8717.1    
 
                          Total IN =   0.20365E+08
 
             OUT:
             ----
                           STORAGE =    395.95    
                     CONSTANT HEAD =    66801.    
                             WELLS =   0.18745E+08
                                ET =   0.15544E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.88761    
                  DELAY IB STORAGE =   0.19241    
 
                         Total OUT =   0.20366E+08
 
                          IN - OUT =   -1082.3    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  15
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.15975E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55542E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    33308.    
                  DELAY IB STORAGE =    8759.5    
 
                          Total IN =   0.20189E+08
 
             OUT:
             ----
                           STORAGE =    382.29    
                     CONSTANT HEAD =    66803.    
                             WELLS =   0.18745E+08
                                ET =   0.13789E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.85248    
                  DELAY IB STORAGE =   0.16737    
 
                         Total OUT =   0.20191E+08
 
                          IN - OUT =   -1227.6    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  16
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16779E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.79836E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13808E+06
                  DELAY IB STORAGE =    9906.1    
 
                          Total IN =   0.21343E+08
 
             OUT:
             ----
                           STORAGE =    392.66    
                     CONSTANT HEAD =    66803.    
                             WELLS =   0.19901E+08
                                ET =   0.13786E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    6.8422    
                  DELAY IB STORAGE =    31.635    
 
                         Total OUT =   0.21347E+08
 
                          IN - OUT =   -3919.7    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  16
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16829E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.79836E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    88675.    
                  DELAY IB STORAGE =    10729.    
 
                          Total IN =   0.21344E+08
 
             OUT:
             ----
                           STORAGE =    383.13    
                     CONSTANT HEAD =    66803.    
                             WELLS =   0.19901E+08
                                ET =   0.13774E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.2843    
                  DELAY IB STORAGE =    26.117    
 
                         Total OUT =   0.21345E+08
 
                          IN - OUT =   -1272.0    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  16
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16853E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.79836E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    61221.    
                  DELAY IB STORAGE =    11071.    
 
                          Total IN =   0.21341E+08
 
             OUT:
             ----
                           STORAGE =    382.16    
                     CONSTANT HEAD =    66803.    
                             WELLS =   0.19901E+08
                                ET =   0.13734E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.87632    
                  DELAY IB STORAGE =    15.917    
 
                         Total OUT =   0.21341E+08
 
                          IN - OUT =   -456.11    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  16
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16849E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.79836E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    52364.    
                  DELAY IB STORAGE =    10843.    
 
                          Total IN =   0.21328E+08
 
             OUT:
             ----
                           STORAGE =    381.11    
                     CONSTANT HEAD =    66803.    
                             WELLS =   0.19901E+08
                                ET =   0.13598E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.85956    
                  DELAY IB STORAGE =    4.3285    
 
                         Total OUT =   0.21328E+08
 
                          IN - OUT =   -228.76    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  16
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16802E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.79836E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    53049.    
                  DELAY IB STORAGE =    11061.    
 
                          Total IN =   0.21282E+08
 
             OUT:
             ----
                           STORAGE =    377.05    
                     CONSTANT HEAD =    66803.    
                             WELLS =   0.19901E+08
                                ET =   0.13149E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.83997    
                  DELAY IB STORAGE =   0.18203    
 
                         Total OUT =   0.21283E+08
 
                          IN - OUT =   -1064.2    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  16
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16656E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.79836E+06
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    57428.    
                  DELAY IB STORAGE =    13711.    
 
                          Total IN =   0.21142E+08
 
             OUT:
             ----
                           STORAGE =    362.01    
                     CONSTANT HEAD =    66805.    
                             WELLS =   0.19901E+08
                                ET =   0.11758E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.80238    
                  DELAY IB STORAGE =   0.15714    
 
                         Total OUT =   0.21144E+08
 
                          IN - OUT =   -1277.4    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  17
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.14462E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10414E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    28919.    
                  DELAY IB STORAGE =    12835.    
 
                          Total IN =   0.19162E+08
 
             OUT:
             ----
                           STORAGE =   0.38413E+06
                     CONSTANT HEAD =    66805.    
                             WELLS =   0.17355E+08
                                ET =   0.11755E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.18458E+06
                  DELAY IB STORAGE =    208.51    
 
                         Total OUT =   0.19166E+08
 
                          IN - OUT =   -3480.6    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  17
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.14190E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10414E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    27017.    
                  DELAY IB STORAGE =    11426.    
 
                          Total IN =   0.18887E+08
 
             OUT:
             ----
                           STORAGE =   0.21659E+06
                     CONSTANT HEAD =    66805.    
                             WELLS =   0.17355E+08
                                ET =   0.11747E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    74843.    
                  DELAY IB STORAGE =    866.69    
 
                         Total OUT =   0.18888E+08
 
                          IN - OUT =   -1064.1    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  17
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.14024E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10414E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    28803.    
                  DELAY IB STORAGE =    10650.    
 
                          Total IN =   0.18722E+08
 
             OUT:
             ----
                           STORAGE =   0.11204E+06
                     CONSTANT HEAD =    66805.    
                             WELLS =   0.17355E+08
                                ET =   0.11720E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    16523.    
                  DELAY IB STORAGE =    1289.0    
 
                         Total OUT =   0.18723E+08
 
                          IN - OUT =   -1146.3    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  17
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13925E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10414E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    34685.    
                  DELAY IB STORAGE =    10475.    
 
                          Total IN =   0.18629E+08
 
             OUT:
             ----
                           STORAGE =    43369.    
                     CONSTANT HEAD =    66805.    
                             WELLS =   0.17355E+08
                                ET =   0.11628E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    2435.9    
                  DELAY IB STORAGE =    746.26    
 
                         Total OUT =   0.18631E+08
 
                          IN - OUT =   -1316.6    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  17
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13848E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10414E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    43323.    
                  DELAY IB STORAGE =    11181.    
 
                          Total IN =   0.18562E+08
 
             OUT:
             ----
                           STORAGE =    8290.1    
                     CONSTANT HEAD =    66805.    
                             WELLS =   0.17355E+08
                                ET =   0.11343E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    158.59    
                  DELAY IB STORAGE =    147.06    
 
                         Total OUT =   0.18564E+08
 
                          IN - OUT =   -2434.6    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  17
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13728E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10414E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    60233.    
                  DELAY IB STORAGE =    14927.    
 
                          Total IN =   0.18462E+08
 
             OUT:
             ----
                           STORAGE =    339.09    
                     CONSTANT HEAD =    66806.    
                             WELLS =   0.17355E+08
                                ET =   0.10417E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.74665    
                  DELAY IB STORAGE =   0.14584    
 
                         Total OUT =   0.18463E+08
 
                          IN - OUT =   -1490.8    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  18
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.11150E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12844E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    21656.    
                  DELAY IB STORAGE =    13426.    
 
                          Total IN =   0.16087E+08
 
             OUT:
             ----
                           STORAGE =   0.16938E+07
                     CONSTANT HEAD =    66806.    
                             WELLS =   0.12959E+08
                                ET =   0.10415E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.32820E+06
                  DELAY IB STORAGE =    680.77    
 
                         Total OUT =   0.16090E+08
 
                          IN - OUT =   -2543.0    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  18
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.10800E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12844E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    20204.    
                  DELAY IB STORAGE =    11544.    
 
                          Total IN =   0.15734E+08
 
             OUT:
             ----
                           STORAGE =   0.15284E+07
                     CONSTANT HEAD =    66806.    
                             WELLS =   0.12959E+08
                                ET =   0.10410E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.13912E+06
                  DELAY IB STORAGE =    2373.5    
 
                         Total OUT =   0.15736E+08
 
                          IN - OUT =   -2379.3    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  18
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.10485E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12844E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    19670.    
                  DELAY IB STORAGE =    10418.    
 
                          Total IN =   0.15417E+08
 
             OUT:
             ----
                           STORAGE =   0.13138E+07
                     CONSTANT HEAD =    66806.    
                             WELLS =   0.12959E+08
                                ET =   0.10394E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    36100.    
                  DELAY IB STORAGE =    3285.9    
 
                         Total OUT =   0.15418E+08
 
                          IN - OUT =   -617.53    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  18
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.10068E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12844E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    20233.    
                  DELAY IB STORAGE =    9790.2    
 
                          Total IN =   0.15000E+08
 
             OUT:
             ----
                           STORAGE =   0.93369E+06
                     CONSTANT HEAD =    66806.    
                             WELLS =   0.12959E+08
                                ET =   0.10340E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7310.7    
                  DELAY IB STORAGE =    2135.1    
 
                         Total OUT =   0.15002E+08
 
                          IN - OUT =   -2123.6    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  18
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.94577E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12844E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    20945.    
                  DELAY IB STORAGE =    9505.9    
 
                          Total IN =   0.14390E+08
 
             OUT:
             ----
                           STORAGE =   0.34989E+06
                     CONSTANT HEAD =    66807.    
                             WELLS =   0.12959E+08
                                ET =   0.10166E+07
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1366.2    
                  DELAY IB STORAGE =    578.81    
 
                         Total OUT =   0.14394E+08
 
                          IN - OUT =   -3722.7    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  18
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.90664E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12844E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    30513.    
                  DELAY IB STORAGE =    11546.    
 
                          Total IN =   0.14010E+08
 
             OUT:
             ----
                           STORAGE =    25950.    
                     CONSTANT HEAD =    66808.    
                             WELLS =   0.12959E+08
                                ET =   0.96124E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    55.063    
                  DELAY IB STORAGE =    28.262    
 
                         Total OUT =   0.14013E+08
 
                          IN - OUT =   -2369.8    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  19
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.83631E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.14578E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    27044.    
                  DELAY IB STORAGE =    11513.    
 
                          Total IN =   0.13477E+08
 
             OUT:
             ----
                           STORAGE =   0.46356E+06
                     CONSTANT HEAD =    66808.    
                             WELLS =   0.11917E+08
                                ET =   0.96113E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    75891.    
                  DELAY IB STORAGE =    163.70    
 
                         Total OUT =   0.13484E+08
 
                          IN - OUT =   -7412.5    
 
               Percent Discrepancy =               -0.05
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  19
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.82731E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.14578E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    26288.    
                  DELAY IB STORAGE =    11001.    
 
                          Total IN =   0.13386E+08
 
             OUT:
             ----
                           STORAGE =   0.41198E+06
                     CONSTANT HEAD =    66808.    
                             WELLS =   0.11917E+08
                                ET =   0.96076E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    30977.    
                  DELAY IB STORAGE =    513.72    
 
                         Total OUT =   0.13388E+08
 
                          IN - OUT =   -2165.7    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  19
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.81868E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.14578E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    26598.    
                  DELAY IB STORAGE =    10710.    
 
                          Total IN =   0.13299E+08
 
             OUT:
             ----
                           STORAGE =   0.35028E+06
                     CONSTANT HEAD =    66808.    
                             WELLS =   0.11917E+08
                                ET =   0.95952E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7354.8    
                  DELAY IB STORAGE =    712.15    
 
                         Total OUT =   0.13302E+08
 
                          IN - OUT =   -2080.9    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  19
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.80688E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.14578E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    27872.    
                  DELAY IB STORAGE =    10629.    
 
                          Total IN =   0.13183E+08
 
             OUT:
             ----
                           STORAGE =   0.24402E+06
                     CONSTANT HEAD =    66808.    
                             WELLS =   0.11917E+08
                                ET =   0.95534E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1387.1    
                  DELAY IB STORAGE =    441.84    
 
                         Total OUT =   0.13185E+08
 
                          IN - OUT =   -2182.0    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  19
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.78928E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.14578E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    32786.    
                  DELAY IB STORAGE =    11068.    
 
                          Total IN =   0.13012E+08
 
             OUT:
             ----
                           STORAGE =    90576.    
                     CONSTANT HEAD =    66808.    
                             WELLS =   0.11917E+08
                                ET =   0.94113E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    230.34    
                  DELAY IB STORAGE =    107.17    
 
                         Total OUT =   0.13016E+08
 
                          IN - OUT =   -3697.2    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  19
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.77603E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.14578E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    46936.    
                  DELAY IB STORAGE =    14059.    
 
                          Total IN =   0.12897E+08
 
             OUT:
             ----
                           STORAGE =    23203.    
                     CONSTANT HEAD =    66809.    
                             WELLS =   0.11917E+08
                                ET =   0.89179E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    40.546    
                  DELAY IB STORAGE =    8.0099    
 
                         Total OUT =   0.12899E+08
 
                          IN - OUT =   -2035.0    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  20
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.87809E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.18050E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    99581.    
                  DELAY IB STORAGE =    14867.    
 
                          Total IN =   0.14318E+08
 
             OUT:
             ----
                           STORAGE =    22473.    
                     CONSTANT HEAD =    66809.    
                             WELLS =   0.13346E+08
                                ET =   0.89168E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    39.818    
                  DELAY IB STORAGE =    20.013    
 
                         Total OUT =   0.14327E+08
 
                          IN - OUT =   -8829.3    
 
               Percent Discrepancy =               -0.06
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  20
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.88090E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.18050E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    76009.    
                  DELAY IB STORAGE =    15323.    
 
                          Total IN =   0.14323E+08
 
             OUT:
             ----
                           STORAGE =    21622.    
                     CONSTANT HEAD =    66809.    
                             WELLS =   0.13346E+08
                                ET =   0.89132E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    36.344    
                  DELAY IB STORAGE =    17.568    
 
                         Total OUT =   0.14326E+08
 
                          IN - OUT =   -2661.8    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  20
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.88179E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.18050E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    64362.    
                  DELAY IB STORAGE =    15609.    
 
                          Total IN =   0.14320E+08
 
             OUT:
             ----
                           STORAGE =    20377.    
                     CONSTANT HEAD =    66809.    
                             WELLS =   0.13346E+08
                                ET =   0.89007E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    33.856    
                  DELAY IB STORAGE =    12.953    
 
                         Total OUT =   0.14323E+08
 
                          IN - OUT =   -2630.4    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  20
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.88162E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.18050E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    61246.    
                  DELAY IB STORAGE =    15811.    
 
                          Total IN =   0.14316E+08
 
             OUT:
             ----
                           STORAGE =    18246.    
                     CONSTANT HEAD =    66809.    
                             WELLS =   0.13346E+08
                                ET =   0.88585E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    29.791    
                  DELAY IB STORAGE =    7.4332    
 
                         Total OUT =   0.14317E+08
 
                          IN - OUT =   -875.85    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  20
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.87880E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.18050E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    68758.    
                  DELAY IB STORAGE =    16914.    
 
                          Total IN =   0.14296E+08
 
             OUT:
             ----
                           STORAGE =    13329.    
                     CONSTANT HEAD =    66810.    
                             WELLS =   0.13346E+08
                                ET =   0.87191E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    20.893    
                  DELAY IB STORAGE =    4.2203    
 
                         Total OUT =   0.14298E+08
 
                          IN - OUT =   -1552.9    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  20
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.87187E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.18050E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    80962.    
                  DELAY IB STORAGE =    21577.    
 
                          Total IN =   0.14244E+08
 
             OUT:
             ----
                           STORAGE =    7423.9    
                     CONSTANT HEAD =    66810.    
                             WELLS =   0.13346E+08
                                ET =   0.82586E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    11.549    
                  DELAY IB STORAGE =    2.1695    
 
                         Total OUT =   0.14246E+08
 
                          IN - OUT =   -2053.4    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  21
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.90195E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.22911E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15150E+06
                  DELAY IB STORAGE =    22518.    
 
                          Total IN =   0.15102E+08
 
             OUT:
             ----
                           STORAGE =    9524.2    
                     CONSTANT HEAD =    66810.    
                             WELLS =   0.14210E+08
                                ET =   0.82576E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    16.920    
                  DELAY IB STORAGE =    15.407    
 
                         Total OUT =   0.15113E+08
 
                          IN - OUT =   -10433.    
 
               Percent Discrepancy =               -0.07
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  21
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.90571E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.22911E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11920E+06
                  DELAY IB STORAGE =    23141.    
 
                          Total IN =   0.15108E+08
 
             OUT:
             ----
                           STORAGE =    8546.2    
                     CONSTANT HEAD =    66810.    
                             WELLS =   0.14210E+08
                                ET =   0.82542E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    12.883    
                  DELAY IB STORAGE =    12.601    
 
                         Total OUT =   0.15111E+08
 
                          IN - OUT =   -3164.5    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  21
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.90749E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.22911E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10095E+06
                  DELAY IB STORAGE =    23515.    
 
                          Total IN =   0.15108E+08
 
             OUT:
             ----
                           STORAGE =    7383.0    
                     CONSTANT HEAD =    66810.    
                             WELLS =   0.14210E+08
                                ET =   0.82424E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    11.025    
                  DELAY IB STORAGE =    7.4613    
 
                         Total OUT =   0.15109E+08
 
                          IN - OUT =   -936.87    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  21
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.90739E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.22911E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    96037.    
                  DELAY IB STORAGE =    23757.    
 
                          Total IN =   0.15102E+08
 
             OUT:
             ----
                           STORAGE =    5878.6    
                     CONSTANT HEAD =    66810.    
                             WELLS =   0.14210E+08
                                ET =   0.82017E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    8.9406    
                  DELAY IB STORAGE =    2.9347    
 
                         Total OUT =   0.15103E+08
 
                          IN - OUT =   -1044.9    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  21
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.90565E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.22911E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =    96225.    
                  DELAY IB STORAGE =    25136.    
 
                          Total IN =   0.15086E+08
 
             OUT:
             ----
                           STORAGE =    4866.2    
                     CONSTANT HEAD =    66811.    
                             WELLS =   0.14210E+08
                                ET =   0.80604E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7.4630    
                  DELAY IB STORAGE =    1.4510    
 
                         Total OUT =   0.15088E+08
 
                          IN - OUT =   -1719.7    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  21
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.89941E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.22911E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10396E+06
                  DELAY IB STORAGE =    30890.    
 
                          Total IN =   0.15038E+08
 
             OUT:
             ----
                           STORAGE =    3422.7    
                     CONSTANT HEAD =    66811.    
                             WELLS =   0.14210E+08
                                ET =   0.75896E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    5.2815    
                  DELAY IB STORAGE =   0.98928    
 
                         Total OUT =   0.15040E+08
 
                          IN - OUT =   -2096.5    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  22
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.89377E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.29159E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14830E+06
                  DELAY IB STORAGE =    31698.    
 
                          Total IN =   0.15651E+08
 
             OUT:
             ----
                           STORAGE =    9382.7    
                     CONSTANT HEAD =    66811.    
                             WELLS =   0.14828E+08
                                ET =   0.75887E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    16.506    
                  DELAY IB STORAGE =    13.526    
 
                         Total OUT =   0.15663E+08
 
                          IN - OUT =   -12229.    
 
               Percent Discrepancy =               -0.08
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  22
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.89672E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.29159E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12572E+06
                  DELAY IB STORAGE =    32154.    
 
                          Total IN =   0.15658E+08
 
             OUT:
             ----
                           STORAGE =    8650.9    
                     CONSTANT HEAD =    66811.    
                             WELLS =   0.14828E+08
                                ET =   0.75854E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    12.557    
                  DELAY IB STORAGE =    10.871    
 
                         Total OUT =   0.15662E+08
 
                          IN - OUT =   -3780.6    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  22
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.89804E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.29159E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11282E+06
                  DELAY IB STORAGE =    32478.    
 
                          Total IN =   0.15659E+08
 
             OUT:
             ----
                           STORAGE =    7716.3    
                     CONSTANT HEAD =    66811.    
                             WELLS =   0.14828E+08
                                ET =   0.75740E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    11.005    
                  DELAY IB STORAGE =    6.0627    
 
                         Total OUT =   0.15660E+08
 
                          IN - OUT =   -1135.3    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  22
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.89770E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.29159E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11036E+06
                  DELAY IB STORAGE =    32874.    
 
                          Total IN =   0.15654E+08
 
             OUT:
             ----
                           STORAGE =    6318.4    
                     CONSTANT HEAD =    66811.    
                             WELLS =   0.14828E+08
                                ET =   0.75347E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    9.0845    
                  DELAY IB STORAGE =    2.2509    
 
                         Total OUT =   0.15655E+08
 
                          IN - OUT =   -1202.2    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  22
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.89562E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.29159E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11318E+06
                  DELAY IB STORAGE =    34576.    
 
                          Total IN =   0.15637E+08
 
             OUT:
             ----
                           STORAGE =    3554.2    
                     CONSTANT HEAD =    66811.    
                             WELLS =   0.14828E+08
                                ET =   0.74057E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    5.3947    
                  DELAY IB STORAGE =    1.0266    
 
                         Total OUT =   0.15639E+08
 
                          IN - OUT =   -1787.1    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  22
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.88919E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.29159E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12493E+06
                  DELAY IB STORAGE =    41226.    
 
                          Total IN =   0.15591E+08
 
             OUT:
             ----
                           STORAGE =    2261.3    
                     CONSTANT HEAD =    66812.    
                             WELLS =   0.14828E+08
                                ET =   0.69622E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    3.5219    
                  DELAY IB STORAGE =   0.66247    
 
                         Total OUT =   0.15594E+08
 
                          IN - OUT =   -2064.4    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  23
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.91756E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.35408E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.20468E+06
                  DELAY IB STORAGE =    42246.    
 
                          Total IN =   0.16581E+08
 
             OUT:
             ----
                           STORAGE =    5072.4    
                     CONSTANT HEAD =    66812.    
                             WELLS =   0.15817E+08
                                ET =   0.69612E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    10.018    
                  DELAY IB STORAGE =    12.437    
 
                         Total OUT =   0.16585E+08
 
                          IN - OUT =   -4410.4    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  23
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.92131E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.35408E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.16798E+06
                  DELAY IB STORAGE =    43013.    
 
                          Total IN =   0.16582E+08
 
             OUT:
             ----
                           STORAGE =    3968.4    
                     CONSTANT HEAD =    66812.    
                             WELLS =   0.15817E+08
                                ET =   0.69580E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    5.8021    
                  DELAY IB STORAGE =    9.8317    
 
                         Total OUT =   0.16584E+08
 
                          IN - OUT =   -1364.9    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  23
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.92308E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.35408E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14725E+06
                  DELAY IB STORAGE =    43601.    
 
                          Total IN =   0.16580E+08
 
             OUT:
             ----
                           STORAGE =    2704.6    
                     CONSTANT HEAD =    66812.    
                             WELLS =   0.15817E+08
                                ET =   0.69468E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    3.8534    
                  DELAY IB STORAGE =    5.3175    
 
                         Total OUT =   0.16581E+08
 
                          IN - OUT =   -1394.4    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  23
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.92303E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.35408E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14208E+06
                  DELAY IB STORAGE =    44156.    
 
                          Total IN =   0.16575E+08
 
             OUT:
             ----
                           STORAGE =    1502.6    
                     CONSTANT HEAD =    66812.    
                             WELLS =   0.15817E+08
                                ET =   0.69079E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    2.2403    
                  DELAY IB STORAGE =    1.4438    
 
                         Total OUT =   0.16576E+08
 
                          IN - OUT =   -1461.3    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  23
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.92104E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.35408E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14506E+06
                  DELAY IB STORAGE =    46250.    
 
                          Total IN =   0.16560E+08
 
             OUT:
             ----
                           STORAGE =    747.41    
                     CONSTANT HEAD =    66812.    
                             WELLS =   0.15817E+08
                                ET =   0.67731E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.2479    
                  DELAY IB STORAGE =   0.26316    
 
                         Total OUT =   0.16562E+08
 
                          IN - OUT =   -2008.9    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  23
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.91460E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.35408E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15612E+06
                  DELAY IB STORAGE =    53776.    
 
                          Total IN =   0.16514E+08
 
             OUT:
             ----
                           STORAGE =    340.54    
                     CONSTANT HEAD =    66812.    
                             WELLS =   0.15817E+08
                                ET =   0.63195E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.62465    
                  DELAY IB STORAGE =   0.12603    
 
                         Total OUT =   0.16516E+08
 
                          IN - OUT =   -2112.9    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  24
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.86960E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.44779E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.18075E+06
                  DELAY IB STORAGE =    54511.    
 
                          Total IN =   0.17027E+08
 
             OUT:
             ----
                           STORAGE =    22421.    
                     CONSTANT HEAD =    66812.    
                             WELLS =   0.16311E+08
                                ET =   0.63188E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    33.192    
                  DELAY IB STORAGE =    11.715    
 
                         Total OUT =   0.17032E+08
 
                          IN - OUT =   -5086.4    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  24
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.87156E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.44779E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.16280E+06
                  DELAY IB STORAGE =    54881.    
 
