DS-Operator F1 Help for GUI (Context-Sensitive) : Administrator Notification Settings
 
Administrator Notification Settings
This dialog box allows you to configure the Administrator notification settings.
 
Customer / DS-Client storage quota has reached Stop Backup level.
Select to enable notification at the selected frequency.
Free space on Storage Location(s) has reached:
• Warning level
• Emergency level
• Stop level
Select to enable notification at the selected frequency.
• Notifications are sent when any of the Storage Locations reaches the corresponding level.
• These levels are set by the OLWarnLevel, OLEmerLevel, and OLStopLevel parameters (Setup Menu > Advanced Configurations dialog box).
 
Notifications will be sent for Physical space on the Storage Locations.
• Physical space is represented by the “Disk Space” column in the "Extensible Storage Locations" dialog box (Setup Menu > Storage > Extensible Storage). If any location reaches a notification level, then a notification is sent.
Storage usage summary, notify between [hh] and [hh].
Select to enable notification between the listed hours.
• DS-System will send one notification email with the previous day’s (00:00:00-23:59:59) storage usage.
License will expire in [...] days
Select to enable notification at the selected frequency.
DS-System has reached [..]% of the license’s storage capacity limit.
Select to enable notification at the selected frequency.
Connection between Director and Leaf was lost
(N+1 DS-System only)
Select to enable notification each time this event occurs.
N+1 formation process succeeded
(N+1 DS-System only)
Select to enable notification each time this event occurs.
Storage Lock for Snapshot
Select to enable notification when the storage is locked or unlocked.
• This option only appears if the AllowStorageLock value is “1” (True) in DS-System Advanced Configurations.
Remote DS-VDR restore activity has finished
Select to enable notification at the selected frequency.
A DR Drill was activated
[DS-System using DS-License Server RLM only]
Select to send an email notification each time a DR Drill is activated (status becomes “Active”).
DS-System is in “Critical Status”.
Select to enable notification each time this event occurs.