Defining the Validation of Completion
Previous Topic  Next Topic 

The criteria for completion of a PFEP  is based on the requirements of the PFEP owner.  Key data elements which need to be captured on a PFEP document in order for a PFEP to be considered complete is set behind the scenes by an Administrator.  Upon login each user will see the validation criteria selected and see the results of how many PFEP documents are considered complete. 


In the below example, of the total 37733 PFEPs only 13125 are considered complete or 34.78%.   The completion validation is based on the criteria that have been selected in all validation tabs, i.e., Validate Point of Use, Validate Plant Logistics, Validate External Logistics.