                          Total IN =   0.17029E+08
 
             OUT:
             ----
                           STORAGE =    21229.    
                     CONSTANT HEAD =    66812.    
                             WELLS =   0.16311E+08
                                ET =   0.63162E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    28.458    
                  DELAY IB STORAGE =    9.2636    
 
                         Total OUT =   0.17030E+08
 
                          IN - OUT =   -1594.0    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  24
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.87220E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.44779E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15363E+06
                  DELAY IB STORAGE =    55182.    
 
                          Total IN =   0.17026E+08
 
             OUT:
             ----
                           STORAGE =    19682.    
                     CONSTANT HEAD =    66812.    
                             WELLS =   0.16311E+08
                                ET =   0.63073E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    26.116    
                  DELAY IB STORAGE =    5.1315    
 
                         Total OUT =   0.17028E+08
 
                          IN - OUT =   -1627.2    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  24
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.87179E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.44779E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15126E+06
                  DELAY IB STORAGE =    55597.    
 
                          Total IN =   0.17020E+08
 
             OUT:
             ----
                           STORAGE =    16658.    
                     CONSTANT HEAD =    66812.    
                             WELLS =   0.16311E+08
                                ET =   0.62765E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    22.080    
                  DELAY IB STORAGE =    3.1089    
 
                         Total OUT =   0.17022E+08
 
                          IN - OUT =   -1599.5    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  24
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.86971E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.44779E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15233E+06
                  DELAY IB STORAGE =    57284.    
 
                          Total IN =   0.17002E+08
 
             OUT:
             ----
                           STORAGE =    9262.3    
                     CONSTANT HEAD =    66812.    
                             WELLS =   0.16311E+08
                                ET =   0.61743E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    27.227    
                  DELAY IB STORAGE =    4.3196    
 
                         Total OUT =   0.17004E+08
 
                          IN - OUT =   -1989.4    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  24
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.86442E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.44779E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15818E+06
                  DELAY IB STORAGE =    63272.    
 
                          Total IN =   0.16961E+08
 
             OUT:
             ----
                           STORAGE =    1676.5    
                     CONSTANT HEAD =    66811.    
                             WELLS =   0.16311E+08
                                ET =   0.58394E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    6.5075    
                  DELAY IB STORAGE =    1.3873    
 
                         Total OUT =   0.16963E+08
 
                          IN - OUT =   -1985.4    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  25
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.83545E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.56238E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.20643E+06
                  DELAY IB STORAGE =    64207.    
 
                          Total IN =   0.17866E+08
 
             OUT:
             ----
                           STORAGE =    45204.    
                     CONSTANT HEAD =    66811.    
                             WELLS =   0.17176E+08
                                ET =   0.58388E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    392.58    
                  DELAY IB STORAGE =    14.152    
 
                         Total OUT =   0.17872E+08
 
                          IN - OUT =   -5629.4    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  25
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.83848E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.56238E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.17489E+06
                  DELAY IB STORAGE =    64858.    
 
                          Total IN =   0.17866E+08
 
             OUT:
             ----
                           STORAGE =    41036.    
                     CONSTANT HEAD =    66811.    
                             WELLS =   0.17176E+08
                                ET =   0.58368E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    317.12    
                  DELAY IB STORAGE =    17.870    
 
                         Total OUT =   0.17868E+08
 
                          IN - OUT =   -1788.6    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  25
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.83971E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.56238E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15704E+06
                  DELAY IB STORAGE =    65332.    
 
                          Total IN =   0.17861E+08
 
             OUT:
             ----
                           STORAGE =    36856.    
                     CONSTANT HEAD =    66811.    
                             WELLS =   0.17176E+08
                                ET =   0.58296E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    182.88    
                  DELAY IB STORAGE =    20.033    
 
                         Total OUT =   0.17863E+08
 
                          IN - OUT =   -1824.9    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  25
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.83939E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.56238E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15225E+06
                  DELAY IB STORAGE =    65666.    
 
                          Total IN =   0.17853E+08
 
             OUT:
             ----
                           STORAGE =    31774.    
                     CONSTANT HEAD =    66811.    
                             WELLS =   0.17176E+08
                                ET =   0.58045E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    69.906    
                  DELAY IB STORAGE =    14.331    
 
                         Total OUT =   0.17855E+08
 
                          IN - OUT =   -1767.8    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  25
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.83736E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.56238E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15230E+06
                  DELAY IB STORAGE =    66894.    
 
                          Total IN =   0.17834E+08
 
             OUT:
             ----
                           STORAGE =    22156.    
                     CONSTANT HEAD =    66811.    
                             WELLS =   0.17176E+08
                                ET =   0.57141E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    28.858    
                  DELAY IB STORAGE =    6.4850    
 
                         Total OUT =   0.17836E+08
 
                          IN - OUT =   -2094.7    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  25
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.83098E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.56238E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.16326E+06
                  DELAY IB STORAGE =    71899.    
 
                          Total IN =   0.17786E+08
 
             OUT:
             ----
                           STORAGE =    6576.5    
                     CONSTANT HEAD =    66810.    
                             WELLS =   0.17176E+08
                                ET =   0.53899E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    8.5457    
                  DELAY IB STORAGE =    1.7035    
 
                         Total OUT =   0.17788E+08
 
                          IN - OUT =   -1918.9    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  26
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.85228E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.59707E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.22270E+06
                  DELAY IB STORAGE =    72696.    
 
                          Total IN =   0.18406E+08
 
             OUT:
             ----
                           STORAGE =    12444.    
                     CONSTANT HEAD =    66810.    
                             WELLS =   0.17794E+08
                                ET =   0.53892E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    18.463    
                  DELAY IB STORAGE =    11.595    
 
                         Total OUT =   0.18413E+08
 
                          IN - OUT =   -6246.8    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  26
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.85474E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.59707E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.20054E+06
                  DELAY IB STORAGE =    73184.    
 
                          Total IN =   0.18409E+08
 
             OUT:
             ----
                           STORAGE =    11278.    
                     CONSTANT HEAD =    66810.    
                             WELLS =   0.17794E+08
                                ET =   0.53869E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    14.674    
                  DELAY IB STORAGE =    9.4706    
 
                         Total OUT =   0.18411E+08
 
                          IN - OUT =   -1990.9    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  26
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.85557E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.59707E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.18953E+06
                  DELAY IB STORAGE =    73596.    
 
                          Total IN =   0.18407E+08
 
             OUT:
             ----
                           STORAGE =    9875.0    
                     CONSTANT HEAD =    66810.    
                             WELLS =   0.17794E+08
                                ET =   0.53787E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    12.687    
                  DELAY IB STORAGE =    5.9964    
 
                         Total OUT =   0.18409E+08
 
                          IN - OUT =   -2026.7    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  26
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.85516E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.59707E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.18967E+06
                  DELAY IB STORAGE =    74109.    
 
                          Total IN =   0.18404E+08
 
             OUT:
             ----
                           STORAGE =    7838.6    
                     CONSTANT HEAD =    66810.    
                             WELLS =   0.17794E+08
                                ET =   0.53504E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    10.042    
                  DELAY IB STORAGE =    2.5239    
 
                         Total OUT =   0.18404E+08
 
                          IN - OUT =   -590.42    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  26
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.85276E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.59707E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.19740E+06
                  DELAY IB STORAGE =    76132.    
 
                          Total IN =   0.18389E+08
 
             OUT:
             ----
                           STORAGE =    4856.5    
                     CONSTANT HEAD =    66810.    
                             WELLS =   0.17794E+08
                                ET =   0.52542E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    6.1870    
                  DELAY IB STORAGE =    1.2377    
 
                         Total OUT =   0.18391E+08
 
                          IN - OUT =   -2201.5    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  26
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.84804E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.59707E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.20319E+06
                  DELAY IB STORAGE =    83135.    
 
                          Total IN =   0.18355E+08
 
             OUT:
             ----
                           STORAGE =    440.48    
                     CONSTANT HEAD =    66809.    
                             WELLS =   0.17794E+08
                                ET =   0.49512E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.63936    
                  DELAY IB STORAGE =   0.19576    
 
                         Total OUT =   0.18357E+08
 
                          IN - OUT =   -1950.2    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  27
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.99762E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52067E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.32965E+06
                  DELAY IB STORAGE =    84094.    
 
                          Total IN =   0.19214E+08
 
             OUT:
             ----
                           STORAGE =    97.639    
                     CONSTANT HEAD =    66809.    
                             WELLS =   0.18659E+08
                                ET =   0.49504E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    2.5825    
                  DELAY IB STORAGE =    10.229    
 
                         Total OUT =   0.19221E+08
 
                          IN - OUT =   -7258.8    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  27
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.10012E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52067E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.29758E+06
                  DELAY IB STORAGE =    84847.    
 
                          Total IN =   0.19219E+08
 
             OUT:
             ----
                           STORAGE =    93.545    
                     CONSTANT HEAD =    66809.    
                             WELLS =   0.18659E+08
                                ET =   0.49477E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.34489    
                  DELAY IB STORAGE =    8.0400    
 
                         Total OUT =   0.19221E+08
 
                          IN - OUT =   -2265.6    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  27
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.10030E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52067E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.27953E+06
                  DELAY IB STORAGE =    85628.    
 
                          Total IN =   0.19219E+08
 
             OUT:
             ----
                           STORAGE =    93.013    
                     CONSTANT HEAD =    66809.    
                             WELLS =   0.18659E+08
                                ET =   0.49383E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.22303    
                  DELAY IB STORAGE =    4.4209    
 
                         Total OUT =   0.19220E+08
 
                          IN - OUT =   -743.12    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  27
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.10032E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52067E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.27354E+06
                  DELAY IB STORAGE =    86851.    
 
                          Total IN =   0.19217E+08
 
             OUT:
             ----
                           STORAGE =    91.755    
                     CONSTANT HEAD =    66809.    
                             WELLS =   0.18659E+08
                                ET =   0.49069E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.20861    
                  DELAY IB STORAGE =   0.81023    
 
                         Total OUT =   0.19217E+08
 
                          IN - OUT =   -271.72    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  27
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.10017E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52067E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.27455E+06
                  DELAY IB STORAGE =    90723.    
 
                          Total IN =   0.19206E+08
 
             OUT:
             ----
                           STORAGE =    87.263    
                     CONSTANT HEAD =    66808.    
                             WELLS =   0.18659E+08
                                ET =   0.48085E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.19274    
                  DELAY IB STORAGE =   0.43323E-01
 
                         Total OUT =   0.19207E+08
 
                          IN - OUT =   -807.34    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  27
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.99616E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52067E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.28610E+06
                  DELAY IB STORAGE =   0.10343E+06
 
                          Total IN =   0.19175E+08
 
             OUT:
             ----
                           STORAGE =    71.868    
                     CONSTANT HEAD =    66807.    
                             WELLS =   0.18659E+08
                                ET =   0.44990E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.15566    
                  DELAY IB STORAGE =   0.29403E-01
 
                         Total OUT =   0.19176E+08
 
                          IN - OUT =   -929.79    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  28
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12196E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.38878E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.47367E+06
                  DELAY IB STORAGE =   0.10457E+06
 
                          Total IN =   0.20279E+08
 
             OUT:
             ----
                           STORAGE =    74.899    
                     CONSTANT HEAD =    66807.    
                             WELLS =   0.19771E+08
                                ET =   0.44982E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1.8081    
                  DELAY IB STORAGE =    10.840    
 
                         Total OUT =   0.20288E+08
 
                          IN - OUT =   -8946.8    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  28
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12239E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.38878E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.43505E+06
                  DELAY IB STORAGE =   0.10560E+06
 
                          Total IN =   0.20285E+08
 
             OUT:
             ----
                           STORAGE =    71.820    
                     CONSTANT HEAD =    66807.    
                             WELLS =   0.19771E+08
                                ET =   0.44953E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.17932    
                  DELAY IB STORAGE =    8.3117    
 
                         Total OUT =   0.20288E+08
 
                          IN - OUT =   -2910.7    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  28
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12259E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.38878E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.41513E+06
                  DELAY IB STORAGE =   0.10682E+06
 
                          Total IN =   0.20286E+08
 
             OUT:
             ----
                           STORAGE =    71.474    
                     CONSTANT HEAD =    66807.    
                             WELLS =   0.19771E+08
                                ET =   0.44853E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.16568    
                  DELAY IB STORAGE =    4.2553    
 
                         Total OUT =   0.20287E+08
 
                          IN - OUT =   -943.82    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  28
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12258E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.38878E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.41096E+06
                  DELAY IB STORAGE =   0.10907E+06
 
                          Total IN =   0.20283E+08
 
             OUT:
             ----
                           STORAGE =    70.200    
                     CONSTANT HEAD =    66806.    
                             WELLS =   0.19771E+08
                                ET =   0.44516E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.15578    
                  DELAY IB STORAGE =   0.76275    
 
                         Total OUT =   0.20283E+08
 
                          IN - OUT =   -343.92    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  28
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12238E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.38878E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.41281E+06
                  DELAY IB STORAGE =   0.11600E+06
 
                          Total IN =   0.20272E+08
 
             OUT:
             ----
                           STORAGE =    65.973    
                     CONSTANT HEAD =    66806.    
                             WELLS =   0.19771E+08
                                ET =   0.43409E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.14297    
                  DELAY IB STORAGE =   0.32269E-01
 
                         Total OUT =   0.20272E+08
 
                          IN - OUT =   -410.32    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  28
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12178E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.38878E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.41705E+06
                  DELAY IB STORAGE =   0.13671E+06
 
                          Total IN =   0.20237E+08
 
             OUT:
             ----
                           STORAGE =    51.172    
                     CONSTANT HEAD =    66804.    
                             WELLS =   0.19771E+08
                                ET =   0.40026E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.10760    
                  DELAY IB STORAGE =   0.20077E-01
 
                         Total OUT =   0.20238E+08
 
                          IN - OUT =   -1119.1    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  29
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13559E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.35753E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.57283E+06
                  DELAY IB STORAGE =   0.13791E+06
 
                          Total IN =   0.21463E+08
 
             OUT:
             ----
                           STORAGE =    58.069    
                     CONSTANT HEAD =    66804.    
                             WELLS =   0.21007E+08
                                ET =   0.40018E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    4.0795    
                  DELAY IB STORAGE =    12.497    
 
                         Total OUT =   0.21474E+08
 
                          IN - OUT =   -11168.    
 
               Percent Discrepancy =               -0.05
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  29
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13609E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.35753E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.52931E+06
                  DELAY IB STORAGE =   0.13907E+06
 
                          Total IN =   0.21470E+08
 
             OUT:
             ----
                           STORAGE =    51.312    
                     CONSTANT HEAD =    66804.    
                             WELLS =   0.21007E+08
                                ET =   0.39992E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.23343    
                  DELAY IB STORAGE =    9.6631    
 
                         Total OUT =   0.21474E+08
 
                          IN - OUT =   -3649.7    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  29
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13634E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.35753E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.50417E+06
                  DELAY IB STORAGE =   0.14049E+06
 
                          Total IN =   0.21472E+08
 
             OUT:
             ----
                           STORAGE =    50.774    
                     CONSTANT HEAD =    66804.    
                             WELLS =   0.21007E+08
                                ET =   0.39904E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.11417    
                  DELAY IB STORAGE =    4.5648    
 
                         Total OUT =   0.21473E+08
 
                          IN - OUT =   -1181.3    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  29
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13637E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.35753E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.49655E+06
                  DELAY IB STORAGE =   0.14309E+06
 
                          Total IN =   0.21469E+08
 
             OUT:
             ----
                           STORAGE =    49.577    
                     CONSTANT HEAD =    66804.    
                             WELLS =   0.21007E+08
                                ET =   0.39606E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.10673    
                  DELAY IB STORAGE =   0.50039    
 
                         Total OUT =   0.21470E+08
 
                          IN - OUT =   -433.20    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  29
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13621E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.35753E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.49438E+06
                  DELAY IB STORAGE =   0.15098E+06
 
                          Total IN =   0.21459E+08
 
             OUT:
             ----
                           STORAGE =    45.590    
                     CONSTANT HEAD =    66803.    
                             WELLS =   0.21007E+08
                                ET =   0.38603E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.95007E-01
                  DELAY IB STORAGE =   0.21701E-01
 
                         Total OUT =   0.21460E+08
 
                          IN - OUT =   -484.72    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  29
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13565E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.35753E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.49792E+06
                  DELAY IB STORAGE =   0.17396E+06
 
                          Total IN =   0.21430E+08
 
             OUT:
             ----
                           STORAGE =    32.563    
                     CONSTANT HEAD =    66801.    
                             WELLS =   0.21007E+08
                                ET =   0.35764E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.63187E-01
                  DELAY IB STORAGE =   0.11832E-01
 
                         Total OUT =   0.21431E+08
 
                          IN - OUT =   -1252.1    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  30
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.14239E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.40040E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.61883E+06
                  DELAY IB STORAGE =   0.17515E+06
 
                          Total IN =   0.22654E+08
 
             OUT:
             ----
                           STORAGE =    41.764    
                     CONSTANT HEAD =    66801.    
                             WELLS =   0.22243E+08
                                ET =   0.35759E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    5.4067    
                  DELAY IB STORAGE =    14.587    
 
                         Total OUT =   0.22668E+08
 
                          IN - OUT =   -13631.    
 
               Percent Discrepancy =               -0.06
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  30
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.14288E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.40040E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.57692E+06
                  DELAY IB STORAGE =   0.17631E+06
 
                          Total IN =   0.22663E+08
 
             OUT:
             ----
                           STORAGE =    32.873    
                     CONSTANT HEAD =    66801.    
                             WELLS =   0.22243E+08
                                ET =   0.35743E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.28031    
                  DELAY IB STORAGE =    11.386    
 
                         Total OUT =   0.22667E+08
 
                          IN - OUT =   -4480.5    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  30
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.14315E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.40040E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.55228E+06
                  DELAY IB STORAGE =   0.17770E+06
 
                          Total IN =   0.22666E+08
 
             OUT:
             ----
                           STORAGE =    32.187    
                     CONSTANT HEAD =    66800.    
                             WELLS =   0.22243E+08
                                ET =   0.35687E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.66005E-01
                  DELAY IB STORAGE =    5.4968    
 
                         Total OUT =   0.22667E+08
 
                          IN - OUT =   -492.79    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  30
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.14318E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.40040E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.54428E+06
                  DELAY IB STORAGE =   0.18027E+06
 
                          Total IN =   0.22664E+08
 
             OUT:
             ----
                           STORAGE =    31.159    
                     CONSTANT HEAD =    66800.    
                             WELLS =   0.22243E+08
                                ET =   0.35493E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.61290E-01
                  DELAY IB STORAGE =   0.49887    
 
                         Total OUT =   0.22665E+08
 
                          IN - OUT =   -519.15    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  30
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.14306E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.40040E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.54225E+06
                  DELAY IB STORAGE =   0.18798E+06
 
                          Total IN =   0.22658E+08
 
             OUT:
             ----
                           STORAGE =    27.765    
                     CONSTANT HEAD =    66799.    
                             WELLS =   0.22243E+08
                                ET =   0.34833E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.52186E-01
                  DELAY IB STORAGE =   0.11817E-01
 
                         Total OUT =   0.22658E+08
 
                          IN - OUT =   -556.26    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  30
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.14254E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.40040E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.54816E+06
                  DELAY IB STORAGE =   0.21092E+06
 
                          Total IN =   0.22635E+08
 
             OUT:
             ----
                           STORAGE =    16.657    
                     CONSTANT HEAD =    66797.    
                             WELLS =   0.22243E+08
                                ET =   0.32602E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.28219E-01
                  DELAY IB STORAGE =   0.55145E-02
 
                         Total OUT =   0.22636E+08
 
                          IN - OUT =   -1365.4    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  31
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.15852E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.42634E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.77497E+06
                  DELAY IB STORAGE =   0.21262E+06
 
                          Total IN =   0.24720E+08
 
             OUT:
             ----
                           STORAGE =    27.347    
                     CONSTANT HEAD =    66797.    
                             WELLS =   0.24344E+08
                                ET =   0.32597E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    6.2325    
                  DELAY IB STORAGE =    15.727    
 
                         Total OUT =   0.24737E+08
 
                          IN - OUT =   -16264.    
 
               Percent Discrepancy =               -0.07
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  31
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.15934E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.42634E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.70130E+06
                  DELAY IB STORAGE =   0.21450E+06
 
                          Total IN =   0.24731E+08
 
             OUT:
             ----
                           STORAGE =    17.152    
                     CONSTANT HEAD =    66796.    
                             WELLS =   0.24344E+08
                                ET =   0.32581E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.33612    
                  DELAY IB STORAGE =    12.310    
 
                         Total OUT =   0.24736E+08
 
                          IN - OUT =   -5420.4    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  31
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.15978E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.42634E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.65938E+06
                  DELAY IB STORAGE =   0.21664E+06
 
                          Total IN =   0.24735E+08
 
             OUT:
             ----
                           STORAGE =    16.350    
                     CONSTANT HEAD =    66796.    
                             WELLS =   0.24344E+08
                                ET =   0.32523E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.27563E-01
                  DELAY IB STORAGE =    5.9297    
 
                         Total OUT =   0.24736E+08
 
                          IN - OUT =   -620.19    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  31
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.15986E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.42634E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.64626E+06
                  DELAY IB STORAGE =   0.22001E+06
 
                          Total IN =   0.24733E+08
 
             OUT:
             ----
                           STORAGE =    15.591    
                     CONSTANT HEAD =    66796.    
                             WELLS =   0.24344E+08
                                ET =   0.32324E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.26195E-01
                  DELAY IB STORAGE =   0.53913    
 
                         Total OUT =   0.24734E+08
 
                          IN - OUT =   -669.24    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  31
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.15974E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.42634E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.64195E+06
                  DELAY IB STORAGE =   0.22928E+06
 
                          Total IN =   0.24726E+08
 
             OUT:
             ----
                           STORAGE =    12.951    
                     CONSTANT HEAD =    66795.    
                             WELLS =   0.24344E+08
                                ET =   0.31612E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.20817E-01
                  DELAY IB STORAGE =   0.43835E-02
 
                         Total OUT =   0.24727E+08
 
                          IN - OUT =   -681.22    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  31
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.15917E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.42634E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.64575E+06
                  DELAY IB STORAGE =   0.25596E+06
 
                          Total IN =   0.24699E+08
 
             OUT:
             ----
                           STORAGE =    5.4663    
                     CONSTANT HEAD =    66792.    
                             WELLS =   0.24344E+08
                                ET =   0.29035E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.81994E-02
                  DELAY IB STORAGE =   0.16220E-02
 
                         Total OUT =   0.24701E+08
 
                          IN - OUT =   -1542.1    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  32
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.18134E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.44488E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.95417E+06
                  DELAY IB STORAGE =   0.25803E+06
 
                          Total IN =   0.27413E+08
 
             OUT:
             ----
                           STORAGE =    20.038    
                     CONSTANT HEAD =    66792.    
                             WELLS =   0.27062E+08
                                ET =   0.29029E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    8.5388    
                  DELAY IB STORAGE =    18.397    
 
                         Total OUT =   0.27419E+08
 
                          IN - OUT =   -5888.8    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  32
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.18232E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.44488E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.85764E+06
                  DELAY IB STORAGE =   0.26049E+06
 
                          Total IN =   0.27417E+08
 
             OUT:
             ----
                           STORAGE =    6.4473    
                     CONSTANT HEAD =    66792.    
                             WELLS =   0.27062E+08
                                ET =   0.29009E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.55805    
                  DELAY IB STORAGE =    14.489    
 
                         Total OUT =   0.27419E+08
 
                          IN - OUT =   -1972.7    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  32
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.18283E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.44488E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.80465E+06
                  DELAY IB STORAGE =   0.26331E+06
 
                          Total IN =   0.27417E+08
 
             OUT:
             ----
                           STORAGE =    5.2641    
                     CONSTANT HEAD =    66792.    
                             WELLS =   0.27062E+08
                                ET =   0.28942E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.78962E-02
                  DELAY IB STORAGE =    7.1596    
 
                         Total OUT =   0.27418E+08
 
                          IN - OUT =   -773.67    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  32
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.18287E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.44488E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.79390E+06
                  DELAY IB STORAGE =   0.26766E+06
 
                          Total IN =   0.27415E+08
 
             OUT:
             ----
                           STORAGE =    4.8294    
                     CONSTANT HEAD =    66791.    
                             WELLS =   0.27062E+08
                                ET =   0.28707E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.72441E-02
                  DELAY IB STORAGE =   0.60327    
 
                         Total OUT =   0.27416E+08
 
                          IN - OUT =   -817.02    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  32
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.18267E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.44488E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.79419E+06
                  DELAY IB STORAGE =   0.27945E+06
 
                          Total IN =   0.27406E+08
 
             OUT:
             ----
                           STORAGE =    3.4754    
                     CONSTANT HEAD =    66790.    
                             WELLS =   0.27062E+08
                                ET =   0.27885E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.52131E-02
                  DELAY IB STORAGE =   0.10288E-02
 
