Viewing scheduled backups
The schedule calendar is a visual representation of the backup schedules and backups that are scheduled or performed. You can see schedules that overlap (which might cause higher network traffic) or errors that have occurred during backup sessions.
To view the Schedule Calendar:
1. In the DS-User main window, click the Backup Schedules tab.
2. On the Schedule menu, click Schedule Calendar.
3. By default, the Schedule Calendar dialog box shows all schedules for the current week. To change the display, select a different display parameter in the Schedule(s), Week starting, and Display interval boxes.
4. To display the schedules/processes for a particular time period, click on the cell that contains the time. The Description section displays the details of the selected schedule.
5. To display processes that have run, in the Show section, click Performed. The numbers in the calendar reflect the actual number of backups at that time.
• Click a time cell with a number to display the sets that were backed up. In the Cell Details section, you can browse all backup sets that ran.