Configuring the DS-System : Configuring scheduled tasks : Scheduling delta chain optimization
 
Scheduling delta chain optimization
Delta chain optimization is scheduled on the DS-System. Each task will perform one pass through the selected backup directories on the DS-System. During optimization, DS-System enforces the master-delta chain length to the files in each directory. For more information, see: “Configuring the delta chain settings”.
To schedule delta chain optimization:
1. On the Setup menu, click Schedule. The Schedules dialog box appears.
F1 Help: "Schedules"
2. To add a scheduled task, click Add. The New Schedule Wizard appears.
NOTE:  To edit a scheduled task, select it and click Edit.
F1 Help: "New Schedule Wizard - Select Schedule Type"
3. On the Select Schedule Type page, select Delta Chain Optimization, and then click Next.
4. On the Select Schedule Time page, do the following:
a) Under Detail Type, select the frequency of the schedule.
b) Under Daily Frequency, specify when the schedule will start, and optionally, when to force the scheduled activity to end.
c) Click Next.
F1 Help: "Schedule - Select Schedule Time"
5. On the Options page, do the following:
a) Beside the Optimization selection box, select what will be optimized.
 
Modified Directories
(Default) The delta chain optimization task will only process directories the DS-System has flagged as ‘modified’ since the last optimization task was run.
All Backup Sets
The optimization task will run on all backup sets on the DS-System.
Modified Backup Sets
The optimization task will only run on modified backup sets. For each backup set, optimization will process all directories.
b) Beside the Concurrent optimization processes box, select how many processes to run at the same time.
F1 Help: "Schedule - Options (Delta Chain Optimization)"
6. Click Finish.