                         Total OUT =   0.27407E+08
 
                          IN - OUT =   -819.20    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  32
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.18201E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.44488E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.79977E+06
                  DELAY IB STORAGE =   0.31291E+06
 
                          Total IN =   0.27380E+08
 
             OUT:
             ----
                           STORAGE =   0.58422    
                     CONSTANT HEAD =    66786.    
                             WELLS =   0.27062E+08
                                ET =   0.25268E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.87633E-03
                  DELAY IB STORAGE =   0.23206E-03
 
                         Total OUT =   0.27381E+08
 
                          IN - OUT =   -1210.1    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  33
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.22490E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.47455E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13756E+07
                  DELAY IB STORAGE =   0.31642E+06
 
                          Total IN =   0.32544E+08
 
             OUT:
             ----
                           STORAGE =    140.68    
                     CONSTANT HEAD =    66634.    
                             WELLS =   0.32232E+08
                                ET =   0.25264E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    2.1287    
                  DELAY IB STORAGE =    18.082    
 
                         Total OUT =   0.32552E+08
 
                          IN - OUT =   -7258.6    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  33
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.22673E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.47455E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11921E+07
                  DELAY IB STORAGE =   0.32107E+06
 
                          Total IN =   0.32549E+08
 
             OUT:
             ----
                           STORAGE =    119.99    
                     CONSTANT HEAD =    66643.    
                             WELLS =   0.32232E+08
                                ET =   0.25247E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.17999    
                  DELAY IB STORAGE =    10.046    
 
                         Total OUT =   0.32552E+08
 
                          IN - OUT =   -2448.8    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  33
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.22771E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.47455E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10903E+07
                  DELAY IB STORAGE =   0.32612E+06
 
                          Total IN =   0.32550E+08
 
             OUT:
             ----
                           STORAGE =    70.754    
                     CONSTANT HEAD =    66675.    
                             WELLS =   0.32232E+08
                                ET =   0.25189E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.10613    
                  DELAY IB STORAGE =    1.5263    
 
                         Total OUT =   0.32551E+08
 
                          IN - OUT =   -975.00    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  33
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.22790E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.47455E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10622E+07
                  DELAY IB STORAGE =   0.33310E+06
 
                          Total IN =   0.32548E+08
 
             OUT:
             ----
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    66782.    
                             WELLS =   0.32232E+08
                                ET =   0.24979E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    0.0000    
                  DELAY IB STORAGE =    0.0000    
 
                         Total OUT =   0.32549E+08
 
                          IN - OUT =   -1074.3    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  33
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.22766E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.47455E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10612E+07
                  DELAY IB STORAGE =   0.35040E+06
 
                          Total IN =   0.32541E+08
 
             OUT:
             ----
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    67120.    
                             WELLS =   0.32232E+08
                                ET =   0.24237E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    0.0000    
                  DELAY IB STORAGE =    0.0000    
 
                         Total OUT =   0.32542E+08
 
                          IN - OUT =   -1085.6    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  33
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.22674E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.47455E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10778E+07
                  DELAY IB STORAGE =   0.39907E+06
 
                          Total IN =   0.32514E+08
 
             OUT:
             ----
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    68143.    
                             WELLS =   0.32232E+08
                                ET =   0.21534E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    0.0000    
                  DELAY IB STORAGE =    0.0000    
 
                         Total OUT =   0.32516E+08
 
                          IN - OUT =   -1541.6    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  34
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.29554E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.48935E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.19991E+07
                  DELAY IB STORAGE =   0.40383E+06
 
                          Total IN =   0.40468E+08
 
             OUT:
             ----
                           STORAGE =   0.64699E+06
                     CONSTANT HEAD =    68145.    
                             WELLS =   0.39494E+08
                                ET =   0.21527E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    52472.    
                  DELAY IB STORAGE =    10.935    
 
                         Total OUT =   0.40477E+08
 
                          IN - OUT =   -9319.0    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  34
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.29776E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.48935E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.17142E+07
                  DELAY IB STORAGE =   0.41091E+06
 
                          Total IN =   0.40413E+08
 
             OUT:
             ----
                           STORAGE =   0.62953E+06
                     CONSTANT HEAD =    68153.    
                             WELLS =   0.39494E+08
                                ET =   0.21504E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    8954.8    
                  DELAY IB STORAGE =    4.6573    
 
                         Total OUT =   0.40416E+08
 
                          IN - OUT =   -3163.9    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  34
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.29886E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.48935E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15530E+07
                  DELAY IB STORAGE =   0.41895E+06
 
                          Total IN =   0.40369E+08
 
             OUT:
             ----
                           STORAGE =   0.59221E+06
                     CONSTANT HEAD =    68178.    
                             WELLS =   0.39494E+08
                                ET =   0.21421E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1291.5    
                  DELAY IB STORAGE =   0.34389    
 
                         Total OUT =   0.40370E+08
 
                          IN - OUT =   -1310.9    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  34
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.29829E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.48935E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14978E+07
                  DELAY IB STORAGE =   0.42973E+06
 
                          Total IN =   0.40268E+08
 
             OUT:
             ----
                           STORAGE =   0.49470E+06
                     CONSTANT HEAD =    68263.    
                             WELLS =   0.39494E+08
                                ET =   0.21130E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    793.66    
                  DELAY IB STORAGE =   0.77868E-02
 
                         Total OUT =   0.40269E+08
 
                          IN - OUT =   -1473.3    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  34
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.29608E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.48935E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14820E+07
                  DELAY IB STORAGE =   0.45539E+06
 
                          Total IN =   0.40056E+08
 
             OUT:
             ----
                           STORAGE =   0.29372E+06
                     CONSTANT HEAD =    68546.    
                             WELLS =   0.39494E+08
                                ET =   0.20088E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    464.90    
                  DELAY IB STORAGE =    0.0000    
 
                         Total OUT =   0.40058E+08
 
                          IN - OUT =   -1484.2    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  34
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.29295E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.48935E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14705E+07
                  DELAY IB STORAGE =   0.52529E+06
 
                          Total IN =   0.39802E+08
 
             OUT:
             ----
                           STORAGE =    69059.    
                     CONSTANT HEAD =    69449.    
                             WELLS =   0.39494E+08
                                ET =   0.17030E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    95.968    
                  DELAY IB STORAGE =    0.0000    
 
                         Total OUT =   0.39803E+08
 
                          IN - OUT =   -1124.9    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  35
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.31822E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.51530E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.18348E+07
                  DELAY IB STORAGE =   0.52768E+06
 
                          Total IN =   0.42955E+08
 
             OUT:
             ----
                           STORAGE =    48365.    
                     CONSTANT HEAD =    69451.    
                             WELLS =   0.42677E+08
                                ET =   0.17023E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1009.4    
                  DELAY IB STORAGE =    26.507    
 
                         Total OUT =   0.42967E+08
 
                          IN - OUT =   -11709.    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  35
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.31925E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.51530E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.17295E+07
                  DELAY IB STORAGE =   0.53094E+06
 
                          Total IN =   0.42956E+08
 
             OUT:
             ----
                           STORAGE =    42681.    
                     CONSTANT HEAD =    69458.    
                             WELLS =   0.42677E+08
                                ET =   0.17000E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    501.51    
                  DELAY IB STORAGE =    31.260    
 
                         Total OUT =   0.42960E+08
 
                          IN - OUT =   -3966.7    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  35
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.31978E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.51530E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.16671E+07
                  DELAY IB STORAGE =   0.53542E+06
 
                          Total IN =   0.42951E+08
 
             OUT:
             ----
                           STORAGE =    36192.    
                     CONSTANT HEAD =    69481.    
                             WELLS =   0.42677E+08
                                ET =   0.16923E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    151.68    
                  DELAY IB STORAGE =    25.979    
 
                         Total OUT =   0.42953E+08
 
                          IN - OUT =   -1594.3    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  35
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.31974E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.51530E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.16461E+07
                  DELAY IB STORAGE =   0.54430E+06
 
                          Total IN =   0.42934E+08
 
             OUT:
             ----
                           STORAGE =    21250.    
                     CONSTANT HEAD =    69559.    
                             WELLS =   0.42677E+08
                                ET =   0.16656E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    29.315    
                  DELAY IB STORAGE =    8.7105    
 
                         Total OUT =   0.42935E+08
 
                          IN - OUT =   -420.49    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  35
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.31918E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.51530E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.16461E+07
                  DELAY IB STORAGE =   0.56903E+06
 
                          Total IN =   0.42904E+08
 
             OUT:
             ----
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    69821.    
                             WELLS =   0.42677E+08
                                ET =   0.15794E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    0.0000    
                  DELAY IB STORAGE =   0.37119    
 
                         Total OUT =   0.42905E+08
 
                          IN - OUT =   -1567.8    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  35
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.31813E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.51530E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.16546E+07
                  DELAY IB STORAGE =   0.63981E+06
 
                          Total IN =   0.42878E+08
 
             OUT:
             ----
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    70676.    
                             WELLS =   0.42677E+08
                                ET =   0.13139E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    0.0000    
                  DELAY IB STORAGE =    0.0000    
 
                         Total OUT =   0.42879E+08
 
                          IN - OUT =   -1177.3    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  36
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.33294E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53387E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.18778E+07
                  DELAY IB STORAGE =   0.64145E+06
 
                          Total IN =   0.44769E+08
 
             OUT:
             ----
                           STORAGE =    558.76    
                     CONSTANT HEAD =    70678.    
                             WELLS =   0.44580E+08
                                ET =   0.13134E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    297.53    
                  DELAY IB STORAGE =    22.283    
 
                         Total OUT =   0.44783E+08
 
                          IN - OUT =   -13969.    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  36
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.33366E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53387E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.18124E+07
                  DELAY IB STORAGE =   0.64360E+06
 
                          Total IN =   0.44778E+08
 
             OUT:
             ----
                           STORAGE =    331.96    
                     CONSTANT HEAD =    70685.    
                             WELLS =   0.44580E+08
                                ET =   0.13116E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    150.36    
                  DELAY IB STORAGE =    18.777    
 
                         Total OUT =   0.44782E+08
 
                          IN - OUT =   -4692.8    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  36
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.33402E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53387E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.17748E+07
                  DELAY IB STORAGE =   0.64698E+06
 
                          Total IN =   0.44780E+08
 
             OUT:
             ----
                           STORAGE =    98.005    
                     CONSTANT HEAD =    70706.    
                             WELLS =   0.44580E+08
                                ET =   0.13056E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    25.029    
                  DELAY IB STORAGE =    10.356    
 
                         Total OUT =   0.44782E+08
 
                          IN - OUT =   -1866.6    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  36
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.33405E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53387E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.17631E+07
                  DELAY IB STORAGE =   0.65473E+06
 
                          Total IN =   0.44779E+08
 
             OUT:
             ----
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    70777.    
                             WELLS =   0.44580E+08
                                ET =   0.12849E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    0.0000    
                  DELAY IB STORAGE =    1.8989    
 
                         Total OUT =   0.44779E+08
 
                          IN - OUT =   -471.42    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  36
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.33377E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53387E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.17602E+07
                  DELAY IB STORAGE =   0.67757E+06
 
                          Total IN =   0.44771E+08
 
             OUT:
             ----
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    71019.    
                             WELLS =   0.44580E+08
                                ET =   0.12157E+06
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    0.0000    
                  DELAY IB STORAGE =    0.0000    
 
                         Total OUT =   0.44773E+08
 
                          IN - OUT =   -1714.6    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  36
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.33279E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53387E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.17702E+07
                  DELAY IB STORAGE =   0.74389E+06
 
                          Total IN =   0.44749E+08
 
             OUT:
             ----
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    71818.    
                             WELLS =   0.44580E+08
                                ET =    98456.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    0.0000    
                  DELAY IB STORAGE =    0.0000    
 
                         Total OUT =   0.44750E+08
 
                          IN - OUT =   -1242.6    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  37
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.35305E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55982E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.20704E+07
                  DELAY IB STORAGE =   0.74589E+06
 
                          Total IN =   0.47337E+08
 
             OUT:
             ----
                           STORAGE =    1637.3    
                     CONSTANT HEAD =    71820.    
                             WELLS =   0.47181E+08
                                ET =    98407.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    419.71    
                  DELAY IB STORAGE =    18.508    
 
                         Total OUT =   0.47353E+08
 
                          IN - OUT =   -16072.    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  37
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.35400E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55982E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.19833E+07
                  DELAY IB STORAGE =   0.74860E+06
 
                          Total IN =   0.47347E+08
 
             OUT:
             ----
                           STORAGE =    1247.5    
                     CONSTANT HEAD =    71826.    
                             WELLS =   0.47181E+08
                                ET =    98239.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    155.84    
                  DELAY IB STORAGE =    16.904    
 
                         Total OUT =   0.47352E+08
 
                          IN - OUT =   -5391.0    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  37
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.35448E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55982E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.19336E+07
                  DELAY IB STORAGE =   0.75249E+06
 
                          Total IN =   0.47349E+08
 
             OUT:
             ----
                           STORAGE =    908.33    
                     CONSTANT HEAD =    71846.    
                             WELLS =   0.47181E+08
                                ET =    97661.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    12.574    
                  DELAY IB STORAGE =    8.4952    
 
                         Total OUT =   0.47351E+08
 
                          IN - OUT =   -2134.6    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  37
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.35452E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55982E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.19204E+07
                  DELAY IB STORAGE =   0.76057E+06
 
                          Total IN =   0.47349E+08
 
             OUT:
             ----
                           STORAGE =    595.27    
                     CONSTANT HEAD =    71914.    
                             WELLS =   0.47181E+08
                                ET =    95645.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.89291    
                  DELAY IB STORAGE =    1.4664    
 
                         Total OUT =   0.47349E+08
 
                          IN - OUT =   -530.29    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  37
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.35419E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55982E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.19213E+07
                  DELAY IB STORAGE =   0.78374E+06
 
                          Total IN =   0.47340E+08
 
             OUT:
             ----
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    72144.    
                             WELLS =   0.47181E+08
                                ET =    88907.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    0.0000    
                  DELAY IB STORAGE =   0.12726E-01
 
                         Total OUT =   0.47342E+08
 
                          IN - OUT =   -1929.2    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  37
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.35330E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55982E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.19275E+07
                  DELAY IB STORAGE =   0.85056E+06
 
                          Total IN =   0.47323E+08
 
             OUT:
             ----
                           STORAGE =    0.0000    
                     CONSTANT HEAD =    72908.    
                             WELLS =   0.47181E+08
                                ET =    70895.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    0.0000    
                  DELAY IB STORAGE =    0.0000    
 
                         Total OUT =   0.47325E+08
 
                          IN - OUT =   -1343.3    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  38
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.48296E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.59318E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.40667E+07
                  DELAY IB STORAGE =   0.84884E+06
 
                          Total IN =   0.62761E+08
 
             OUT:
             ----
                           STORAGE =   0.20178E+08
                     CONSTANT HEAD =    72910.    
                             WELLS =   0.40569E+08
                                ET =    70864.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.18754E+07
                  DELAY IB STORAGE =    81.053    
 
                         Total OUT =   0.62766E+08
 
                          IN - OUT =   -5300.7    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  38
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.46650E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.59318E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.30019E+07
                  DELAY IB STORAGE =   0.84857E+06
 
                          Total IN =   0.60050E+08
 
             OUT:
             ----
                           STORAGE =   0.18783E+08
                     CONSTANT HEAD =    72916.    
                             WELLS =   0.40569E+08
                                ET =    70749.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.55650E+06
                  DELAY IB STORAGE =    412.06    
 
                         Total OUT =   0.60052E+08
 
                          IN - OUT =   -1893.3    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  38
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.45030E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.59318E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.25460E+07
                  DELAY IB STORAGE =   0.85117E+06
 
                          Total IN =   0.57976E+08
 
             OUT:
             ----
                           STORAGE =   0.17156E+08
                     CONSTANT HEAD =    72935.    
                             WELLS =   0.40569E+08
                                ET =    70305.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.10758E+06
                  DELAY IB STORAGE =    804.23    
 
                         Total OUT =   0.57977E+08
 
                          IN - OUT =   -453.58    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  38
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.42133E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.59318E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.22964E+07
                  DELAY IB STORAGE =   0.85376E+06
 
                          Total IN =   0.54832E+08
 
             OUT:
             ----
                           STORAGE =   0.14093E+08
                     CONSTANT HEAD =    73002.    
                             WELLS =   0.40569E+08
                                ET =    68874.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    28771.    
                  DELAY IB STORAGE =    727.28    
 
                         Total OUT =   0.54833E+08
 
                          IN - OUT =   -752.66    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  38
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.36812E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.59318E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.19796E+07
                  DELAY IB STORAGE =   0.85869E+06
 
                          Total IN =   0.49200E+08
 
             OUT:
             ----
                           STORAGE =   0.84814E+07
                     CONSTANT HEAD =    73226.    
                             WELLS =   0.40569E+08
                                ET =    64136.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    12554.    
                  DELAY IB STORAGE =    316.28    
 
                         Total OUT =   0.49200E+08
 
                          IN - OUT =   -807.71    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  38
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.31059E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.59318E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.16290E+07
                  DELAY IB STORAGE =   0.87816E+06
 
                          Total IN =   0.43116E+08
 
             OUT:
             ----
                           STORAGE =   0.24168E+07
                     CONSTANT HEAD =    73971.    
                             WELLS =   0.40569E+08
                                ET =    54561.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    3187.3    
                  DELAY IB STORAGE =    60.311    
 
                         Total OUT =   0.43117E+08
 
                          IN - OUT =   -1584.4    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  39
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.34386E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.63025E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.22476E+07
                  DELAY IB STORAGE =   0.87797E+06
 
                          Total IN =   0.47431E+08
 
             OUT:
             ----
                           STORAGE =   0.51037E+07
                     CONSTANT HEAD =    73972.    
                             WELLS =   0.41550E+08
                                ET =    54548.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.65419E+06
                  DELAY IB STORAGE =    314.16    
 
                         Total OUT =   0.47437E+08
 
                          IN - OUT =   -5514.3    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  39
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.33819E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.63025E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.18838E+07
                  DELAY IB STORAGE =   0.87608E+06
 
                          Total IN =   0.46499E+08
 
             OUT:
             ----
                           STORAGE =   0.45555E+07
                     CONSTANT HEAD =    73978.    
                             WELLS =   0.41550E+08
                                ET =    54503.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.26580E+06
                  DELAY IB STORAGE =    841.35    
 
                         Total OUT =   0.46501E+08
 
                          IN - OUT =   -2017.8    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  39
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.33293E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.63025E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.17336E+07
                  DELAY IB STORAGE =   0.87361E+06
 
                          Total IN =   0.45821E+08
 
             OUT:
             ----
                           STORAGE =   0.40674E+07
                     CONSTANT HEAD =    73996.    
                             WELLS =   0.41550E+08
                                ET =    54355.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    73896.    
                  DELAY IB STORAGE =    1178.5    
 
                         Total OUT =   0.45821E+08
 
                          IN - OUT =   -485.51    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  39
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.32543E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.63025E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.16638E+07
                  DELAY IB STORAGE =   0.87341E+06
 
                          Total IN =   0.45000E+08
 
             OUT:
             ----
                           STORAGE =   0.33075E+07
                     CONSTANT HEAD =    74059.    
                             WELLS =   0.41550E+08
                                ET =    53877.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    14606.    
                  DELAY IB STORAGE =    793.49    
 
                         Total OUT =   0.45001E+08
 
                          IN - OUT =   -762.39    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  39
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.31276E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.63025E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15820E+07
                  DELAY IB STORAGE =   0.87879E+06
 
                          Total IN =   0.43657E+08
 
             OUT:
             ----
                           STORAGE =   0.19774E+07
                     CONSTANT HEAD =    74270.    
                             WELLS =   0.41550E+08
                                ET =    52253.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    3613.7    
                  DELAY IB STORAGE =    205.32    
 
                         Total OUT =   0.43658E+08
 
                          IN - OUT =   -866.66    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  39
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.29950E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.63025E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15121E+07
                  DELAY IB STORAGE =   0.89966E+06
 
                          Total IN =   0.42281E+08
 
             OUT:
             ----
                           STORAGE =   0.60790E+06
                     CONSTANT HEAD =    74976.    
                             WELLS =   0.41550E+08
                                ET =    49029.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    766.42    
                  DELAY IB STORAGE =    21.302    
 
                         Total OUT =   0.42283E+08
 
                          IN - OUT =   -1644.6    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  40
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.29686E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.66734E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.18958E+07
                  DELAY IB STORAGE =   0.89925E+06
 
                          Total IN =   0.42772E+08
 
             OUT:
             ----
                           STORAGE =   0.36052E+07
                     CONSTANT HEAD =    74977.    
                             WELLS =   0.38493E+08
                                ET =    49022.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.56781E+06
                  DELAY IB STORAGE =    21.621    
 
                         Total OUT =   0.42790E+08
 
                          IN - OUT =   -18509.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  40
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.29131E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.66734E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15707E+07
                  DELAY IB STORAGE =   0.89854E+06
 
                          Total IN =   0.41891E+08
 
             OUT:
             ----
                           STORAGE =   0.30988E+07
                     CONSTANT HEAD =    74982.    
                             WELLS =   0.38493E+08
                                ET =    48998.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.17677E+06
                  DELAY IB STORAGE =    315.36    
 
                         Total OUT =   0.41893E+08
 
                          IN - OUT =   -2090.0    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  40
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.28751E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.66734E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14429E+07
                  DELAY IB STORAGE =   0.89788E+06
 
                          Total IN =   0.41382E+08
 
             OUT:
             ----
                           STORAGE =   0.27327E+07
                     CONSTANT HEAD =    75001.    
                             WELLS =   0.38493E+08
                                ET =    48909.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    33225.    
                  DELAY IB STORAGE =    618.57    
 
                         Total OUT =   0.41384E+08
 
                          IN - OUT =   -1187.4    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  40
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.28215E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.66734E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14022E+07
                  DELAY IB STORAGE =   0.89686E+06
 
                          Total IN =   0.40805E+08
 
             OUT:
             ----
                           STORAGE =   0.21827E+07
                     CONSTANT HEAD =    75062.    
                             WELLS =   0.38493E+08
                                ET =    48580.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    6055.0    
                  DELAY IB STORAGE =    493.44    
 
                         Total OUT =   0.40806E+08
 
                          IN - OUT =   -779.26    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  40
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.27316E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.66734E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13618E+07
                  DELAY IB STORAGE =   0.89660E+06
 
                          Total IN =   0.39865E+08
 
             OUT:
             ----
                           STORAGE =   0.12479E+07
                     CONSTANT HEAD =    75269.    
                             WELLS =   0.38493E+08
                                ET =    47472.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1886.0    
                  DELAY IB STORAGE =    204.75    
 
                         Total OUT =   0.39866E+08
 
                          IN - OUT =   -829.96    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  40
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.26479E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.66734E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13404E+07
                  DELAY IB STORAGE =   0.90149E+06
 
                          Total IN =   0.39011E+08
 
             OUT:
             ----
                           STORAGE =   0.39782E+06
                     CONSTANT HEAD =    75960.    
                             WELLS =   0.38493E+08
                                ET =    45529.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    493.59    
                  DELAY IB STORAGE =    46.615    
 
                         Total OUT =   0.39013E+08
 
                          IN - OUT =   -1495.0    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  41
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.28537E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.73036E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.17904E+07
                  DELAY IB STORAGE =   0.90215E+06
 
                          Total IN =   0.42151E+08
 
             OUT:
             ----
                           STORAGE =   0.21243E+07
                     CONSTANT HEAD =    75961.    
                             WELLS =   0.39557E+08
                                ET =    45524.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.36670E+06
                  DELAY IB STORAGE =    134.04    
 
                         Total OUT =   0.42169E+08
 
                          IN - OUT =   -18739.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  41
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.28345E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.73036E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15409E+07
                  DELAY IB STORAGE =   0.90160E+06
 
                          Total IN =   0.41708E+08
 
             OUT:
             ----
                           STORAGE =   0.18855E+07
                     CONSTANT HEAD =    75966.    
                             WELLS =   0.39557E+08
                                ET =    45510.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.15093E+06
                  DELAY IB STORAGE =    336.42    
 
                         Total OUT =   0.41715E+08
 
                          IN - OUT =   -6497.8    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  41
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.28140E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.73036E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14386E+07
                  DELAY IB STORAGE =   0.89995E+06
 
                          Total IN =   0.41399E+08
 
             OUT:
             ----
                           STORAGE =   0.16778E+07
                     CONSTANT HEAD =    75983.    
                             WELLS =   0.39557E+08
                                ET =    45462.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    44165.    
                  DELAY IB STORAGE =    507.85    
 
                         Total OUT =   0.41401E+08
 
                          IN - OUT =   -1235.7    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  41
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.27819E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.73036E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14132E+07
                  DELAY IB STORAGE =   0.89909E+06
 
                          Total IN =   0.41052E+08
 
             OUT:
             ----
                           STORAGE =   0.13652E+07
                     CONSTANT HEAD =    76041.    
                             WELLS =   0.39557E+08
                                ET =    45307.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    9310.6    
                  DELAY IB STORAGE =    409.65    
 
                         Total OUT =   0.41053E+08
 
                          IN - OUT =   -727.78    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  41
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.27305E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.73036E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13946E+07
                  DELAY IB STORAGE =   0.90114E+06
 
                          Total IN =   0.40522E+08
 
             OUT:
             ----
                           STORAGE =   0.84467E+06
                     CONSTANT HEAD =    76237.    
                             WELLS =   0.39557E+08
                                ET =    44814.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1807.0    
                  DELAY IB STORAGE =    159.74    
 
                         Total OUT =   0.40524E+08
 
                          IN - OUT =   -2342.5    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  41
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.26709E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.73036E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13945E+07
                  DELAY IB STORAGE =   0.91244E+06
 
                          Total IN =   0.39937E+08
 
             OUT:
             ----
                           STORAGE =   0.26117E+06
                     CONSTANT HEAD =    76891.    
                             WELLS =   0.39557E+08
                                ET =    43114.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    319.45    
                  DELAY IB STORAGE =    20.612    
 
                         Total OUT =   0.39938E+08
 
                          IN - OUT =   -1485.4    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  42
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.28778E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.81190E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.20228E+07
                  DELAY IB STORAGE =   0.91554E+06
 
                          Total IN =   0.43453E+08
 
             OUT:
             ----
                           STORAGE =   0.18015E+07
                     CONSTANT HEAD =    76892.    
                             WELLS =   0.41261E+08
                                ET =    43111.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.28944E+06
                  DELAY IB STORAGE =    37.295    
 
                         Total OUT =   0.43472E+08
 
                          IN - OUT =   -19001.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  42
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.28586E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.81190E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.17131E+07
                  DELAY IB STORAGE =   0.92126E+06
 
                          Total IN =   0.42957E+08
 
             OUT:
             ----
                           STORAGE =   0.14937E+07
                     CONSTANT HEAD =    76897.    
                             WELLS =   0.41261E+08
                                ET =    43098.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    84676.    
                  DELAY IB STORAGE =    326.48    
 
                         Total OUT =   0.42959E+08
 
                          IN - OUT =   -2116.1    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  42
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.28484E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.81190E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15342E+07
                  DELAY IB STORAGE =   0.92844E+06
 
                          Total IN =   0.42683E+08
 
             OUT:
             ----
                           STORAGE =   0.12844E+07
                     CONSTANT HEAD =    76914.    
                             WELLS =   0.41261E+08
                                ET =    43051.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    17596.    
                  DELAY IB STORAGE =    552.70    
 
                         Total OUT =   0.42683E+08
 
                          IN - OUT =   -535.07    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  42
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.28206E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.81190E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14559E+07
                  DELAY IB STORAGE =   0.93434E+06
 
                          Total IN =   0.42333E+08
 
             OUT:
             ----
                           STORAGE =   0.95017E+06
                     CONSTANT HEAD =    76970.    
                             WELLS =   0.41261E+08
                                ET =    42864.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    2366.8    
                  DELAY IB STORAGE =    343.48    
 
                         Total OUT =   0.42333E+08
 
                          IN - OUT =   -827.39    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  42
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.27720E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.81190E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14366E+07
                  DELAY IB STORAGE =   0.94053E+06
 
                          Total IN =   0.41833E+08
 
             OUT:
             ----
                           STORAGE =   0.45356E+06
                     CONSTANT HEAD =    77162.    
                             WELLS =   0.41261E+08
                                ET =    42096.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    599.54    
                  DELAY IB STORAGE =    58.525    
 
                         Total OUT =   0.41834E+08
 
                          IN - OUT =   -959.58    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  42
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.27345E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.81190E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14291E+07
                  DELAY IB STORAGE =   0.95228E+06
 
                          Total IN =   0.41463E+08
 
             OUT:
             ----
                           STORAGE =    86885.    
                     CONSTANT HEAD =    77802.    
                             WELLS =   0.41261E+08
                                ET =    39191.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    111.79    
                  DELAY IB STORAGE =    7.9750    
 
                         Total OUT =   0.41465E+08
 
                          IN - OUT =   -1588.2    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  43
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.27539E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.96524E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.17670E+07
                  DELAY IB STORAGE =   0.94935E+06
 
                          Total IN =   0.43526E+08
 
             OUT:
             ----
                           STORAGE =   0.40214E+07
                     CONSTANT HEAD =    77804.    
                             WELLS =   0.38584E+08
                                ET =    39184.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.82212E+06
                  DELAY IB STORAGE =    22.301    
 
                         Total OUT =   0.43545E+08
 
                          IN - OUT =   -19413.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  43
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.26946E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.96524E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14606E+07
                  DELAY IB STORAGE =   0.94285E+06
 
                          Total IN =   0.42619E+08
 
             OUT:
             ----
                           STORAGE =   0.35686E+07
                     CONSTANT HEAD =    77808.    
                             WELLS =   0.38584E+08
                                ET =    39163.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.35130E+06
                  DELAY IB STORAGE =    273.99    
 
                         Total OUT =   0.42622E+08
 
                          IN - OUT =   -2162.1    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  43
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.26408E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.96524E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13439E+07
                  DELAY IB STORAGE =   0.93492E+06
 
                          Total IN =   0.41957E+08
 
             OUT:
             ----
                           STORAGE =   0.31507E+07
                     CONSTANT HEAD =    77824.    
                             WELLS =   0.38584E+08
                                ET =    39092.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.10412E+06
                  DELAY IB STORAGE =    864.22    
 
                         Total OUT =   0.41957E+08
 
                          IN - OUT =   -570.03    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  43
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.25713E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.96524E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12955E+07
                  DELAY IB STORAGE =   0.92780E+06
 
                          Total IN =   0.41207E+08
 
             OUT:
             ----
                           STORAGE =   0.24829E+07
                     CONSTANT HEAD =    77878.    
                             WELLS =   0.38584E+08
                                ET =    38873.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    22346.    
                  DELAY IB STORAGE =    884.69    
 
                         Total OUT =   0.41207E+08
 
                          IN - OUT =   -778.65    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  43
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.24631E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.96524E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12415E+07
                  DELAY IB STORAGE =   0.91954E+06
 
                          Total IN =   0.40062E+08
 
             OUT:
             ----
                           STORAGE =   0.13587E+07
                     CONSTANT HEAD =    78059.    
                             WELLS =   0.38584E+08
                                ET =    38214.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    4621.3    
                  DELAY IB STORAGE =    358.09    
 
                         Total OUT =   0.40064E+08
 
                          IN - OUT =   -2170.5    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  43
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.23674E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.96524E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12010E+07
                  DELAY IB STORAGE =   0.90895E+06
 
                          Total IN =   0.39053E+08
 
             OUT:
             ----
                           STORAGE =   0.35615E+06
                     CONSTANT HEAD =    78664.    
                             WELLS =   0.38584E+08
                                ET =    36053.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    438.66    
                  DELAY IB STORAGE =    13.018    
 
                         Total OUT =   0.39056E+08
 
                          IN - OUT =   -2347.2    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  44
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.23835E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11828E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14915E+07
                  DELAY IB STORAGE =   0.90779E+06
 
                          Total IN =   0.41680E+08
 
             OUT:
             ----
                           STORAGE =   0.44699E+07
                     CONSTANT HEAD =    78667.    
                             WELLS =   0.36564E+08
                                ET =    36048.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.54973E+06
                  DELAY IB STORAGE =    20.359    
 
                         Total OUT =   0.41698E+08
 
                          IN - OUT =   -18255.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  44
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.23482E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11828E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12456E+07
                  DELAY IB STORAGE =   0.90381E+06
 
                          Total IN =   0.41077E+08
 
             OUT:
             ----
                           STORAGE =   0.41681E+07
                     CONSTANT HEAD =    78675.    
                             WELLS =   0.36564E+08
                                ET =    36032.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.23248E+06
                  DELAY IB STORAGE =    182.00    
 
                         Total OUT =   0.41079E+08
 
                          IN - OUT =   -2035.7    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  44
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.23089E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11828E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11609E+07
                  DELAY IB STORAGE =   0.89825E+06
 
                          Total IN =   0.40594E+08
 
             OUT:
             ----
                           STORAGE =   0.38504E+07
                     CONSTANT HEAD =    78703.    
                             WELLS =   0.36564E+08
                                ET =    35975.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    67567.    
                  DELAY IB STORAGE =    372.52    
 
                         Total OUT =   0.40597E+08
 
                          IN - OUT =   -2988.7    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  44
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.22487E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11828E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11198E+07
                  DELAY IB STORAGE =   0.89178E+06
 
                          Total IN =   0.39944E+08
 
             OUT:
             ----
                           STORAGE =   0.32509E+07
                     CONSTANT HEAD =    78790.    
                             WELLS =   0.36564E+08
                                ET =    35771.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    15214.    
                  DELAY IB STORAGE =    293.72    
 
                         Total OUT =   0.39945E+08
 
                          IN - OUT =   -677.55    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  44
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.21401E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11828E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10623E+07
                  DELAY IB STORAGE =   0.88088E+06
 
                          Total IN =   0.38789E+08
 
             OUT:
             ----
                           STORAGE =   0.21090E+07
                     CONSTANT HEAD =    79051.    
                             WELLS =   0.36564E+08
                                ET =    35057.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    4158.9    
                  DELAY IB STORAGE =    137.44    
 
                         Total OUT =   0.38791E+08
 
                          IN - OUT =   -2097.8    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  44
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.20252E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11828E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10061E+07
                  DELAY IB STORAGE =   0.85854E+06
 
                          Total IN =   0.37562E+08
 
             OUT:
             ----
                           STORAGE =   0.88648E+06
                     CONSTANT HEAD =    79819.    
                             WELLS =   0.36564E+08
                                ET =    32593.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1149.5    
                  DELAY IB STORAGE =    38.302    
 
                         Total OUT =   0.37564E+08
 
                          IN - OUT =   -2414.7    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  45
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.23187E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12784E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.16616E+07
                  DELAY IB STORAGE =   0.86068E+06
 
                          Total IN =   0.42110E+08
 
             OUT:
             ----
                           STORAGE =   0.38003E+07
                     CONSTANT HEAD =    79817.    
                             WELLS =   0.37786E+08
                                ET =    32588.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.42894E+06
                  DELAY IB STORAGE =    57.824    
 
                         Total OUT =   0.42127E+08
 
                          IN - OUT =   -17126.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  45
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.22893E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12784E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12923E+07
                  DELAY IB STORAGE =   0.86434E+06
 
                          Total IN =   0.41451E+08
 
             OUT:
             ----
                           STORAGE =   0.34327E+07
                     CONSTANT HEAD =    79813.    
                             WELLS =   0.37786E+08
                                ET =    32569.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.12181E+06
                  DELAY IB STORAGE =    244.17    
 
                         Total OUT =   0.41453E+08
 
                          IN - OUT =   -1935.7    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  45
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.22672E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12784E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11076E+07
                  DELAY IB STORAGE =   0.86678E+06
 
                          Total IN =   0.41047E+08
 
             OUT:
             ----
                           STORAGE =   0.31234E+07
                     CONSTANT HEAD =    79798.    
                             WELLS =   0.37786E+08
                                ET =    32509.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    25680.    
                  DELAY IB STORAGE =    664.84    
 
                         Total OUT =   0.41048E+08
 
                          IN - OUT =   -536.19    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  45
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.22207E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12784E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10462E+07
                  DELAY IB STORAGE =   0.86638E+06
 
                          Total IN =   0.40521E+08
 
             OUT:
             ----
                           STORAGE =   0.26173E+07
                     CONSTANT HEAD =    79746.    
                             WELLS =   0.37786E+08
                                ET =    32318.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    6453.3    
                  DELAY IB STORAGE =    574.43    
 
                         Total OUT =   0.40522E+08
 
                          IN - OUT =   -700.79    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  45
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.21308E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12784E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10173E+07
                  DELAY IB STORAGE =   0.86006E+06
 
                          Total IN =   0.39587E+08
 
             OUT:
             ----
                           STORAGE =   0.16894E+07
                     CONSTANT HEAD =    79571.    
                             WELLS =   0.37786E+08
                                ET =    31715.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    2355.3    
                  DELAY IB STORAGE =    184.28    
 
                         Total OUT =   0.39589E+08
 
                          IN - OUT =   -2234.2    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  45
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.20292E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12784E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.98366E+06
                  DELAY IB STORAGE =   0.84124E+06
 
                          Total IN =   0.38518E+08
 
             OUT:
             ----
                           STORAGE =   0.62565E+06
                     CONSTANT HEAD =    79033.    
                             WELLS =   0.37786E+08
                                ET =    29719.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    750.34    
                  DELAY IB STORAGE =    19.946    
 
                         Total OUT =   0.38521E+08
 
                          IN - OUT =   -2478.8    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  46
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.21946E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.13353E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12138E+07
                  DELAY IB STORAGE =   0.83943E+06
 
                          Total IN =   0.40970E+08
 
             OUT:
             ----
                           STORAGE =   0.41933E+07
                     CONSTANT HEAD =    79034.    
                             WELLS =   0.36093E+08
                                ET =    29714.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.59181E+06
                  DELAY IB STORAGE =    63.873    
 
                         Total OUT =   0.40986E+08
 
                          IN - OUT =   -16659.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  46
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.21493E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.13353E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.97755E+06
                  DELAY IB STORAGE =   0.83465E+06
 
                          Total IN =   0.40277E+08
 
             OUT:
             ----
                           STORAGE =   0.38288E+07
                     CONSTANT HEAD =    79035.    
                             WELLS =   0.36093E+08
                                ET =    29699.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.24797E+06
                  DELAY IB STORAGE =    240.17    
 
                         Total OUT =   0.40278E+08
 
                          IN - OUT =   -1816.2    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  46
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.21049E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.13353E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.90998E+06
                  DELAY IB STORAGE =   0.82939E+06
 
                          Total IN =   0.39759E+08
 
             OUT:
             ----
                           STORAGE =   0.34894E+07
                     CONSTANT HEAD =    79034.    
                             WELLS =   0.36093E+08
                                ET =    29649.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    70610.    
                  DELAY IB STORAGE =    700.66    
 
                         Total OUT =   0.39762E+08
 
                          IN - OUT =   -2725.3    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  46
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.20461E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.13353E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.90177E+06
                  DELAY IB STORAGE =   0.82411E+06
 
                          Total IN =   0.39158E+08
 
             OUT:
             ----
                           STORAGE =   0.29417E+07
                     CONSTANT HEAD =    79018.    
                             WELLS =   0.36093E+08
                                ET =    29476.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    15680.    
                  DELAY IB STORAGE =    556.12    
 
                         Total OUT =   0.39159E+08
 
                          IN - OUT =   -1136.4    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  46
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.19415E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.13353E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.92044E+06
                  DELAY IB STORAGE =   0.81480E+06
 
                          Total IN =   0.38121E+08
 
             OUT:
             ----
                           STORAGE =   0.19185E+07
                     CONSTANT HEAD =    78897.    
                             WELLS =   0.36093E+08
                                ET =    28900.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    4172.2    
                  DELAY IB STORAGE =    175.32    
 
                         Total OUT =   0.38123E+08
 
                          IN - OUT =   -1832.7    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  46
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.18266E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.13353E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.90315E+06
                  DELAY IB STORAGE =   0.79338E+06
 
                          Total IN =   0.36934E+08
 
             OUT:
             ----
                           STORAGE =   0.73715E+06
                     CONSTANT HEAD =    78206.    
                             WELLS =   0.36093E+08
                                ET =    27027.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    948.31    
                  DELAY IB STORAGE =    40.750    
 
                         Total OUT =   0.36936E+08
 
                          IN - OUT =   -2150.5    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  47
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.21010E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.14128E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15801E+07
                  DELAY IB STORAGE =   0.79609E+06
 
                          Total IN =   0.41132E+08
 
             OUT:
             ----
                           STORAGE =   0.45876E+07
                     CONSTANT HEAD =    78205.    
                             WELLS =   0.36020E+08
                                ET =    27023.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.43472E+06
                  DELAY IB STORAGE =    37.909    
 
                         Total OUT =   0.41147E+08
 
                          IN - OUT =   -15834.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  47
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.20736E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.14128E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12250E+07
                  DELAY IB STORAGE =   0.80219E+06
 
                          Total IN =   0.40508E+08
 
             OUT:
             ----
                           STORAGE =   0.42751E+07
                     CONSTANT HEAD =    78199.    
                             WELLS =   0.36020E+08
                                ET =    27012.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.10990E+06
                  DELAY IB STORAGE =    66.920    
 
                         Total OUT =   0.40510E+08
 
                          IN - OUT =   -1745.8    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  47
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.20560E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.14128E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10013E+07
                  DELAY IB STORAGE =   0.81040E+06
 
                          Total IN =   0.40117E+08
 
             OUT:
             ----
                           STORAGE =   0.39747E+07
                     CONSTANT HEAD =    78180.    
                             WELLS =   0.36020E+08
                                ET =    26973.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    18323.    
                  DELAY IB STORAGE =    116.97    
 
                         Total OUT =   0.40118E+08
 
                          IN - OUT =   -1102.0    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  47
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.20121E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.14128E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.90766E+06
                  DELAY IB STORAGE =   0.81414E+06
 
                          Total IN =   0.39588E+08
 
             OUT:
             ----
                           STORAGE =   0.34578E+07
                     CONSTANT HEAD =    78109.    
                             WELLS =   0.36020E+08
                                ET =    26834.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    5920.2    
                  DELAY IB STORAGE =    97.449    
 
                         Total OUT =   0.39589E+08
 
                          IN - OUT =   -707.85    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  47
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.19152E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.14128E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.86066E+06
                  DELAY IB STORAGE =   0.80902E+06
 
                          Total IN =   0.38567E+08
 
             OUT:
             ----
                           STORAGE =   0.24398E+07
                     CONSTANT HEAD =    77846.    
                             WELLS =   0.36020E+08
                                ET =    26327.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    3465.3    
                  DELAY IB STORAGE =    45.873    
 
                         Total OUT =   0.38567E+08
 
                          IN - OUT =   -842.25    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  47
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.17781E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.14128E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.83746E+06
                  DELAY IB STORAGE =   0.78337E+06
 
                          Total IN =   0.37147E+08
 
             OUT:
             ----
                           STORAGE =   0.10252E+07
                     CONSTANT HEAD =    76919.    
                             WELLS =   0.36020E+08
                                ET =    24479.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1456.3    
                  DELAY IB STORAGE =    44.599    
 
                         Total OUT =   0.37148E+08
 
                          IN - OUT =   -1480.2    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  48
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.27938E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11932E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.16816E+07
                  DELAY IB STORAGE =   0.78432E+06
 
                          Total IN =   0.45953E+08
 
             OUT:
             ----
                           STORAGE =   0.79372E+07
                     CONSTANT HEAD =    76916.    
                             WELLS =   0.37339E+08
                                ET =    24475.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.59141E+06
                  DELAY IB STORAGE =    38.683    
 
                         Total OUT =   0.45969E+08
 
                          IN - OUT =   -15856.    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  48
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.27531E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11932E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12719E+07
                  DELAY IB STORAGE =   0.78377E+06
 
                          Total IN =   0.45137E+08
 
             OUT:
             ----
                           STORAGE =   0.74582E+07
                     CONSTANT HEAD =    76906.    
                             WELLS =   0.37339E+08
                                ET =    24461.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.23948E+06
                  DELAY IB STORAGE =    90.005    
 
                         Total OUT =   0.45138E+08
 
                          IN - OUT =   -1743.4    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  48
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.27039E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11932E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10938E+07
                  DELAY IB STORAGE =   0.78136E+06
 
                          Total IN =   0.44464E+08
 
             OUT:
             ----
                           STORAGE =   0.69507E+07
                     CONSTANT HEAD =    76871.    
                             WELLS =   0.37339E+08
                                ET =    24412.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    73337.    
                  DELAY IB STORAGE =    180.09    
 
                         Total OUT =   0.44465E+08
 
                          IN - OUT =   -1188.8    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  48
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.26020E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11932E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10321E+07
                  DELAY IB STORAGE =   0.77774E+06
 
                          Total IN =   0.43380E+08
 
             OUT:
             ----
                           STORAGE =   0.59215E+07
                     CONSTANT HEAD =    76754.    
                             WELLS =   0.37339E+08
                                ET =    24228.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    18607.    
                  DELAY IB STORAGE =    124.50    
 
                         Total OUT =   0.43380E+08
 
                          IN - OUT =   -577.29    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  48
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.24085E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11932E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10449E+07
                  DELAY IB STORAGE =   0.77367E+06
 
                          Total IN =   0.41454E+08
 
             OUT:
             ----
                           STORAGE =   0.40101E+07
                     CONSTANT HEAD =    76361.    
                             WELLS =   0.37339E+08
                                ET =    23561.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    6408.6    
                  DELAY IB STORAGE =    86.813    
 
                         Total OUT =   0.41456E+08
 
                          IN - OUT =   -1937.1    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  48
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.21666E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11932E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10090E+07
                  DELAY IB STORAGE =   0.77034E+06
 
                          Total IN =   0.38995E+08
 
             OUT:
             ----
                           STORAGE =   0.15587E+07
                     CONSTANT HEAD =    75119.    
                             WELLS =   0.37339E+08
                                ET =    21254.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    2045.7    
                  DELAY IB STORAGE =    83.311    
 
                         Total OUT =   0.38997E+08
 
                          IN - OUT =   -1347.3    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  49
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.28494E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12137E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.17119E+07
                  DELAY IB STORAGE =   0.77135E+06
 
                          Total IN =   0.46732E+08
 
             OUT:
             ----
                           STORAGE =   0.54987E+07
                     CONSTANT HEAD =    75118.    
                             WELLS =   0.40573E+08
                                ET =    21249.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.57976E+06
                  DELAY IB STORAGE =    74.510    
 
                         Total OUT =   0.46748E+08
 
                          IN - OUT =   -15908.    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  49
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.28148E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12137E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13189E+07
                  DELAY IB STORAGE =   0.77206E+06
 
                          Total IN =   0.45994E+08
 
             OUT:
             ----
                           STORAGE =   0.51203E+07
                     CONSTANT HEAD =    75113.    
                             WELLS =   0.40573E+08
                                ET =    21232.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.20558E+06
                  DELAY IB STORAGE =    167.76    
 
                         Total OUT =   0.45995E+08
 
                          IN - OUT =   -1738.7    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  49
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.27717E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12137E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11742E+07
                  DELAY IB STORAGE =   0.77305E+06
 
                          Total IN =   0.45419E+08
 
             OUT:
             ----
                           STORAGE =   0.47001E+07
                     CONSTANT HEAD =    75098.    
                             WELLS =   0.40573E+08
                                ET =    21173.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    49696.    
                  DELAY IB STORAGE =    459.31    
 
                         Total OUT =   0.45419E+08
 
                          IN - OUT =   -486.78    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  49
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.26966E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12137E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11310E+07
                  DELAY IB STORAGE =   0.77488E+06
 
                          Total IN =   0.44627E+08
 
             OUT:
             ----
                           STORAGE =   0.39459E+07
                     CONSTANT HEAD =    75049.    
                             WELLS =   0.40573E+08
                                ET =    20971.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    12192.    
                  DELAY IB STORAGE =    479.97    
 
                         Total OUT =   0.44627E+08
 
                          IN - OUT =   -646.40    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  49
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.25554E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12137E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11548E+07
                  DELAY IB STORAGE =   0.77927E+06
 
                          Total IN =   0.43243E+08
 
             OUT:
             ----
                           STORAGE =   0.25727E+07
                     CONSTANT HEAD =    74888.    
                             WELLS =   0.40573E+08
                                ET =    20278.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    4112.3    
                  DELAY IB STORAGE =    174.56    
 
                         Total OUT =   0.43245E+08
 
                          IN - OUT =   -2128.2    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  49
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.23900E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12137E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11567E+07
                  DELAY IB STORAGE =   0.79100E+06
 
                          Total IN =   0.41602E+08
 
             OUT:
             ----
                           STORAGE =   0.93805E+06
                     CONSTANT HEAD =    74405.    
                             WELLS =   0.40573E+08
                                ET =    17867.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1249.5    
                  DELAY IB STORAGE =    27.595    
 
                         Total OUT =   0.41604E+08
 
                          IN - OUT =   -2385.9    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  50
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.31204E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11206E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.22716E+07
                  DELAY IB STORAGE =   0.79333E+06
 
                          Total IN =   0.49093E+08
 
             OUT:
             ----
                           STORAGE =   0.56283E+07
                     CONSTANT HEAD =    74402.    
                             WELLS =   0.42632E+08
                                ET =    17861.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.74476E+06
                  DELAY IB STORAGE =    24.776    
 
                         Total OUT =   0.49098E+08
 
                          IN - OUT =   -4959.3    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  50
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.30896E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11206E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.17053E+07
                  DELAY IB STORAGE =   0.79497E+06
 
                          Total IN =   0.48220E+08
 
             OUT:
             ----
                           STORAGE =   0.51836E+07
                     CONSTANT HEAD =    74392.    
                             WELLS =   0.42632E+08
                                ET =    17843.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.31301E+06
                  DELAY IB STORAGE =    161.21    
 
                         Total OUT =   0.48221E+08
 
                          IN - OUT =   -1855.8    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  50
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.30559E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11206E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14413E+07
                  DELAY IB STORAGE =   0.79585E+06
 
                          Total IN =   0.47620E+08
 
             OUT:
             ----
                           STORAGE =   0.47945E+07
                     CONSTANT HEAD =    74351.    
                             WELLS =   0.42632E+08
                                ET =    17786.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.10024E+06
                  DELAY IB STORAGE =    1250.7    
 
                         Total OUT =   0.47620E+08
 
                          IN - OUT =   -451.53    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  50
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.29843E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11206E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13760E+07
                  DELAY IB STORAGE =   0.79695E+06
 
                          Total IN =   0.46839E+08
 
             OUT:
             ----
                           STORAGE =   0.40895E+07
                     CONSTANT HEAD =    74177.    
                             WELLS =   0.42632E+08
                                ET =    17621.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    25086.    
                  DELAY IB STORAGE =    1251.0    
 
                         Total OUT =   0.46840E+08
 
                          IN - OUT =   -560.66    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  50
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.28470E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11206E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13817E+07
                  DELAY IB STORAGE =   0.80387E+06
 
                          Total IN =   0.45479E+08
 
             OUT:
             ----
                           STORAGE =   0.27498E+07
                     CONSTANT HEAD =    73451.    
                             WELLS =   0.42632E+08
                                ET =    17146.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7296.8    
                  DELAY IB STORAGE =    545.19    
 
                         Total OUT =   0.45481E+08
 
                          IN - OUT =   -1970.0    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  50
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.26771E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11206E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14022E+07
                  DELAY IB STORAGE =   0.82777E+06
 
                          Total IN =   0.43825E+08
 
             OUT:
             ----
                           STORAGE =   0.11058E+07
                     CONSTANT HEAD =    71011.    
                             WELLS =   0.42632E+08
                                ET =    15523.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1596.7    
                  DELAY IB STORAGE =    72.923    
 
                         Total OUT =   0.43826E+08
 
                          IN - OUT =   -1615.6    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  51
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.32797E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11619E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.24631E+07
                  DELAY IB STORAGE =   0.82902E+06
 
                          Total IN =   0.51325E+08
 
             OUT:
             ----
                           STORAGE =   0.77064E+07
                     CONSTANT HEAD =    71006.    
                             WELLS =   0.42703E+08
                                ET =    15519.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.84693E+06
                  DELAY IB STORAGE =    84.219    
 
                         Total OUT =   0.51343E+08
 
                          IN - OUT =   -17113.    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  51
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.32285E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11619E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.18568E+07
                  DELAY IB STORAGE =   0.82978E+06
 
                          Total IN =   0.50208E+08
 
             OUT:
             ----
                           STORAGE =   0.71345E+07
                     CONSTANT HEAD =    70990.    
                             WELLS =   0.42703E+08
                                ET =    15507.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.28601E+06
                  DELAY IB STORAGE =    96.702    
 
                         Total OUT =   0.50210E+08
 
                          IN - OUT =   -1829.6    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  51
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.31798E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11619E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.16239E+07
                  DELAY IB STORAGE =   0.83142E+06
 
                          Total IN =   0.49490E+08
 
             OUT:
             ----
                           STORAGE =   0.66449E+07
                     CONSTANT HEAD =    70935.    
                             WELLS =   0.42703E+08
                                ET =    15466.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    58763.    
                  DELAY IB STORAGE =    144.05    
 
                         Total OUT =   0.49493E+08
 
                          IN - OUT =   -2613.1    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  51
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.30987E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11619E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15877E+07
                  DELAY IB STORAGE =   0.83464E+06
 
                          Total IN =   0.48646E+08
 
             OUT:
             ----
                           STORAGE =   0.58460E+07
                     CONSTANT HEAD =    70741.    
                             WELLS =   0.42703E+08
                                ET =    15325.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    12576.    
                  DELAY IB STORAGE =    58.689    
 
                         Total OUT =   0.48647E+08
 
                          IN - OUT =   -1209.9    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  51
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.29513E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11619E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15658E+07
                  DELAY IB STORAGE =   0.84293E+06
 
                          Total IN =   0.47158E+08
 
             OUT:
             ----
                           STORAGE =   0.43668E+07
                     CONSTANT HEAD =    70083.    
                             WELLS =   0.42703E+08
                                ET =    14827.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    5907.8    
                  DELAY IB STORAGE =    18.532    
 
                         Total OUT =   0.47160E+08
 
                          IN - OUT =   -2278.5    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  51
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.27550E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11619E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14887E+07
                  DELAY IB STORAGE =   0.86603E+06
 
                          Total IN =   0.45142E+08
 
             OUT:
             ----
                           STORAGE =   0.23567E+07
                     CONSTANT HEAD =    68080.    
                             WELLS =   0.42703E+08
                                ET =    12970.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    3004.0    
                  DELAY IB STORAGE =    25.873    
 
                         Total OUT =   0.45143E+08
 
                          IN - OUT =   -1776.8    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  52
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.30758E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11895E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.19138E+07
                  DELAY IB STORAGE =   0.86432E+06
 
                          Total IN =   0.49049E+08
 
             OUT:
             ----
                           STORAGE =   0.68949E+07
                     CONSTANT HEAD =    68076.    
                             WELLS =   0.41219E+08
                                ET =    12966.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.87149E+06
                  DELAY IB STORAGE =    100.13    
 
                         Total OUT =   0.49067E+08
 
                          IN - OUT =   -17652.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  52
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.29971E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11895E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15014E+07
                  DELAY IB STORAGE =   0.86168E+06
 
                          Total IN =   0.47847E+08
 
             OUT:
             ----
                           STORAGE =   0.62634E+07
                     CONSTANT HEAD =    68062.    
                             WELLS =   0.41219E+08
                                ET =    12952.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.28547E+06
                  DELAY IB STORAGE =    214.25    
 
                         Total OUT =   0.47849E+08
 
                          IN - OUT =   -1883.1    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  52
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.29362E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11895E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13387E+07
                  DELAY IB STORAGE =   0.85990E+06
 
                          Total IN =   0.47074E+08
 
             OUT:
             ----
                           STORAGE =   0.57116E+07
                     CONSTANT HEAD =    68011.    
                             WELLS =   0.41219E+08
                                ET =    12905.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    62848.    
                  DELAY IB STORAGE =    266.35    
 
                         Total OUT =   0.47075E+08
 
                          IN - OUT =   -1026.2    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  52
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.28490E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11895E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12901E+07
                  DELAY IB STORAGE =   0.85950E+06
 
                          Total IN =   0.46153E+08
 
             OUT:
             ----
                           STORAGE =   0.48402E+07
                     CONSTANT HEAD =    67838.    
                             WELLS =   0.41219E+08
                                ET =    12743.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    13295.    
                  DELAY IB STORAGE =    169.39    
 
                         Total OUT =   0.46153E+08
 
                          IN - OUT =   -539.66    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  52
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.26833E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11895E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12963E+07
                  DELAY IB STORAGE =   0.86119E+06
 
                          Total IN =   0.44503E+08
 
             OUT:
             ----
                           STORAGE =   0.32020E+07
                     CONSTANT HEAD =    67257.    
                             WELLS =   0.41219E+08
                                ET =    12181.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    4634.7    
                  DELAY IB STORAGE =    74.279    
 
                         Total OUT =   0.44505E+08
 
                          IN - OUT =   -1930.5    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  52
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.24886E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11895E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13324E+07
                  DELAY IB STORAGE =   0.86800E+06
 
                          Total IN =   0.42599E+08
 
             OUT:
             ----
                           STORAGE =   0.13039E+07
                     CONSTANT HEAD =    65485.    
                             WELLS =   0.41219E+08
                                ET =    10617.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1583.8    
                  DELAY IB STORAGE =    50.811    
 
                         Total OUT =   0.42601E+08
 
                          IN - OUT =   -1518.9    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  53
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.29040E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11079E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.20046E+07
                  DELAY IB STORAGE =   0.86891E+06
 
                          Total IN =   0.46610E+08
 
             OUT:
             ----
                           STORAGE =   0.72142E+07
                     CONSTANT HEAD =    65481.    
                             WELLS =   0.38634E+08
                                ET =    10614.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.70328E+06
                  DELAY IB STORAGE =    50.518    
 
                         Total OUT =   0.46628E+08
 
                          IN - OUT =   -17477.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  53
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.28591E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11079E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.15024E+07
                  DELAY IB STORAGE =   0.86867E+06
 
                          Total IN =   0.45659E+08
 
             OUT:
             ----
                           STORAGE =   0.67087E+07
                     CONSTANT HEAD =    65468.    
                             WELLS =   0.38634E+08
                                ET =    10607.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.24149E+06
                  DELAY IB STORAGE =    86.344    
 
                         Total OUT =   0.45660E+08
 
                          IN - OUT =   -1817.3    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  53
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.28114E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11079E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13263E+07
                  DELAY IB STORAGE =   0.86827E+06
 
                          Total IN =   0.45006E+08
 
             OUT:
             ----
                           STORAGE =   0.62428E+07
                     CONSTANT HEAD =    65423.    
                             WELLS =   0.38634E+08
                                ET =    10581.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    53673.    
                  DELAY IB STORAGE =    193.63    
 
                         Total OUT =   0.45007E+08
 
                          IN - OUT =   -1128.3    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  53
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.27306E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11079E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12804E+07
                  DELAY IB STORAGE =   0.86811E+06
 
                          Total IN =   0.44151E+08
 
             OUT:
             ----
                           STORAGE =   0.54310E+07
                     CONSTANT HEAD =    65274.    
                             WELLS =   0.38634E+08
                                ET =    10493.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    12618.    
                  DELAY IB STORAGE =    195.57    
 
                         Total OUT =   0.44154E+08
 
                          IN - OUT =   -2391.4    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  53
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.25672E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11079E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12558E+07
                  DELAY IB STORAGE =   0.86768E+06
 
                          Total IN =   0.42492E+08
 
             OUT:
             ----
                           STORAGE =   0.37795E+07
                     CONSTANT HEAD =    64799.    
                             WELLS =   0.38634E+08
                                ET =    10188.    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    5231.1    
                  DELAY IB STORAGE =    61.856    
 
                         Total OUT =   0.42494E+08
 
                          IN - OUT =   -1975.9    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  53
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.23542E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11079E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12297E+07
                  DELAY IB STORAGE =   0.86802E+06
 
                          Total IN =   0.40336E+08
 
             OUT:
             ----
                           STORAGE =   0.16290E+07
                     CONSTANT HEAD =    63382.    
                             WELLS =   0.38634E+08
                                ET =    9102.8    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    2163.4    
                  DELAY IB STORAGE =    69.636    
 
                         Total OUT =   0.40338E+08
 
                          IN - OUT =   -1563.5    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  54
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.26478E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10513E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.16866E+07
                  DELAY IB STORAGE =   0.86600E+06
 
                          Total IN =   0.43161E+08
 
             OUT:
             ----
                           STORAGE =   0.55988E+07
                     CONSTANT HEAD =    63379.    
                             WELLS =   0.36715E+08
                                ET =    9100.4    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.79166E+06
                  DELAY IB STORAGE =    67.192    
 
                         Total OUT =   0.43178E+08
 
                          IN - OUT =   -17323.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  54
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.25841E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10513E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13499E+07
                  DELAY IB STORAGE =   0.86220E+06
 
                          Total IN =   0.42183E+08
 
             OUT:
             ----
                           STORAGE =   0.51114E+07
                     CONSTANT HEAD =    63371.    
                             WELLS =   0.36715E+08
                                ET =    9092.2    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.28620E+06
                  DELAY IB STORAGE =    46.965    
 
                         Total OUT =   0.42185E+08
 
                          IN - OUT =   -1791.5    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  54
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.25341E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10513E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12166E+07
                  DELAY IB STORAGE =   0.85860E+06
 
                          Total IN =   0.41547E+08
 
             OUT:
             ----
                           STORAGE =   0.46937E+07
                     CONSTANT HEAD =    63341.    
                             WELLS =   0.36715E+08
                                ET =    9064.5    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    68125.    
                  DELAY IB STORAGE =    35.783    
 
                         Total OUT =   0.41549E+08
 
                          IN - OUT =   -2645.5    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  54
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.24677E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10513E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11780E+07
                  DELAY IB STORAGE =   0.85506E+06
 
                          Total IN =   0.40840E+08
 
             OUT:
             ----
                           STORAGE =   0.40401E+07
                     CONSTANT HEAD =    63242.    
                             WELLS =   0.36715E+08
                                ET =    8969.7    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    15383.    
                  DELAY IB STORAGE =    30.342    
 
                         Total OUT =   0.40843E+08
 
                          IN - OUT =   -2227.6    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  54
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.23469E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10513E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11711E+07
                  DELAY IB STORAGE =   0.84958E+06
 
                          Total IN =   0.39620E+08
 
             OUT:
             ----
                           STORAGE =   0.28301E+07
                     CONSTANT HEAD =    62915.    
                             WELLS =   0.36715E+08
                                ET =    8641.8    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    5318.3    
                  DELAY IB STORAGE =    22.830    
 
                         Total OUT =   0.39622E+08
 
                          IN - OUT =   -1713.3    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  54
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.21986E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10513E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11226E+07
                  DELAY IB STORAGE =   0.83992E+06
 
                          Total IN =   0.38079E+08
 
             OUT:
             ----
                           STORAGE =   0.12942E+07
                     CONSTANT HEAD =    61885.    
                             WELLS =   0.36715E+08
                                ET =    7467.3    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    1825.5    
                  DELAY IB STORAGE =    21.258    
 
                         Total OUT =   0.38080E+08
 
                          IN - OUT =   -1470.2    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  55
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.25059E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10777E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.17186E+07
                  DELAY IB STORAGE =   0.84134E+06
 
                          Total IN =   0.42013E+08
 
             OUT:
             ----
                           STORAGE =   0.62840E+07
                     CONSTANT HEAD =    61882.    
                             WELLS =   0.35080E+08
                                ET =    7464.7    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.59632E+06
                  DELAY IB STORAGE =    85.233    
 
                         Total OUT =   0.42030E+08
 
                          IN - OUT =   -16692.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  55
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.24725E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10777E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.12799E+07
                  DELAY IB STORAGE =   0.84374E+06
 
                          Total IN =   0.41243E+08
 
             OUT:
             ----
                           STORAGE =   0.59354E+07
                     CONSTANT HEAD =    61872.    
                             WELLS =   0.35080E+08
                                ET =    7455.9    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.15954E+06
                  DELAY IB STORAGE =    399.58    
 
                         Total OUT =   0.41245E+08
 
                          IN - OUT =   -1705.0    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  55
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.24396E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10777E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11274E+07
                  DELAY IB STORAGE =   0.84521E+06
 
                          Total IN =   0.40762E+08
 
             OUT:
             ----
                           STORAGE =   0.55796E+07
                     CONSTANT HEAD =    61840.    
                             WELLS =   0.35080E+08
                                ET =    7426.1    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    35398.    
                  DELAY IB STORAGE =    560.33    
 
                         Total OUT =   0.40765E+08
 
                          IN - OUT =   -2585.3    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  55
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.23738E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10777E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10791E+07
                  DELAY IB STORAGE =   0.84422E+06
 
                          Total IN =   0.40055E+08
 
             OUT:
             ----
                           STORAGE =   0.48963E+07
                     CONSTANT HEAD =    61729.    
                             WELLS =   0.35080E+08
                                ET =    7324.2    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    11709.    
                  DELAY IB STORAGE =    388.79    
 
                         Total OUT =   0.40058E+08
 
                          IN - OUT =   -2214.5    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  55
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.22418E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10777E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10354E+07
                  DELAY IB STORAGE =   0.83870E+06
 
                          Total IN =   0.38686E+08
 
             OUT:
             ----
                           STORAGE =   0.35333E+07
                     CONSTANT HEAD =    61356.    
                             WELLS =   0.35080E+08
                                ET =    6974.7    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    5727.9    
                  DELAY IB STORAGE =    112.82    
 
                         Total OUT =   0.38688E+08
 
                          IN - OUT =   -1752.2    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  55
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.20721E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10777E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10259E+07
                  DELAY IB STORAGE =   0.82218E+06
 
                          Total IN =   0.36963E+08
 
             OUT:
             ----
                           STORAGE =   0.18157E+07
                     CONSTANT HEAD =    60151.    
                             WELLS =   0.35080E+08
                                ET =    5751.6    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    2847.8    
                  DELAY IB STORAGE =    7.5343    
 
                         Total OUT =   0.36965E+08
 
                          IN - OUT =   -1417.3    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  56
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.23312E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10221E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.14941E+07
                  DELAY IB STORAGE =   0.82056E+06
 
                          Total IN =   0.39465E+08
 
             OUT:
             ----
                           STORAGE =   0.64343E+07
                     CONSTANT HEAD =    60149.    
                             WELLS =   0.32234E+08
                                ET =    5748.9    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.74722E+06
                  DELAY IB STORAGE =    10.352    
 
                         Total OUT =   0.39481E+08
 
                          IN - OUT =   -16118.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  56
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.22774E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10221E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11561E+07
                  DELAY IB STORAGE =   0.81726E+06
 
                          Total IN =   0.38586E+08
 
             OUT:
             ----
                           STORAGE =   0.60159E+07
                     CONSTANT HEAD =    60141.    
                             WELLS =   0.32234E+08
                                ET =    5739.7    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.27166E+06
                  DELAY IB STORAGE =    61.228    
 
                         Total OUT =   0.38587E+08
 
                          IN - OUT =   -1649.6    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  56
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.22332E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10221E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10233E+07
                  DELAY IB STORAGE =   0.81388E+06
 
                          Total IN =   0.38008E+08
 
             OUT:
             ----
                           STORAGE =   0.56425E+07
                     CONSTANT HEAD =    60113.    
                             WELLS =   0.32234E+08
                                ET =    5708.6    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    68421.    
                  DELAY IB STORAGE =    156.45    
 
                         Total OUT =   0.38011E+08
 
                          IN - OUT =   -2495.3    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  56
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.21726E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10221E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.98827E+06
                  DELAY IB STORAGE =   0.80988E+06
 
                          Total IN =   0.37363E+08
 
             OUT:
             ----
                           STORAGE =   0.50469E+07
                     CONSTANT HEAD =    60020.    
                             WELLS =   0.32234E+08
                                ET =    5602.4    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    18499.    
                  DELAY IB STORAGE =    95.490    
 
                         Total OUT =   0.37365E+08
 
                          IN - OUT =   -2002.0    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  56
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.20548E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10221E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.99637E+06
                  DELAY IB STORAGE =   0.80123E+06
 
                          Total IN =   0.36184E+08
 
             OUT:
             ----
                           STORAGE =   0.38794E+07
                     CONSTANT HEAD =    59706.    
                             WELLS =   0.32234E+08
                                ET =    5238.7    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7527.0    
                  DELAY IB STORAGE =    108.55    
 
                         Total OUT =   0.36186E+08
 
                          IN - OUT =   -1530.3    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  56
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.18918E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10221E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.96447E+06
                  DELAY IB STORAGE =   0.78101E+06
 
                          Total IN =   0.34502E+08
 
             OUT:
             ----
                           STORAGE =   0.22035E+07
                     CONSTANT HEAD =    58675.    
                             WELLS =   0.32234E+08
                                ET =    4213.0    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    3310.1    
                  DELAY IB STORAGE =    62.172    
 
                         Total OUT =   0.34503E+08
 
                          IN - OUT =   -1388.7    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  57
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.20712E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.99700E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11895E+07
                  DELAY IB STORAGE =   0.77903E+06
 
                          Total IN =   0.36268E+08
 
             OUT:
             ----
                           STORAGE =   0.59211E+07
                     CONSTANT HEAD =    58672.    
                             WELLS =   0.29767E+08
                                ET =    4211.5    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.53183E+06
                  DELAY IB STORAGE =    298.32    
 
                         Total OUT =   0.36283E+08
 
                          IN - OUT =   -15205.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  57
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.20409E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.99700E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.10362E+07
                  DELAY IB STORAGE =   0.77455E+06
 
                          Total IN =   0.35807E+08
 
             OUT:
             ----
                           STORAGE =   0.57218E+07
                     CONSTANT HEAD =    58664.    
                             WELLS =   0.29767E+08
                                ET =    4206.1    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.25551E+06
                  DELAY IB STORAGE =    1417.3    
 
                         Total OUT =   0.35808E+08
 
                          IN - OUT =   -1531.5    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  57
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.20059E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.99700E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.98289E+06
                  DELAY IB STORAGE =   0.76934E+06
 
                          Total IN =   0.35399E+08
 
             OUT:
             ----
                           STORAGE =   0.54844E+07
                     CONSTANT HEAD =    58635.    
                             WELLS =   0.29767E+08
                                ET =    4187.9    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    84586.    
                  DELAY IB STORAGE =    2298.7    
 
                         Total OUT =   0.35401E+08
 
                          IN - OUT =   -2076.3    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  57
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.19564E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.99700E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.95968E+06
                  DELAY IB STORAGE =   0.76420E+06
 
                          Total IN =   0.34875E+08
 
             OUT:
             ----
                           STORAGE =   0.50222E+07
                     CONSTANT HEAD =    58539.    
                             WELLS =   0.29767E+08
                                ET =    4126.0    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    23546.    
                  DELAY IB STORAGE =    1691.1    
 
                         Total OUT =   0.34877E+08
 
                          IN - OUT =   -1529.1    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  57
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.18673E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.99700E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.92610E+06
                  DELAY IB STORAGE =   0.75430E+06
 
                          Total IN =   0.33941E+08
 
             OUT:
             ----
                           STORAGE =   0.41033E+07
                     CONSTANT HEAD =    58219.    
                             WELLS =   0.29767E+08
                                ET =    3914.2    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    9541.5    
                  DELAY IB STORAGE =    699.47    
 
                         Total OUT =   0.33942E+08
 
                          IN - OUT =   -1081.9    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  57
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.17335E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.99700E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.90028E+06
                  DELAY IB STORAGE =   0.73159E+06
 
                          Total IN =   0.32554E+08
 
             OUT:
             ----
                           STORAGE =   0.27234E+07
                     CONSTANT HEAD =    57181.    
                             WELLS =   0.29767E+08
                                ET =    3203.2    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    4516.4    
                  DELAY IB STORAGE =    219.85    
 
                         Total OUT =   0.32555E+08
 
                          IN - OUT =   -1193.4    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  58
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.22495E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10183E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.16354E+07
                  DELAY IB STORAGE =   0.73112E+06
 
                          Total IN =   0.38662E+08
 
             OUT:
             ----
                           STORAGE =   0.10977E+08
                     CONSTANT HEAD =    57179.    
                             WELLS =   0.26796E+08
                                ET =    3201.7    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.84240E+06
                  DELAY IB STORAGE =    518.93    
 
                         Total OUT =   0.38676E+08
 
                          IN - OUT =   -14099.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  58
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.22046E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10183E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.11645E+07
                  DELAY IB STORAGE =   0.72851E+06
 
                          Total IN =   0.37739E+08
 
             OUT:
             ----
                           STORAGE =   0.10572E+08
                     CONSTANT HEAD =    57171.    
                             WELLS =   0.26796E+08
                                ET =    3196.4    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.31200E+06
                  DELAY IB STORAGE =    727.44    
 
                         Total OUT =   0.37740E+08
 
                          IN - OUT =   -1403.1    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  58
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.21526E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10183E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.98409E+06
                  DELAY IB STORAGE =   0.72473E+06
 
                          Total IN =   0.37035E+08
 
             OUT:
             ----
                           STORAGE =   0.10103E+08
                     CONSTANT HEAD =    57145.    
                             WELLS =   0.26796E+08
                                ET =    3178.3    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    78198.    
                  DELAY IB STORAGE =    500.73    
 
                         Total OUT =   0.37037E+08
 
                          IN - OUT =   -2194.4    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  58
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.20594E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10183E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.95018E+06
                  DELAY IB STORAGE =   0.71900E+06
 
                          Total IN =   0.36063E+08
 
             OUT:
             ----
                           STORAGE =   0.91853E+07
                     CONSTANT HEAD =    57059.    
                             WELLS =   0.26796E+08
                                ET =    3116.9    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    23711.    
                  DELAY IB STORAGE =    228.68    
 
                         Total OUT =   0.36065E+08
 
                          IN - OUT =   -1629.4    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  58
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.18835E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10183E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.93112E+06
                  DELAY IB STORAGE =   0.70600E+06
 
                          Total IN =   0.34272E+08
 
             OUT:
             ----
                           STORAGE =   0.74053E+07
                     CONSTANT HEAD =    56771.    
                             WELLS =   0.26796E+08
                                ET =    2907.1    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    13074.    
                  DELAY IB STORAGE =    144.29    
 
                         Total OUT =   0.34274E+08
 
                          IN - OUT =   -1213.7    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  58
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16599E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10183E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.83187E+06
                  DELAY IB STORAGE =   0.67523E+06
 
                          Total IN =   0.31906E+08
 
             OUT:
             ----
                           STORAGE =   0.50451E+07
                     CONSTANT HEAD =    55827.    
                             WELLS =   0.26796E+08
                                ET =    2237.8    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    8233.2    
                  DELAY IB STORAGE =    163.57    
 
                         Total OUT =   0.31907E+08
 
                          IN - OUT =   -632.61    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  59
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.18894E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11368E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13644E+07
                  DELAY IB STORAGE =   0.67594E+06
 
                          Total IN =   0.35919E+08
 
             OUT:
             ----
                           STORAGE =   0.98226E+07
                     CONSTANT HEAD =    55825.    
                             WELLS =   0.25341E+08
                                ET =    2236.8    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.70956E+06
                  DELAY IB STORAGE =    710.90    
 
                         Total OUT =   0.35932E+08
 
                          IN - OUT =   -12947.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  59
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.18373E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11368E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.92185E+06
                  DELAY IB STORAGE =   0.67710E+06
 
                          Total IN =   0.34958E+08
 
             OUT:
             ----
                           STORAGE =   0.93334E+07
                     CONSTANT HEAD =    55818.    
                             WELLS =   0.25341E+08
                                ET =    2233.6    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.22771E+06
                  DELAY IB STORAGE =    1475.2    
 
                         Total OUT =   0.34962E+08
 
                          IN - OUT =   -4245.2    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  59
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.17979E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11368E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.72760E+06
                  DELAY IB STORAGE =   0.67756E+06
 
                          Total IN =   0.34369E+08
 
             OUT:
             ----
                           STORAGE =   0.89097E+07
                     CONSTANT HEAD =    55792.    
                             WELLS =   0.25341E+08
                                ET =    2222.5    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    59948.    
                  DELAY IB STORAGE =    1999.2    
 
                         Total OUT =   0.34371E+08
 
                          IN - OUT =   -2019.7    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  59
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.17236E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11368E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.66863E+06
                  DELAY IB STORAGE =   0.67420E+06
 
                          Total IN =   0.33564E+08
 
             OUT:
             ----
                           STORAGE =   0.81440E+07
                     CONSTANT HEAD =    55703.    
                             WELLS =   0.25341E+08
                                ET =    2184.6    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    20756.    
                  DELAY IB STORAGE =    1435.5    
 
                         Total OUT =   0.33565E+08
 
                          IN - OUT =   -1528.0    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  59
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.15757E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11368E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.64034E+06
                  DELAY IB STORAGE =   0.66185E+06
 
                          Total IN =   0.32045E+08
 
             OUT:
             ----
                           STORAGE =   0.66345E+07
                     CONSTANT HEAD =    55408.    
                             WELLS =   0.25341E+08
                                ET =    2054.8    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    11861.    
                  DELAY IB STORAGE =    617.14    
 
                         Total OUT =   0.32046E+08
 
                          IN - OUT =   -1078.9    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  59
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13688E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11368E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.62052E+06
                  DELAY IB STORAGE =   0.62695E+06
 
                          Total IN =   0.29921E+08
 
             OUT:
             ----
                           STORAGE =   0.45161E+07
                     CONSTANT HEAD =    54414.    
                             WELLS =   0.25341E+08
                                ET =    1599.8    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7315.9    
                  DELAY IB STORAGE =    297.87    
 
                         Total OUT =   0.29921E+08
 
                          IN - OUT =    3.8165    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  60
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.14024E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12027E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.69640E+06
                  DELAY IB STORAGE =   0.62673E+06
 
                          Total IN =   0.30992E+08
 
             OUT:
             ----
                           STORAGE =   0.72311E+07
                     CONSTANT HEAD =    54411.    
                             WELLS =   0.23526E+08
                                ET =    1598.8    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.19067E+06
                  DELAY IB STORAGE =    297.48    
 
                         Total OUT =   0.31004E+08
 
                          IN - OUT =   -11911.    
 
               Percent Discrepancy =               -0.04
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  60
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13878E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12027E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.62732E+06
                  DELAY IB STORAGE =   0.62592E+06
 
                          Total IN =   0.30776E+08
 
             OUT:
             ----
                           STORAGE =   0.71304E+07
                     CONSTANT HEAD =    54404.    
                             WELLS =   0.23526E+08
                                ET =    1595.4    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    66931.    
                  DELAY IB STORAGE =    265.94    
 
                         Total OUT =   0.30780E+08
 
                          IN - OUT =   -3886.0    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  60
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13705E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12027E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.58806E+06
                  DELAY IB STORAGE =   0.62447E+06
 
                          Total IN =   0.30563E+08
 
             OUT:
             ----
                           STORAGE =   0.69630E+07
                     CONSTANT HEAD =    54377.    
                             WELLS =   0.23526E+08
                                ET =    1583.8    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    19492.    
                  DELAY IB STORAGE =    250.79    
 
                         Total OUT =   0.30565E+08
 
                          IN - OUT =   -1883.8    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  60
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13318E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.12027E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.57237E+06
                  DELAY IB STORAGE =   0.61988E+06
 
                          Total IN =   0.30155E+08
 
             OUT:
             ----
                           STORAGE =   0.65638E+07
                     CONSTANT HEAD =    54289.    
                             WELLS =   0.23526E+08
                                ET =    1544.3    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    11093.    
                  DELAY IB STORAGE =    251.99    
 
                         Total OUT =   0.30157E+08
 
                          IN - OUT =   -1489.0    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  60
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12087E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11857E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.53179E+06
                  DELAY IB STORAGE =   0.59737E+06
 
                          Total IN =   0.28690E+08
 
             OUT:
             ----
                           STORAGE =   0.59035E+07
                     CONSTANT HEAD =    53989.    
                             WELLS =   0.22719E+08
                                ET =    1408.9    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    11630.    
                  DELAY IB STORAGE =    260.09    
 
                         Total OUT =   0.28690E+08
 
                          IN - OUT =   -41.644    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  60
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.10669E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11857E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.48947E+06
                  DELAY IB STORAGE =   0.55685E+06
 
                          Total IN =   0.27189E+08
 
             OUT:
             ----
                           STORAGE =   0.44093E+07
                     CONSTANT HEAD =    52974.    
                             WELLS =   0.22719E+08
                                ET =    937.67    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7351.3    
                  DELAY IB STORAGE =    329.49    
 
                         Total OUT =   0.27190E+08
 
                          IN - OUT =   -1093.2    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  61
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.15293E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11428E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.74530E+06
                  DELAY IB STORAGE =   0.55448E+06
 
                          Total IN =   0.31638E+08
 
             OUT:
             ----
                           STORAGE =   0.88559E+07
                     CONSTANT HEAD =    52970.    
                             WELLS =   0.22197E+08
                                ET =    936.63    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.54174E+06
                  DELAY IB STORAGE =    354.03    
 
                         Total OUT =   0.31649E+08
 
                          IN - OUT =   -10621.    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  61
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.14954E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11428E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.59548E+06
                  DELAY IB STORAGE =   0.54933E+06
 
                          Total IN =   0.31145E+08
 
             OUT:
             ----
                           STORAGE =   0.86530E+07
                     CONSTANT HEAD =    52959.    
                             WELLS =   0.22197E+08
                                ET =    933.10    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.24419E+06
                  DELAY IB STORAGE =    386.41    
 
                         Total OUT =   0.31149E+08
 
                          IN - OUT =   -3559.0    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  61
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.14562E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11428E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.53402E+06
                  DELAY IB STORAGE =   0.54352E+06
 
                          Total IN =   0.30686E+08
 
             OUT:
             ----
                           STORAGE =   0.83657E+07
                     CONSTANT HEAD =    52918.    
                             WELLS =   0.22197E+08
                                ET =    921.10    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    70305.    
                  DELAY IB STORAGE =    341.04    
 
                         Total OUT =   0.30687E+08
 
                          IN - OUT =   -1834.3    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  61
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13889E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11428E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.50621E+06
                  DELAY IB STORAGE =   0.53647E+06
 
                          Total IN =   0.29977E+08
 
             OUT:
             ----
                           STORAGE =   0.77061E+07
                     CONSTANT HEAD =    52782.    
                             WELLS =   0.22197E+08
                                ET =    880.24    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    21481.    
                  DELAY IB STORAGE =    283.99    
 
                         Total OUT =   0.29979E+08
 
                          IN - OUT =   -1367.6    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  61
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12697E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11428E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.47715E+06
                  DELAY IB STORAGE =   0.52065E+06
 
                          Total IN =   0.28741E+08
 
             OUT:
             ----
                           STORAGE =   0.64789E+07
                     CONSTANT HEAD =    52324.    
                             WELLS =   0.22197E+08
                                ET =    740.58    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    12245.    
                  DELAY IB STORAGE =    273.22    
 
                         Total OUT =   0.28742E+08
 
                          IN - OUT =   -956.80    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  61
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.11067E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.11428E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.42495E+06
                  DELAY IB STORAGE =   0.48372E+06
 
                          Total IN =   0.27022E+08
 
             OUT:
             ----
                           STORAGE =   0.47658E+07
                     CONSTANT HEAD =    50789.    
                             WELLS =   0.22197E+08
                                ET =    260.37    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    8385.1    
                  DELAY IB STORAGE =    272.97    
 
                         Total OUT =   0.27023E+08
 
                          IN - OUT =   -924.21    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  62
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12644E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10963E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.80766E+06
                  DELAY IB STORAGE =   0.48474E+06
 
                          Total IN =   0.28516E+08
 
             OUT:
             ----
                           STORAGE =   0.84006E+07
                     CONSTANT HEAD =    50788.    
                             WELLS =   0.19717E+08
                                ET =    259.32    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.35548E+06
                  DELAY IB STORAGE =    622.45    
 
                         Total OUT =   0.28525E+08
 
                          IN - OUT =   -9094.6    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  62
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12462E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10963E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.58896E+06
                  DELAY IB STORAGE =   0.48600E+06
 
                          Total IN =   0.28117E+08
 
             OUT:
             ----
                           STORAGE =   0.82070E+07
                     CONSTANT HEAD =    50786.    
                             WELLS =   0.19717E+08
                                ET =    255.71    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.14335E+06
                  DELAY IB STORAGE =    1254.0    
 
                         Total OUT =   0.28120E+08
 
                          IN - OUT =   -3045.2    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  62
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12281E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10963E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.46288E+06
                  DELAY IB STORAGE =   0.48583E+06
 
                          Total IN =   0.27810E+08
 
             OUT:
             ----
                           STORAGE =   0.79980E+07
                     CONSTANT HEAD =    50781.    
                             WELLS =   0.19717E+08
                                ET =    243.46    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    43752.    
                  DELAY IB STORAGE =    1643.1    
 
                         Total OUT =   0.27812E+08
 
                          IN - OUT =   -1604.2    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  62
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.11840E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10963E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.42519E+06
                  DELAY IB STORAGE =   0.48288E+06
 
                          Total IN =   0.27328E+08
 
             OUT:
             ----
                           STORAGE =   0.75419E+07
                     CONSTANT HEAD =    50771.    
                             WELLS =   0.19717E+08
                                ET =    219.75    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    17789.    
                  DELAY IB STORAGE =    1279.8    
 
                         Total OUT =   0.27329E+08
 
                          IN - OUT =   -1199.4    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  62
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.10936E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10963E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.41175E+06
                  DELAY IB STORAGE =   0.47180E+06
 
                          Total IN =   0.26400E+08
 
             OUT:
             ----
                           STORAGE =   0.66193E+07
                     CONSTANT HEAD =    50773.    
                             WELLS =   0.19717E+08
                                ET =    157.53    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    12426.    
                  DELAY IB STORAGE =    795.17    
 
                         Total OUT =   0.26401E+08
 
                          IN - OUT =   -869.32    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  62
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.95905E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10963E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.39677E+06
                  DELAY IB STORAGE =   0.44013E+06
 
                          Total IN =   0.25008E+08
 
             OUT:
             ----
                           STORAGE =   0.52300E+07
                     CONSTANT HEAD =    50856.    
                             WELLS =   0.19717E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    9641.9    
                  DELAY IB STORAGE =    661.16    
 
                         Total OUT =   0.25009E+08
 
                          IN - OUT =   -1001.0    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  63
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13610E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10284E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.80035E+06
                  DELAY IB STORAGE =   0.44160E+06
 
                          Total IN =   0.28754E+08
 
             OUT:
             ----
                           STORAGE =   0.60125E+07
                     CONSTANT HEAD =    50856.    
                             WELLS =   0.22541E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.15754E+06
                  DELAY IB STORAGE =    606.44    
 
                         Total OUT =   0.28762E+08
 
                          IN - OUT =   -8382.4    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  63
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13420E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10284E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.61046E+06
                  DELAY IB STORAGE =   0.44257E+06
 
                          Total IN =   0.28375E+08
 
             OUT:
             ----
                           STORAGE =   0.57144E+07
                     CONSTANT HEAD =    50852.    
                             WELLS =   0.22541E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    71244.    
                  DELAY IB STORAGE =    565.54    
 
                         Total OUT =   0.28378E+08
 
                          IN - OUT =   -2764.6    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  63
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13231E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10284E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.51597E+06
                  DELAY IB STORAGE =   0.44208E+06
 
                          Total IN =   0.28090E+08
 
             OUT:
             ----
                           STORAGE =   0.54765E+07
                     CONSTANT HEAD =    50842.    
                             WELLS =   0.22541E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    23081.    
                  DELAY IB STORAGE =    541.71    
 
                         Total OUT =   0.28091E+08
 
                          IN - OUT =   -1348.9    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  63
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12897E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10284E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.49120E+06
                  DELAY IB STORAGE =   0.44006E+06
 
                          Total IN =   0.27729E+08
 
             OUT:
             ----
                           STORAGE =   0.51283E+07
                     CONSTANT HEAD =    50811.    
                             WELLS =   0.22541E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    10078.    
                  DELAY IB STORAGE =    557.76    
 
                         Total OUT =   0.27730E+08
 
                          IN - OUT =   -1186.1    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  63
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12212E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10284E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.48109E+06
                  DELAY IB STORAGE =   0.43553E+06
 
                          Total IN =   0.27030E+08
 
             OUT:
             ----
                           STORAGE =   0.44319E+07
                     CONSTANT HEAD =    50714.    
                             WELLS =   0.22541E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7634.4    
                  DELAY IB STORAGE =    614.93    
 
                         Total OUT =   0.27031E+08
 
                          IN - OUT =   -1693.9    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  63
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.11234E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.10284E+08
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.46809E+06
                  DELAY IB STORAGE =   0.42326E+06
 
                          Total IN =   0.26027E+08
 
             OUT:
             ----
                           STORAGE =   0.34305E+07
                     CONSTANT HEAD =    50335.    
                             WELLS =   0.22541E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    6079.7    
                  DELAY IB STORAGE =    622.47    
 
                         Total OUT =   0.26028E+08
 
                          IN - OUT =   -1070.1    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  64
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.15157E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.97389E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.93866E+06
                  DELAY IB STORAGE =   0.42495E+06
 
                          Total IN =   0.29877E+08
 
             OUT:
             ----
                           STORAGE =   0.74335E+07
                     CONSTANT HEAD =    50334.    
                             WELLS =   0.22082E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.31904E+06
                  DELAY IB STORAGE =    624.93    
 
                         Total OUT =   0.29885E+08
 
                          IN - OUT =   -8233.7    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  64
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.14972E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.97389E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.65669E+06
                  DELAY IB STORAGE =   0.42725E+06
 
                          Total IN =   0.29412E+08
 
             OUT:
             ----
                           STORAGE =   0.71775E+07
                     CONSTANT HEAD =    50330.    
                             WELLS =   0.22082E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.10428E+06
                  DELAY IB STORAGE =    642.31    
 
                         Total OUT =   0.29415E+08
 
                          IN - OUT =   -2687.3    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  64
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.14765E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.97389E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.52823E+06
                  DELAY IB STORAGE =   0.42971E+06
 
                          Total IN =   0.29080E+08
 
             OUT:
             ----
                           STORAGE =   0.69266E+07
                     CONSTANT HEAD =    50316.    
                             WELLS =   0.22082E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    21834.    
                  DELAY IB STORAGE =    633.82    
 
                         Total OUT =   0.29081E+08
 
                          IN - OUT =   -1335.7    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  64
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.14346E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.97389E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.49029E+06
                  DELAY IB STORAGE =   0.43018E+06
 
                          Total IN =   0.28623E+08
 
             OUT:
             ----
                           STORAGE =   0.64809E+07
                     CONSTANT HEAD =    50266.    
                             WELLS =   0.22082E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    10793.    
                  DELAY IB STORAGE =    584.15    
 
                         Total OUT =   0.28624E+08
 
                          IN - OUT =   -1150.4    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  64
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13466E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.97389E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.48545E+06
                  DELAY IB STORAGE =   0.42762E+06
 
                          Total IN =   0.27736E+08
 
             OUT:
             ----
                           STORAGE =   0.55954E+07
                     CONSTANT HEAD =    50077.    
                             WELLS =   0.22082E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    9025.4    
                  DELAY IB STORAGE =    557.02    
 
                         Total OUT =   0.27737E+08
 
                          IN - OUT =   -979.52    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  64
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12029E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.97389E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.50554E+06
                  DELAY IB STORAGE =   0.42005E+06
 
                          Total IN =   0.26311E+08
 
             OUT:
             ----
                           STORAGE =   0.41731E+07
                     CONSTANT HEAD =    49342.    
                             WELLS =   0.22082E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    6921.0    
                  DELAY IB STORAGE =    547.24    
 
                         Total OUT =   0.26312E+08
 
                          IN - OUT =   -1145.8    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  65
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.17391E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.89589E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.13907E+07
                  DELAY IB STORAGE =   0.42049E+06
 
                          Total IN =   0.31778E+08
 
             OUT:
             ----
                           STORAGE =   0.11770E+08
                     CONSTANT HEAD =    49341.    
                             WELLS =   0.18969E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.99167E+06
                  DELAY IB STORAGE =    964.69    
 
                         Total OUT =   0.31780E+08
 
                          IN - OUT =   -2402.3    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  65
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16735E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.89589E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.82293E+06
                  DELAY IB STORAGE =   0.42189E+06
 
                          Total IN =   0.30556E+08
 
             OUT:
             ----
                           STORAGE =   0.11190E+08
                     CONSTANT HEAD =    49338.    
                             WELLS =   0.18969E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.34684E+06
                  DELAY IB STORAGE =    1693.6    
 
                         Total OUT =   0.30557E+08
 
                          IN - OUT =   -822.76    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  65
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.16198E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.89589E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.54965E+06
                  DELAY IB STORAGE =   0.42385E+06
 
                          Total IN =   0.29748E+08
 
             OUT:
             ----
                           STORAGE =   0.10654E+08
                     CONSTANT HEAD =    49329.    
                             WELLS =   0.18969E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    74317.    
                  DELAY IB STORAGE =    1899.4    
 
                         Total OUT =   0.29749E+08
 
                          IN - OUT =   -1382.2    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  65
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.15416E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.89589E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.50802E+06
                  DELAY IB STORAGE =   0.42398E+06
 
                          Total IN =   0.28924E+08
 
             OUT:
             ----
                           STORAGE =   0.98840E+07
                     CONSTANT HEAD =    49304.    
                             WELLS =   0.18969E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    22038.    
                  DELAY IB STORAGE =    1269.3    
 
                         Total OUT =   0.28926E+08
 
                          IN - OUT =   -1264.7    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  65
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13922E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.89589E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.55160E+06
                  DELAY IB STORAGE =   0.42097E+06
 
                          Total IN =   0.27471E+08
 
             OUT:
             ----
                           STORAGE =   0.84389E+07
                     CONSTANT HEAD =    49247.    
                             WELLS =   0.18969E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    14296.    
                  DELAY IB STORAGE =    1059.8    
 
                         Total OUT =   0.27472E+08
 
                          IN - OUT =   -1217.0    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  65
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.10584E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.89312E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.45099E+06
                  DELAY IB STORAGE =   0.40117E+06
 
                          Total IN =   0.23985E+08
 
             OUT:
             ----
                           STORAGE =   0.63142E+07
                     CONSTANT HEAD =    49029.    
                             WELLS =   0.17610E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    10362.    
                  DELAY IB STORAGE =    960.02    
 
                         Total OUT =   0.23985E+08
 
                          IN - OUT =    72.117    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  66
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.14437E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.80883E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.88216E+06
                  DELAY IB STORAGE =   0.39704E+06
 
                          Total IN =   0.27422E+08
 
             OUT:
             ----
                           STORAGE =   0.90698E+07
                     CONSTANT HEAD =    49028.    
                             WELLS =   0.17247E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.10625E+07
                  DELAY IB STORAGE =    1134.7    
 
                         Total OUT =   0.27429E+08
 
                          IN - OUT =   -7800.8    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  66
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13669E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.80883E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.49622E+06
                  DELAY IB STORAGE =   0.38826E+06
 
                          Total IN =   0.26259E+08
 
             OUT:
             ----
                           STORAGE =   0.85055E+07
                     CONSTANT HEAD =    49027.    
                             WELLS =   0.17247E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.45674E+06
                  DELAY IB STORAGE =    1705.8    
 
                         Total OUT =   0.26260E+08
 
                          IN - OUT =   -848.98    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  66
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.13099E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.80883E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.38261E+06
                  DELAY IB STORAGE =   0.37989E+06
 
                          Total IN =   0.25567E+08
 
             OUT:
             ----
                           STORAGE =   0.81477E+07
                     CONSTANT HEAD =    49022.    
                             WELLS =   0.17247E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.12247E+06
                  DELAY IB STORAGE =    2142.0    
 
                         Total OUT =   0.25568E+08
 
                          IN - OUT =   -1453.9    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  66
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.12456E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.80883E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.35659E+06
                  DELAY IB STORAGE =   0.37405E+06
 
                          Total IN =   0.24893E+08
 
             OUT:
             ----
                           STORAGE =   0.75666E+07
                     CONSTANT HEAD =    49008.    
                             WELLS =   0.17247E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    29315.    
                  DELAY IB STORAGE =    1791.4    
 
                         Total OUT =   0.24894E+08
 
                          IN - OUT =   -1008.8    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  66
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.11356E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.80883E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.34448E+06
                  DELAY IB STORAGE =   0.36661E+06
 
                          Total IN =   0.23772E+08
 
             OUT:
             ----
                           STORAGE =   0.64634E+07
                     CONSTANT HEAD =    48971.    
                             WELLS =   0.17247E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    13264.    
                  DELAY IB STORAGE =    1261.8    
 
                         Total OUT =   0.23774E+08
 
                          IN - OUT =   -1497.4    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  66
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.99723E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.80883E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.38657E+06
                  DELAY IB STORAGE =   0.35415E+06
 
                          Total IN =   0.22419E+08
 
             OUT:
             ----
                           STORAGE =   0.51144E+07
                     CONSTANT HEAD =    48788.    
                             WELLS =   0.17247E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    8605.9    
                  DELAY IB STORAGE =    1006.0    
 
                         Total OUT =   0.22420E+08
 
                          IN - OUT =   -988.42    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  67
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.10011E+08
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.72305E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.47086E+06
                  DELAY IB STORAGE =   0.35252E+06
 
                          Total IN =   0.21683E+08
 
             OUT:
             ----
                           STORAGE =   0.79303E+07
                     CONSTANT HEAD =    48787.    
                             WELLS =   0.13311E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.39826E+06
                  DELAY IB STORAGE =    1437.7    
 
                         Total OUT =   0.21689E+08
 
                          IN - OUT =   -6614.3    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  67
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.97341E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.72305E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.41222E+06
                  DELAY IB STORAGE =   0.34964E+06
 
                          Total IN =   0.21344E+08
 
             OUT:
             ----
                           STORAGE =   0.77971E+07
                     CONSTANT HEAD =    48785.    
                             WELLS =   0.13311E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.18737E+06
                  DELAY IB STORAGE =    2403.4    
 
                         Total OUT =   0.21346E+08
 
                          IN - OUT =   -2203.3    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  67
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.94538E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.72305E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.37552E+06
                  DELAY IB STORAGE =   0.34713E+06
 
                          Total IN =   0.21025E+08
 
             OUT:
             ----
                           STORAGE =   0.76046E+07
                     CONSTANT HEAD =    48775.    
                             WELLS =   0.13311E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    58517.    
                  DELAY IB STORAGE =    3132.9    
 
                         Total OUT =   0.21026E+08
 
                          IN - OUT =   -1092.7    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  67
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.90501E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.72305E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.35641E+06
                  DELAY IB STORAGE =   0.34317E+06
 
                          Total IN =   0.20598E+08
 
             OUT:
             ----
                           STORAGE =   0.72161E+07
                     CONSTANT HEAD =    48736.    
                             WELLS =   0.13311E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    20649.    
                  DELAY IB STORAGE =    2452.2    
 
                         Total OUT =   0.20599E+08
 
                          IN - OUT =   -868.17    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  67
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.82845E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.72305E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.33386E+06
                  DELAY IB STORAGE =   0.33442E+06
 
                          Total IN =   0.19801E+08
 
             OUT:
             ----
                           STORAGE =   0.64285E+07
                     CONSTANT HEAD =    48571.    
                             WELLS =   0.13311E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    12678.    
                  DELAY IB STORAGE =    1587.8    
 
                         Total OUT =   0.19802E+08
 
                          IN - OUT =   -1136.9    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  67
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.71348E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.72305E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.29644E+06
                  DELAY IB STORAGE =   0.31237E+06
 
                          Total IN =   0.18592E+08
 
             OUT:
             ----
                           STORAGE =   0.52235E+07
                     CONSTANT HEAD =    47929.    
                             WELLS =   0.13311E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    9274.0    
                  DELAY IB STORAGE =    1161.3    
 
                         Total OUT =   0.18592E+08
 
                          IN - OUT =   -824.59    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  68
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.97112E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.60226E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.35928E+06
                  DELAY IB STORAGE =   0.31152E+06
 
                          Total IN =   0.20022E+08
 
             OUT:
             ----
                           STORAGE =   0.74449E+07
                     CONSTANT HEAD =    47928.    
                             WELLS =   0.12273E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.26018E+06
                  DELAY IB STORAGE =    1539.2    
 
                         Total OUT =   0.20028E+08
 
                          IN - OUT =   -5816.7    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  68
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.95728E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.60226E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.31373E+06
                  DELAY IB STORAGE =   0.30951E+06
 
                          Total IN =   0.19836E+08
 
             OUT:
             ----
                           STORAGE =   0.73964E+07
                     CONSTANT HEAD =    47925.    
                             WELLS =   0.12273E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.11836E+06
                  DELAY IB STORAGE =    1980.4    
 
                         Total OUT =   0.19838E+08
 
                          IN - OUT =   -1938.1    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  68
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.93788E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.60226E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.29868E+06
                  DELAY IB STORAGE =   0.30778E+06
 
                          Total IN =   0.19625E+08
 
             OUT:
             ----
                           STORAGE =   0.72660E+07
                     CONSTANT HEAD =    47916.    
                             WELLS =   0.12273E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    36986.    
                  DELAY IB STORAGE =    2097.0    
 
                         Total OUT =   0.19626E+08
 
                          IN - OUT =   -947.92    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  68
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.90019E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.60226E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.29172E+06
                  DELAY IB STORAGE =   0.30556E+06
 
                          Total IN =   0.19239E+08
 
             OUT:
             ----
                           STORAGE =   0.69017E+07
                     CONSTANT HEAD =    47886.    
                             WELLS =   0.12273E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    15363.    
                  DELAY IB STORAGE =    1747.6    
 
                         Total OUT =   0.19240E+08
 
                          IN - OUT =   -781.04    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  68
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.82648E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.60226E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.28284E+06
                  DELAY IB STORAGE =   0.29918E+06
 
                          Total IN =   0.18487E+08
 
             OUT:
             ----
                           STORAGE =   0.61545E+07
                     CONSTANT HEAD =    47798.    
                             WELLS =   0.12273E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    10997.    
                  DELAY IB STORAGE =    1369.5    
 
                         Total OUT =   0.18488E+08
 
                          IN - OUT =   -1092.8    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  68
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.71691E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.60226E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.26382E+06
                  DELAY IB STORAGE =   0.28171E+06
 
                          Total IN =   0.17355E+08
 
             OUT:
             ----
                           STORAGE =   0.50250E+07
                     CONSTANT HEAD =    47515.    
                             WELLS =   0.12273E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    8730.3    
                  DELAY IB STORAGE =    1171.5    
 
                         Total OUT =   0.17356E+08
 
                          IN - OUT =   -1031.9    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  69
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.86764E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.57958E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.49458E+06
                  DELAY IB STORAGE =   0.28292E+06
 
                          Total IN =   0.18867E+08
 
             OUT:
             ----
                           STORAGE =   0.65632E+07
                     CONSTANT HEAD =    47514.    
                             WELLS =   0.12113E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.14722E+06
                  DELAY IB STORAGE =    1357.7    
 
                         Total OUT =   0.18873E+08
 
                          IN - OUT =   -5319.4    
 
               Percent Discrepancy =               -0.03
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  69
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.85030E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.57958E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.35880E+06
                  DELAY IB STORAGE =   0.28432E+06
 
                          Total IN =   0.18559E+08
 
             OUT:
             ----
                           STORAGE =   0.63451E+07
                     CONSTANT HEAD =    47508.    
                             WELLS =   0.12113E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    53660.    
                  DELAY IB STORAGE =    1635.5    
 
                         Total OUT =   0.18561E+08
 
                          IN - OUT =   -1798.1    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  69
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.83109E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.57958E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.27953E+06
                  DELAY IB STORAGE =   0.28451E+06
 
                          Total IN =   0.18288E+08
 
             OUT:
             ----
                           STORAGE =   0.61107E+07
                     CONSTANT HEAD =    47488.    
                             WELLS =   0.12113E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    16134.    
                  DELAY IB STORAGE =    1568.0    
 
                         Total OUT =   0.18289E+08
 
                          IN - OUT =   -982.15    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  69
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.79481E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.57958E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.25739E+06
                  DELAY IB STORAGE =   0.28259E+06
 
                          Total IN =   0.17901E+08
 
             OUT:
             ----
                           STORAGE =   0.57310E+07
                     CONSTANT HEAD =    47408.    
                             WELLS =   0.12113E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    9381.6    
                  DELAY IB STORAGE =    1298.8    
 
                         Total OUT =   0.17902E+08
 
                          IN - OUT =   -877.17    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  69
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.71672E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.57958E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.24984E+06
                  DELAY IB STORAGE =   0.27724E+06
 
                          Total IN =   0.17108E+08
 
             OUT:
             ----
                           STORAGE =   0.49390E+07
                     CONSTANT HEAD =    47094.    
                             WELLS =   0.12113E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7861.7    
                  DELAY IB STORAGE =    1017.2    
 
                         Total OUT =   0.17108E+08
 
                          IN - OUT =   -680.24    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  69
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.60944E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.57958E+07
                                ET =    0.0000    
                          RECHARGE =   0.36175E+07
                  INST. IB STORAGE =   0.23671E+06
                  DELAY IB STORAGE =   0.26225E+06
 
                          Total IN =   0.16007E+08
 
             OUT:
             ----
                           STORAGE =   0.38412E+07
                     CONSTANT HEAD =    46019.    
                             WELLS =   0.12113E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    6392.2    
                  DELAY IB STORAGE =    854.42    
 
                         Total OUT =   0.16008E+08
 
                          IN - OUT =   -1100.7    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  70
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.84333E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53102E+07
                                ET =    0.0000    
                          RECHARGE =   0.36807E+07
                  INST. IB STORAGE =   0.36089E+06
                  DELAY IB STORAGE =   0.26150E+06
 
                          Total IN =   0.18047E+08
 
             OUT:
             ----
                           STORAGE =   0.56574E+07
                     CONSTANT HEAD =    46017.    
                             WELLS =   0.11977E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.38022E+06
                  DELAY IB STORAGE =    1802.9    
 
                         Total OUT =   0.18063E+08
 
                          IN - OUT =   -16258.    
 
               Percent Discrepancy =               -0.09
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  70
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.82841E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53102E+07
                                ET =    0.0000    
                          RECHARGE =   0.36807E+07
                  INST. IB STORAGE =   0.28507E+06
                  DELAY IB STORAGE =   0.25980E+06
 
                          Total IN =   0.17820E+08
 
             OUT:
             ----
                           STORAGE =   0.56219E+07
                     CONSTANT HEAD =    46010.    
                             WELLS =   0.11977E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.17283E+06
                  DELAY IB STORAGE =    3169.2    
 
                         Total OUT =   0.17821E+08
 
                          IN - OUT =   -1554.5    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  70
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.81195E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53102E+07
                                ET =    0.0000    
                          RECHARGE =   0.36807E+07
                  INST. IB STORAGE =   0.24734E+06
                  DELAY IB STORAGE =   0.25819E+06
 
                          Total IN =   0.17616E+08
 
             OUT:
             ----
                           STORAGE =   0.55435E+07
                     CONSTANT HEAD =    45981.    
                             WELLS =   0.11977E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    46366.    
                  DELAY IB STORAGE =    3391.4    
 
                         Total OUT =   0.17617E+08
 
                          IN - OUT =   -841.58    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  70
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.79104E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53102E+07
                                ET =    0.0000    
                          RECHARGE =   0.36807E+07
                  INST. IB STORAGE =   0.23472E+06
                  DELAY IB STORAGE =   0.25573E+06
 
                          Total IN =   0.17392E+08
 
             OUT:
             ----
                           STORAGE =   0.53524E+07
                     CONSTANT HEAD =    45875.    
                             WELLS =   0.11977E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    14472.    
                  DELAY IB STORAGE =    2265.9    
 
                         Total OUT =   0.17392E+08
 
                          IN - OUT =   -709.90    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  70
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.75481E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53102E+07
                                ET =    0.0000    
                          RECHARGE =   0.36807E+07
                  INST. IB STORAGE =   0.23027E+06
                  DELAY IB STORAGE =   0.25022E+06
 
                          Total IN =   0.17019E+08
 
             OUT:
             ----
                           STORAGE =   0.49867E+07
                     CONSTANT HEAD =    45471.    
                             WELLS =   0.11977E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    9409.4    
                  DELAY IB STORAGE =    1378.0    
 
                         Total OUT =   0.17020E+08
 
                          IN - OUT =   -980.17    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  70
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.69790E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53102E+07
                                ET =    0.0000    
                          RECHARGE =   0.36807E+07
                  INST. IB STORAGE =   0.23698E+06
                  DELAY IB STORAGE =   0.23898E+06
 
                          Total IN =   0.16446E+08
 
             OUT:
             ----
                           STORAGE =   0.44163E+07
                     CONSTANT HEAD =    44120.    
                             WELLS =   0.11977E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7761.8    
                  DELAY IB STORAGE =    1076.1    
 
                         Total OUT =   0.16447E+08
 
                          IN - OUT =   -867.58    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  71
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.74328E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52926E+07
                                ET =    0.0000    
                          RECHARGE =   0.38020E+07
                  INST. IB STORAGE =   0.37651E+06
                  DELAY IB STORAGE =   0.23928E+06
 
                          Total IN =   0.17143E+08
 
             OUT:
             ----
                           STORAGE =   0.67205E+07
                     CONSTANT HEAD =    44117.    
                             WELLS =   0.10151E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.24024E+06
                  DELAY IB STORAGE =    1883.1    
 
                         Total OUT =   0.17158E+08
 
                          IN - OUT =   -14364.    
 
               Percent Discrepancy =               -0.08
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  71
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.73218E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52926E+07
                                ET =    0.0000    
                          RECHARGE =   0.38020E+07
                  INST. IB STORAGE =   0.29683E+06
                  DELAY IB STORAGE =   0.23953E+06
 
                          Total IN =   0.16953E+08
 
             OUT:
             ----
                           STORAGE =   0.66483E+07
                     CONSTANT HEAD =    44108.    
                             WELLS =   0.10151E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.10772E+06
                  DELAY IB STORAGE =    3188.0    
 
                         Total OUT =   0.16954E+08
 
                          IN - OUT =   -1373.1    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  71
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.71884E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52926E+07
                                ET =    0.0000    
                          RECHARGE =   0.38020E+07
                  INST. IB STORAGE =   0.25001E+06
                  DELAY IB STORAGE =   0.23920E+06
 
                          Total IN =   0.16772E+08
 
             OUT:
             ----
                           STORAGE =   0.65387E+07
                     CONSTANT HEAD =    44082.    
                             WELLS =   0.10151E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    35686.    
                  DELAY IB STORAGE =    3662.7    
 
                         Total OUT =   0.16773E+08
 
                          IN - OUT =   -710.78    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  71
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.69468E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52926E+07
                                ET =    0.0000    
                          RECHARGE =   0.38020E+07
                  INST. IB STORAGE =   0.23490E+06
                  DELAY IB STORAGE =   0.23697E+06
 
                          Total IN =   0.16513E+08
 
             OUT:
             ----
                           STORAGE =   0.63011E+07
                     CONSTANT HEAD =    44012.    
                             WELLS =   0.10151E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    15217.    
                  DELAY IB STORAGE =    2732.7    
 
                         Total OUT =   0.16514E+08
 
                          IN - OUT =   -588.15    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  71
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.64380E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52926E+07
                                ET =    0.0000    
                          RECHARGE =   0.38020E+07
                  INST. IB STORAGE =   0.23214E+06
                  DELAY IB STORAGE =   0.23163E+06
 
                          Total IN =   0.15996E+08
 
             OUT:
             ----
                           STORAGE =   0.57896E+07
                     CONSTANT HEAD =    43866.    
                             WELLS =   0.10151E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    11080.    
                  DELAY IB STORAGE =    1690.0    
 
                         Total OUT =   0.15997E+08
 
                          IN - OUT =   -725.95    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  71
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.56489E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52926E+07
                                ET =    0.0000    
                          RECHARGE =   0.38020E+07
                  INST. IB STORAGE =   0.22967E+06
                  DELAY IB STORAGE =   0.21790E+06
 
                          Total IN =   0.15191E+08
 
             OUT:
             ----
                           STORAGE =   0.49870E+07
                     CONSTANT HEAD =    43581.    
                             WELLS =   0.10151E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    9135.4    
                  DELAY IB STORAGE =    1342.5    
 
                         Total OUT =   0.15192E+08
 
                          IN - OUT =   -793.83    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  72
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.65382E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55359E+07
                                ET =    0.0000    
                          RECHARGE =   0.39834E+07
                  INST. IB STORAGE =   0.36263E+06
                  DELAY IB STORAGE =   0.21860E+06
 
                          Total IN =   0.16639E+08
 
             OUT:
             ----
                           STORAGE =   0.68273E+07
                     CONSTANT HEAD =    43580.    
                             WELLS =   0.96353E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.13433E+06
                  DELAY IB STORAGE =    2126.0    
 
                         Total OUT =   0.16643E+08
 
                          IN - OUT =   -3859.4    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  72
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.65302E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55359E+07
                                ET =    0.0000    
                          RECHARGE =   0.39834E+07
                  INST. IB STORAGE =   0.31280E+06
                  DELAY IB STORAGE =   0.21927E+06
 
                          Total IN =   0.16582E+08
 
             OUT:
             ----
                           STORAGE =   0.68364E+07
                     CONSTANT HEAD =    43575.    
                             WELLS =   0.96353E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    64567.    
                  DELAY IB STORAGE =    2922.2    
 
                         Total OUT =   0.16583E+08
 
                          IN - OUT =   -1273.1    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  72
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.64894E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55359E+07
                                ET =    0.0000    
                          RECHARGE =   0.39834E+07
                  INST. IB STORAGE =   0.27947E+06
                  DELAY IB STORAGE =   0.21954E+06
 
                          Total IN =   0.16508E+08
 
             OUT:
             ----
                           STORAGE =   0.68020E+07
                     CONSTANT HEAD =    43550.    
                             WELLS =   0.96353E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    24391.    
                  DELAY IB STORAGE =    3097.4    
 
                         Total OUT =   0.16508E+08
 
                          IN - OUT =   -702.92    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  72
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.63629E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55359E+07
                                ET =    0.0000    
                          RECHARGE =   0.39834E+07
                  INST. IB STORAGE =   0.27137E+06
                  DELAY IB STORAGE =   0.21853E+06
 
                          Total IN =   0.16372E+08
 
             OUT:
             ----
                           STORAGE =   0.66778E+07
                     CONSTANT HEAD =    43429.    
                             WELLS =   0.96353E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    13762.    
                  DELAY IB STORAGE =    2517.1    
 
                         Total OUT =   0.16373E+08
 
                          IN - OUT =   -638.63    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  72
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.60927E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55359E+07
                                ET =    0.0000    
                          RECHARGE =   0.39834E+07
                  INST. IB STORAGE =   0.26455E+06
                  DELAY IB STORAGE =   0.21490E+06
 
                          Total IN =   0.16092E+08
 
             OUT:
             ----
                           STORAGE =   0.64003E+07
                     CONSTANT HEAD =    42859.    
                             WELLS =   0.96353E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    11926.    
                  DELAY IB STORAGE =    1968.2    
 
                         Total OUT =   0.16092E+08
 
                          IN - OUT =   -912.36    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  72
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.56640E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.55359E+07
                                ET =    0.0000    
                          RECHARGE =   0.39834E+07
                  INST. IB STORAGE =   0.24906E+06
                  DELAY IB STORAGE =   0.20475E+06
 
                          Total IN =   0.15637E+08
 
             OUT:
             ----
                           STORAGE =   0.59489E+07
                     CONSTANT HEAD =    40866.    
                             WELLS =   0.96353E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    10964.    
                  DELAY IB STORAGE =    1785.6    
 
                         Total OUT =   0.15638E+08
 
                          IN - OUT =   -721.40    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  73
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.67879E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.58600E+07
                                ET =    0.0000    
                          RECHARGE =   0.39684E+07
                  INST. IB STORAGE =   0.44430E+06
                  DELAY IB STORAGE =   0.20590E+06
 
                          Total IN =   0.17267E+08
 
             OUT:
             ----
                           STORAGE =   0.67169E+07
                     CONSTANT HEAD =    40861.    
                             WELLS =   0.10435E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    75142.    
                  DELAY IB STORAGE =    1882.4    
 
                         Total OUT =   0.17270E+08
 
                          IN - OUT =   -3694.8    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  73
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.66580E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.58600E+07
                                ET =    0.0000    
                          RECHARGE =   0.39684E+07
                  INST. IB STORAGE =   0.33794E+06
                  DELAY IB STORAGE =   0.20722E+06
 
                          Total IN =   0.17032E+08
 
             OUT:
             ----
                           STORAGE =   0.65164E+07
                     CONSTANT HEAD =    40847.    
                             WELLS =   0.10435E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    37987.    
                  DELAY IB STORAGE =    2020.5    
 
                         Total OUT =   0.17033E+08
 
                          IN - OUT =   -1206.8    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  73
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.65272E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.58600E+07
                                ET =    0.0000    
                          RECHARGE =   0.39684E+07
                  INST. IB STORAGE =   0.27218E+06
                  DELAY IB STORAGE =   0.20719E+06
 
                          Total IN =   0.16835E+08
 
             OUT:
             ----
                           STORAGE =   0.63393E+07
                     CONSTANT HEAD =    40798.    
                             WELLS =   0.10435E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    17988.    
                  DELAY IB STORAGE =    2090.7    
 
                         Total OUT =   0.16836E+08
 
                          IN - OUT =   -673.05    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  73
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.63506E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.58600E+07
                                ET =    0.0000    
                          RECHARGE =   0.39684E+07
                  INST. IB STORAGE =   0.25358E+06
                  DELAY IB STORAGE =   0.20500E+06
 
                          Total IN =   0.16638E+08
 
             OUT:
             ----
                           STORAGE =   0.61483E+07
                     CONSTANT HEAD =    40629.    
                             WELLS =   0.10435E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    11903.    
                  DELAY IB STORAGE =    1869.5    
 
                         Total OUT =   0.16638E+08
 
                          IN - OUT =   -577.84    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  73
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.60159E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.58600E+07
                                ET =    0.0000    
                          RECHARGE =   0.39684E+07
                  INST. IB STORAGE =   0.24627E+06
                  DELAY IB STORAGE =   0.20091E+06
 
                          Total IN =   0.16291E+08
 
             OUT:
             ----
                           STORAGE =   0.58046E+07
                     CONSTANT HEAD =    40070.    
                             WELLS =   0.10435E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    10522.    
                  DELAY IB STORAGE =    1629.5    
 
                         Total OUT =   0.16292E+08
 
                          IN - OUT =   -791.61    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  73
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.54851E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.58600E+07
                                ET =    0.0000    
                          RECHARGE =   0.39684E+07
                  INST. IB STORAGE =   0.23241E+06
                  DELAY IB STORAGE =   0.19130E+06
 
                          Total IN =   0.15737E+08
 
             OUT:
             ----
                           STORAGE =   0.52529E+07
                     CONSTANT HEAD =    38453.    
                             WELLS =   0.10435E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    9628.0    
                  DELAY IB STORAGE =    1525.9    
 
                         Total OUT =   0.15738E+08
 
                          IN - OUT =   -733.07    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  74
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.75583E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53538E+07
                                ET =    0.0000    
                          RECHARGE =   0.39946E+07
                  INST. IB STORAGE =   0.47759E+06
                  DELAY IB STORAGE =   0.19213E+06
 
                          Total IN =   0.17576E+08
 
             OUT:
             ----
                           STORAGE =   0.10034E+08
                     CONSTANT HEAD =    38450.    
                             WELLS =   0.70892E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.41452E+06
                  DELAY IB STORAGE =    3457.7    
 
                         Total OUT =   0.17580E+08
 
                          IN - OUT =   -3319.2    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  74
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.74561E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53538E+07
                                ET =    0.0000    
                          RECHARGE =   0.39946E+07
                  INST. IB STORAGE =   0.31278E+06
                  DELAY IB STORAGE =   0.19229E+06
 
                          Total IN =   0.17310E+08
 
             OUT:
             ----
                           STORAGE =   0.99924E+07
                     CONSTANT HEAD =    38442.    
                             WELLS =   0.70892E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.18499E+06
                  DELAY IB STORAGE =    5643.2    
 
                         Total OUT =   0.17311E+08
 
                          IN - OUT =   -1135.4    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  74
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.73203E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53538E+07
                                ET =    0.0000    
                          RECHARGE =   0.39946E+07
                  INST. IB STORAGE =   0.23439E+06
                  DELAY IB STORAGE =   0.19102E+06
 
                          Total IN =   0.17094E+08
 
             OUT:
             ----
                           STORAGE =   0.99022E+07
                     CONSTANT HEAD =    38417.    
                             WELLS =   0.70892E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    58587.    
                  DELAY IB STORAGE =    6306.3    
 
                         Total OUT =   0.17095E+08
 
                          IN - OUT =   -630.91    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  74
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.70490E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53538E+07
                                ET =    0.0000    
                          RECHARGE =   0.39946E+07
                  INST. IB STORAGE =   0.21097E+06
                  DELAY IB STORAGE =   0.18843E+06
 
                          Total IN =   0.16797E+08
 
             OUT:
             ----
                           STORAGE =   0.96417E+07
                     CONSTANT HEAD =    38345.    
                             WELLS =   0.70892E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    23356.    
                  DELAY IB STORAGE =    4745.2    
 
                         Total OUT =   0.16797E+08
 
                          IN - OUT =   -598.47    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  74
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.64946E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53538E+07
                                ET =    0.0000    
                          RECHARGE =   0.39946E+07
                  INST. IB STORAGE =   0.21133E+06
                  DELAY IB STORAGE =   0.18331E+06
 
                          Total IN =   0.16238E+08
 
             OUT:
             ----
                           STORAGE =   0.90907E+07
                     CONSTANT HEAD =    38166.    
                             WELLS =   0.70892E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    17088.    
                  DELAY IB STORAGE =    2992.3    
 
                         Total OUT =   0.16238E+08
 
                          IN - OUT =   -460.65    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  74
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.55686E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.53538E+07
                                ET =    0.0000    
                          RECHARGE =   0.39946E+07
                  INST. IB STORAGE =   0.19361E+06
                  DELAY IB STORAGE =   0.17159E+06
 
                          Total IN =   0.15282E+08
 
             OUT:
             ----
                           STORAGE =   0.81388E+07
                     CONSTANT HEAD =    37764.    
                             WELLS =   0.70892E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    14499.    
                  DELAY IB STORAGE =    2344.6    
 
                         Total OUT =   0.15283E+08
 
                          IN - OUT =   -535.19    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  75
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.83681E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.48165E+07
                                ET =    0.0000    
                          RECHARGE =   0.40221E+07
                  INST. IB STORAGE =   0.51384E+06
                  DELAY IB STORAGE =   0.17168E+06
 
                          Total IN =   0.17892E+08
 
             OUT:
             ----
                           STORAGE =   0.93396E+07
                     CONSTANT HEAD =    37762.    
                             WELLS =   0.81614E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.35349E+06
                  DELAY IB STORAGE =    2765.4    
 
                         Total OUT =   0.17895E+08
 
                          IN - OUT =   -2902.1    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  75
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.81300E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.48165E+07
                                ET =    0.0000    
                          RECHARGE =   0.40221E+07
                  INST. IB STORAGE =   0.34418E+06
                  DELAY IB STORAGE =   0.17362E+06
 
                          Total IN =   0.17486E+08
 
             OUT:
             ----
                           STORAGE =   0.91352E+07
                     CONSTANT HEAD =    37756.    
                             WELLS =   0.81614E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.14802E+06
                  DELAY IB STORAGE =    4931.4    
 
                         Total OUT =   0.17487E+08
 
                          IN - OUT =   -882.96    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  75
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.79465E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.48165E+07
                                ET =    0.0000    
                          RECHARGE =   0.40221E+07
                  INST. IB STORAGE =   0.25432E+06
                  DELAY IB STORAGE =   0.17395E+06
 
                          Total IN =   0.17213E+08
 
             OUT:
             ----
                           STORAGE =   0.89673E+07
                     CONSTANT HEAD =    37740.    
                             WELLS =   0.81614E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    41958.    
                  DELAY IB STORAGE =    5429.9    
 
                         Total OUT =   0.17214E+08
 
                          IN - OUT =   -502.58    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  75
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.75859E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.48165E+07
                                ET =    0.0000    
                          RECHARGE =   0.40221E+07
                  INST. IB STORAGE =   0.23225E+06
                  DELAY IB STORAGE =   0.17261E+06
 
                          Total IN =   0.16829E+08
 
             OUT:
             ----
                           STORAGE =   0.86082E+07
                     CONSTANT HEAD =    37707.    
                             WELLS =   0.81614E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    18371.    
                  DELAY IB STORAGE =    4122.3    
 
                         Total OUT =   0.16830E+08
 
                          IN - OUT =   -448.97    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  75
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.68948E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.48165E+07
                                ET =    0.0000    
                          RECHARGE =   0.40221E+07
                  INST. IB STORAGE =   0.22852E+06
                  DELAY IB STORAGE =   0.17022E+06
 
                          Total IN =   0.16132E+08
 
             OUT:
             ----
                           STORAGE =   0.79159E+07
                     CONSTANT HEAD =    37698.    
                             WELLS =   0.81614E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    14625.    
                  DELAY IB STORAGE =    2781.1    
 
                         Total OUT =   0.16132E+08
 
                          IN - OUT =   -323.66    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  75
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.60595E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.48165E+07
                                ET =    0.0000    
                          RECHARGE =   0.40221E+07
                  INST. IB STORAGE =   0.22826E+06
                  DELAY IB STORAGE =   0.16635E+06
 
                          Total IN =   0.15293E+08
 
             OUT:
             ----
                           STORAGE =   0.70787E+07
                     CONSTANT HEAD =    37796.    
                             WELLS =   0.81614E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    12878.    
                  DELAY IB STORAGE =    2306.8    
 
                         Total OUT =   0.15293E+08
 
                          IN - OUT =   -371.06    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  76
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.62945E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52156E+07
                                ET =    0.0000    
                          RECHARGE =   0.41987E+07
                  INST. IB STORAGE =   0.29717E+06
                  DELAY IB STORAGE =   0.16665E+06
 
                          Total IN =   0.16173E+08
 
             OUT:
             ----
                           STORAGE =   0.80078E+07
                     CONSTANT HEAD =    37797.    
                             WELLS =   0.79799E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.14680E+06
                  DELAY IB STORAGE =    2989.8    
 
                         Total OUT =   0.16175E+08
 
                          IN - OUT =   -2795.8    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  76
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.62114E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52156E+07
                                ET =    0.0000    
                          RECHARGE =   0.41987E+07
                  INST. IB STORAGE =   0.24429E+06
                  DELAY IB STORAGE =   0.16677E+06
 
                          Total IN =   0.16037E+08
 
             OUT:
             ----
                           STORAGE =   0.79450E+07
                     CONSTANT HEAD =    37796.    
                             WELLS =   0.79799E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    71283.    
                  DELAY IB STORAGE =    3667.3    
 
                         Total OUT =   0.16038E+08
 
                          IN - OUT =   -895.67    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  76
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.61199E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52156E+07
                                ET =    0.0000    
                          RECHARGE =   0.41987E+07
                  INST. IB STORAGE =   0.21669E+06
                  DELAY IB STORAGE =   0.16646E+06
 
                          Total IN =   0.15917E+08
 
             OUT:
             ----
                           STORAGE =   0.78697E+07
                     CONSTANT HEAD =    37789.    
                             WELLS =   0.79799E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    26613.    
                  DELAY IB STORAGE =    3802.1    
 
                         Total OUT =   0.15918E+08
 
                          IN - OUT =   -480.56    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  76
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.59585E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52156E+07
                                ET =    0.0000    
                          RECHARGE =   0.41987E+07
                  INST. IB STORAGE =   0.20852E+06
                  DELAY IB STORAGE =   0.16563E+06
 
                          Total IN =   0.15747E+08
 
             OUT:
             ----
                           STORAGE =   0.77106E+07
                     CONSTANT HEAD =    37739.    
                             WELLS =   0.79799E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    15748.    
                  DELAY IB STORAGE =    3233.0    
 
                         Total OUT =   0.15747E+08
 
                          IN - OUT =   -411.78    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  76
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.56389E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52156E+07
                                ET =    0.0000    
                          RECHARGE =   0.41987E+07
                  INST. IB STORAGE =   0.20226E+06
                  DELAY IB STORAGE =   0.16380E+06
 
                          Total IN =   0.15419E+08
 
             OUT:
             ----
                           STORAGE =   0.73859E+07
                     CONSTANT HEAD =    37440.    
                             WELLS =   0.79799E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    13837.    
                  DELAY IB STORAGE =    2659.5    
 
                         Total OUT =   0.15420E+08
 
                          IN - OUT =   -489.13    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  76
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.51506E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.52156E+07
                                ET =    0.0000    
                          RECHARGE =   0.41987E+07
                  INST. IB STORAGE =   0.19350E+06
                  DELAY IB STORAGE =   0.15884E+06
 
                          Total IN =   0.14917E+08
 
             OUT:
             ----
                           STORAGE =   0.68862E+07
                     CONSTANT HEAD =    36240.    
                             WELLS =   0.79799E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    12826.    
                  DELAY IB STORAGE =    2412.5    
 
                         Total OUT =   0.14918E+08
 
                          IN - OUT =   -379.36    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  77
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.95244E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.43921E+07
                                ET =    0.0000    
                          RECHARGE =   0.41593E+07
                  INST. IB STORAGE =   0.60895E+06
                  DELAY IB STORAGE =   0.16139E+06
 
                          Total IN =   0.18846E+08
 
             OUT:
             ----
                           STORAGE =   0.70951E+07
                     CONSTANT HEAD =    36238.    
                             WELLS =   0.11578E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.13668E+06
                  DELAY IB STORAGE =    2926.0    
 
                         Total OUT =   0.18849E+08
 
                          IN - OUT =   -2984.8    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  77
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.93595E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.43921E+07
                                ET =    0.0000    
                          RECHARGE =   0.41593E+07
                  INST. IB STORAGE =   0.37974E+06
                  DELAY IB STORAGE =   0.16418E+06
 
                          Total IN =   0.18455E+08
 
             OUT:
             ----
                           STORAGE =   0.67979E+07
                     CONSTANT HEAD =    36230.    
                             WELLS =   0.11578E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    40610.    
                  DELAY IB STORAGE =    2829.0    
 
                         Total OUT =   0.18456E+08
 
                          IN - OUT =   -962.62    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  77
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.91961E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.43921E+07
                                ET =    0.0000    
                          RECHARGE =   0.41593E+07
                  INST. IB STORAGE =   0.25841E+06
                  DELAY IB STORAGE =   0.16465E+06
 
                          Total IN =   0.18171E+08
 
             OUT:
             ----
                           STORAGE =   0.65391E+07
                     CONSTANT HEAD =    36205.    
                             WELLS =   0.11578E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    15158.    
                  DELAY IB STORAGE =    2411.3    
 
                         Total OUT =   0.18171E+08
 
                          IN - OUT =   -492.70    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  77
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.88452E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.43921E+07
                                ET =    0.0000    
                          RECHARGE =   0.41593E+07
                  INST. IB STORAGE =   0.22753E+06
                  DELAY IB STORAGE =   0.16274E+06
 
                          Total IN =   0.17787E+08
 
             OUT:
             ----
                           STORAGE =   0.61606E+07
                     CONSTANT HEAD =    36129.    
                             WELLS =   0.11578E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    10376.    
                  DELAY IB STORAGE =    1990.9    
 
                         Total OUT =   0.17787E+08
 
                          IN - OUT =   -425.95    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  77
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.81268E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.43921E+07
                                ET =    0.0000    
                          RECHARGE =   0.41593E+07
                  INST. IB STORAGE =   0.22596E+06
                  DELAY IB STORAGE =   0.16179E+06
 
                          Total IN =   0.17066E+08
 
             OUT:
             ----
                           STORAGE =   0.54418E+07
                     CONSTANT HEAD =    35918.    
                             WELLS =   0.11578E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    8945.4    
                  DELAY IB STORAGE =    1642.1    
 
                         Total OUT =   0.17067E+08
 
                          IN - OUT =   -513.27    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  77
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.72209E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.43921E+07
                                ET =    0.0000    
                          RECHARGE =   0.41593E+07
                  INST. IB STORAGE =   0.22957E+06
                  DELAY IB STORAGE =   0.16120E+06
 
                          Total IN =   0.16163E+08
 
             OUT:
             ----
                           STORAGE =   0.45409E+07
                     CONSTANT HEAD =    35374.    
                             WELLS =   0.11578E+08
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7663.5    
                  DELAY IB STORAGE =    1453.5    
 
                         Total OUT =   0.16164E+08
 
                          IN - OUT =   -487.53    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  78
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.72964E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.34851E+07
                                ET =    0.0000    
                          RECHARGE =   0.42834E+07
                  INST. IB STORAGE =   0.43849E+06
                  DELAY IB STORAGE =   0.16122E+06
 
                          Total IN =   0.15665E+08
 
             OUT:
             ----
                           STORAGE =   0.62025E+07
                     CONSTANT HEAD =    35372.    
                             WELLS =   0.90693E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.35799E+06
                  DELAY IB STORAGE =    2382.0    
 
                         Total OUT =   0.15667E+08
 
                          IN - OUT =   -2798.6    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  78
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.69541E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.34851E+07
                                ET =    0.0000    
                          RECHARGE =   0.42834E+07
                  INST. IB STORAGE =   0.29665E+06
                  DELAY IB STORAGE =   0.16209E+06
 
                          Total IN =   0.15181E+08
 
             OUT:
             ----
                           STORAGE =   0.59277E+07
                     CONSTANT HEAD =    35367.    
                             WELLS =   0.90693E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.14530E+06
                  DELAY IB STORAGE =    4574.7    
 
                         Total OUT =   0.15182E+08
 
                          IN - OUT =   -866.80    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  78
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.67207E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.34851E+07
                                ET =    0.0000    
                          RECHARGE =   0.42834E+07
                  INST. IB STORAGE =   0.23885E+06
                  DELAY IB STORAGE =   0.16254E+06
 
                          Total IN =   0.14891E+08
 
             OUT:
             ----
                           STORAGE =   0.57439E+07
                     CONSTANT HEAD =    35344.    
                             WELLS =   0.90693E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    37570.    
                  DELAY IB STORAGE =    4972.2    
 
                         Total OUT =   0.14891E+08
 
                          IN - OUT =   -458.29    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  78
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.64488E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.34851E+07
                                ET =    0.0000    
                          RECHARGE =   0.42834E+07
                  INST. IB STORAGE =   0.22306E+06
                  DELAY IB STORAGE =   0.16222E+06
 
                          Total IN =   0.14603E+08
 
             OUT:
             ----
                           STORAGE =   0.54819E+07
                     CONSTANT HEAD =    35253.    
                             WELLS =   0.90693E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    13227.    
                  DELAY IB STORAGE =    3437.6    
 
                         Total OUT =   0.14603E+08
 
                          IN - OUT =   -430.74    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  78
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.59869E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.34851E+07
                                ET =    0.0000    
                          RECHARGE =   0.42834E+07
                  INST. IB STORAGE =   0.21454E+06
                  DELAY IB STORAGE =   0.16107E+06
 
                          Total IN =   0.14131E+08
 
             OUT:
             ----
                           STORAGE =   0.50156E+07
                     CONSTANT HEAD =    34887.    
                             WELLS =   0.90693E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    9464.9    
                  DELAY IB STORAGE =    2088.8    
 
                         Total OUT =   0.14131E+08
 
                          IN - OUT =   -333.42    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  78
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.53542E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.34851E+07
                                ET =    0.0000    
                          RECHARGE =   0.42834E+07
                  INST. IB STORAGE =   0.20335E+06
                  DELAY IB STORAGE =   0.15800E+06
 
                          Total IN =   0.13484E+08
 
             OUT:
             ----
                           STORAGE =   0.43721E+07
                     CONSTANT HEAD =    33652.    
                             WELLS =   0.90693E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7989.6    
                  DELAY IB STORAGE =    1594.9    
 
                         Total OUT =   0.13485E+08
 
                          IN - OUT =   -527.26    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  79
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.57405E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.29033E+07
                                ET =    0.0000    
                          RECHARGE =   0.43944E+07
                  INST. IB STORAGE =   0.27911E+06
                  DELAY IB STORAGE =   0.15819E+06
 
                          Total IN =   0.13475E+08
 
             OUT:
             ----
                           STORAGE =   0.52043E+07
                     CONSTANT HEAD =    33650.    
                             WELLS =   0.80810E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.15715E+06
                  DELAY IB STORAGE =    2210.8    
 
                         Total OUT =   0.13478E+08
 
                          IN - OUT =   -2781.8    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  79
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.56449E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.29033E+07
                                ET =    0.0000    
                          RECHARGE =   0.43944E+07
                  INST. IB STORAGE =   0.22127E+06
                  DELAY IB STORAGE =   0.15796E+06
 
                          Total IN =   0.13322E+08
 
             OUT:
             ----
                           STORAGE =   0.51306E+07
                     CONSTANT HEAD =    33643.    
                             WELLS =   0.80810E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    74661.    
                  DELAY IB STORAGE =    2919.3    
 
                         Total OUT =   0.13323E+08
 
                          IN - OUT =   -897.65    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  79
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.55340E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.29033E+07
                                ET =    0.0000    
                          RECHARGE =   0.43944E+07
                  INST. IB STORAGE =   0.19561E+06
                  DELAY IB STORAGE =   0.15758E+06
 
                          Total IN =   0.13185E+08
 
             OUT:
             ----
                           STORAGE =   0.50429E+07
                     CONSTANT HEAD =    33627.    
                             WELLS =   0.80810E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    24702.    
                  DELAY IB STORAGE =    3145.5    
 
                         Total OUT =   0.13185E+08
 
                          IN - OUT =   -466.09    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  79
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.53726E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.29033E+07
                                ET =    0.0000    
                          RECHARGE =   0.43944E+07
                  INST. IB STORAGE =   0.18780E+06
                  DELAY IB STORAGE =   0.15672E+06
 
                          Total IN =   0.13015E+08
 
             OUT:
             ----
                           STORAGE =   0.48872E+07
                     CONSTANT HEAD =    33611.    
                             WELLS =   0.80810E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    10929.    
                  DELAY IB STORAGE =    2454.9    
 
                         Total OUT =   0.13015E+08
 
                          IN - OUT =   -403.30    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  79
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.50708E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.29033E+07
                                ET =    0.0000    
                          RECHARGE =   0.43944E+07
                  INST. IB STORAGE =   0.18199E+06
                  DELAY IB STORAGE =   0.15498E+06
 
                          Total IN =   0.12705E+08
 
             OUT:
             ----
                           STORAGE =   0.45810E+07
                     CONSTANT HEAD =    33744.    
                             WELLS =   0.80810E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    8326.3    
                  DELAY IB STORAGE =    1681.9    
 
                         Total OUT =   0.12706E+08
 
                          IN - OUT =   -298.94    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  79
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.46331E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.29033E+07
                                ET =    0.0000    
                          RECHARGE =   0.43944E+07
                  INST. IB STORAGE =   0.17207E+06
                  DELAY IB STORAGE =   0.15052E+06
 
                          Total IN =   0.12253E+08
 
             OUT:
             ----
                           STORAGE =   0.41296E+07
                     CONSTANT HEAD =    34460.    
                             WELLS =   0.80810E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7368.1    
                  DELAY IB STORAGE =    1415.1    
 
                         Total OUT =   0.12254E+08
 
                          IN - OUT =   -461.89    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  80
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.58778E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.27181E+07
                                ET =    0.0000    
                          RECHARGE =   0.44422E+07
                  INST. IB STORAGE =   0.28078E+06
                  DELAY IB STORAGE =   0.15133E+06
 
                          Total IN =   0.13470E+08
 
             OUT:
             ----
                           STORAGE =   0.46938E+07
                     CONSTANT HEAD =    34462.    
                             WELLS =   0.85994E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =   0.14286E+06
                  DELAY IB STORAGE =    2332.5    
 
                         Total OUT =   0.13473E+08
 
                          IN - OUT =   -2668.6    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  80
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.58442E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.27181E+07
                                ET =    0.0000    
                          RECHARGE =   0.44422E+07
                  INST. IB STORAGE =   0.21848E+06
                  DELAY IB STORAGE =   0.15193E+06
 
                          Total IN =   0.13375E+08
 
             OUT:
             ----
                           STORAGE =   0.46762E+07
                     CONSTANT HEAD =    34469.    
                             WELLS =   0.85994E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    62398.    
                  DELAY IB STORAGE =    3233.1    
 
                         Total OUT =   0.13376E+08
 
                          IN - OUT =   -833.96    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  80
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.57973E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.27181E+07
                                ET =    0.0000    
                          RECHARGE =   0.44422E+07
                  INST. IB STORAGE =   0.19011E+06
                  DELAY IB STORAGE =   0.15221E+06
 
                          Total IN =   0.13300E+08
 
             OUT:
             ----
                           STORAGE =   0.46443E+07
                     CONSTANT HEAD =    34496.    
                             WELLS =   0.85994E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    18925.    
                  DELAY IB STORAGE =    3284.8    
 
                         Total OUT =   0.13300E+08
 
                          IN - OUT =   -444.96    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  80
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.56954E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.27181E+07
                                ET =    0.0000    
                          RECHARGE =   0.44422E+07
                  INST. IB STORAGE =   0.18671E+06
                  DELAY IB STORAGE =   0.15217E+06
 
                          Total IN =   0.13195E+08
 
             OUT:
             ----
                           STORAGE =   0.45491E+07
                     CONSTANT HEAD =    34600.    
                             WELLS =   0.85994E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    9342.4    
                  DELAY IB STORAGE =    2477.2    
 
                         Total OUT =   0.13195E+08
 
                          IN - OUT =   -358.36    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  80
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.54791E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.27181E+07
                                ET =    0.0000    
                          RECHARGE =   0.44422E+07
                  INST. IB STORAGE =   0.19874E+06
                  DELAY IB STORAGE =   0.15196E+06
 
                          Total IN =   0.12990E+08
 
             OUT:
             ----
                           STORAGE =   0.43464E+07
                     CONSTANT HEAD =    35000.    
                             WELLS =   0.85994E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7841.2    
                  DELAY IB STORAGE =    1692.0    
 
                         Total OUT =   0.12990E+08
 
                          IN - OUT =   -209.01    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  80
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.51671E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.27181E+07
                                ET =    0.0000    
                          RECHARGE =   0.44422E+07
                  INST. IB STORAGE =   0.19850E+06
                  DELAY IB STORAGE =   0.15150E+06
 
                          Total IN =   0.12677E+08
 
             OUT:
             ----
                           STORAGE =   0.40335E+07
                     CONSTANT HEAD =    36204.    
                             WELLS =   0.85994E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7164.9    
                  DELAY IB STORAGE =    1386.0    
 
                         Total OUT =   0.12678E+08
 
                          IN - OUT =   -220.71    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   1 of Stress Period  81
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.57799E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.24262E+07
                                ET =    0.0000    
                          RECHARGE =   0.45126E+07
                  INST. IB STORAGE =   0.34239E+06
                  DELAY IB STORAGE =   0.15217E+06
 
                          Total IN =   0.13213E+08
 
             OUT:
             ----
                           STORAGE =   0.47032E+07
                     CONSTANT HEAD =    36208.    
                             WELLS =   0.83839E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    91095.    
                  DELAY IB STORAGE =    1637.9    
 
                         Total OUT =   0.13216E+08
 
                          IN - OUT =   -2745.4    
 
               Percent Discrepancy =               -0.02
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   2 of Stress Period  81
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.56906E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.24262E+07
                                ET =    0.0000    
                          RECHARGE =   0.45126E+07
                  INST. IB STORAGE =   0.26189E+06
                  DELAY IB STORAGE =   0.15261E+06
 
                          Total IN =   0.13044E+08
 
             OUT:
             ----
                           STORAGE =   0.45878E+07
                     CONSTANT HEAD =    36219.    
                             WELLS =   0.83839E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    35213.    
                  DELAY IB STORAGE =    1699.3    
 
                         Total OUT =   0.13045E+08
 
                          IN - OUT =   -897.23    
 
               Percent Discrepancy =               -0.01
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   3 of Stress Period  81
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.56031E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.24262E+07
                                ET =    0.0000    
                          RECHARGE =   0.45126E+07
                  INST. IB STORAGE =   0.23111E+06
                  DELAY IB STORAGE =   0.15256E+06
 
                          Total IN =   0.12926E+08
 
             OUT:
             ----
                           STORAGE =   0.44913E+07
                     CONSTANT HEAD =    36260.    
                             WELLS =   0.83839E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    13030.    
                  DELAY IB STORAGE =    1658.1    
 
                         Total OUT =   0.12926E+08
 
                          IN - OUT =   -525.15    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   4 of Stress Period  81
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.54692E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.24262E+07
                                ET =    0.0000    
                          RECHARGE =   0.45126E+07
                  INST. IB STORAGE =   0.22768E+06
                  DELAY IB STORAGE =   0.15220E+06
 
                          Total IN =   0.12788E+08
 
             OUT:
             ----
                           STORAGE =   0.43585E+07
                     CONSTANT HEAD =    36397.    
                             WELLS =   0.83839E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    8071.7    
                  DELAY IB STORAGE =    1486.9    
 
                         Total OUT =   0.12788E+08
 
                          IN - OUT =   -472.71    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   5 of Stress Period  81
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.52399E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.24262E+07
                                ET =    0.0000    
                          RECHARGE =   0.45126E+07
                  INST. IB STORAGE =   0.22194E+06
                  DELAY IB STORAGE =   0.15167E+06
 
                          Total IN =   0.12552E+08
 
             OUT:
             ----
                           STORAGE =   0.41234E+07
                     CONSTANT HEAD =    36841.    
                             WELLS =   0.83839E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    7114.6    
                  DELAY IB STORAGE =    1328.0    
 
                         Total OUT =   0.12553E+08
 
                          IN - OUT =   -349.96    
 
               Percent Discrepancy =                0.00
1
                                                                                 
 
     Flow Budget for Zone  1 at Time Step   6 of Stress Period  81
     -------------------------------------------------------------
 
                       Budget Term     Flow (L**3/T)
                       -----------------------------

             IN:
             ---
                           STORAGE =   0.48682E+07
                     CONSTANT HEAD =    0.0000    
                             WELLS =   0.24262E+07
                                ET =    0.0000    
                          RECHARGE =   0.45126E+07
                  INST. IB STORAGE =   0.21105E+06
                  DELAY IB STORAGE =   0.15026E+06
 
                          Total IN =   0.12168E+08
 
             OUT:
             ----
                           STORAGE =   0.37396E+07
                     CONSTANT HEAD =    38077.    
                             WELLS =   0.83839E+07
                                ET =    0.0000    
                          RECHARGE =    0.0000    
                  INST. IB STORAGE =    6436.4    
                  DELAY IB STORAGE =    1214.0    
 
                         Total OUT =   0.12169E+08
 
                          IN - OUT =   -967.29    
 
               Percent Discrepancy =               -0.01
